Calendar day Every day shown on the calendar, including Saturdays, Sundays, anddepartment-specified holidays.Certificate <strong>of</strong> compliance A document, provided by a manufacturer, producer, or supplier <strong>of</strong> aproduct, stating that the product as furnished to the contractor complieswith the pertinent specifications and contract requirements.Certified report <strong>of</strong> test or analysis A certified test report, provided by a manufacturer, producer, or supplier<strong>of</strong> a product, indicating that actual results <strong>of</strong> tests or analyses complywith the elements <strong>of</strong> the specification requirements.Completion date The calendar date shown in the proposal on or before which the workcontemplated under the contract shall be completed.Construction limits The limits <strong>of</strong> grading or other work generally defined by slope stakes<strong>of</strong>fset from the actual slope intercepts or limits <strong>of</strong> the work.Consulting firm The individual, partnership, joint ventures, corporation, or agencycontracted by the department to act directly or as a duly authorizedconstruction representative providing services for the department.Contract The written agreement between the department and the contractorsetting forth the obligations <strong>of</strong> the parties to the contract, including, butnot limited to, performance <strong>of</strong> the work, furnishing <strong>of</strong> labor andmaterials, and basis <strong>of</strong> payment.The contract includes the notice to contractors, proposal, contract form,contract bond, standard specifications, supplemental specifications,interim supplemental specifications, special provisions, addenda,general plans, detailed plans, notice to proceed, and contract changeorders and agreements required to complete the construction <strong>of</strong> thework in an acceptable manner, including authorized extensions, all <strong>of</strong>which constitute one instrument.Contract bond The approved form <strong>of</strong> security, executed by the contractor and thecontractor’s surety or sureties, guaranteeing the performance <strong>of</strong> thecontract work, completion <strong>of</strong> the contract requirements, and thepayment <strong>of</strong> claims as provided in 779.14 <strong>of</strong> the <strong>Wisconsin</strong> statutes.Contract change order A written order or authorization executed by the engineer covering worknot otherwise provided for in the contract, revisions in or amendmentsto the contract, or conditions specifically prescribed in the specificationsas requiring contract change orders. The change order documentbecomes a part <strong>of</strong> the contract when executed by the department.Contract modification Any change to the contract made after it is executed, including but notlimited to, the following:- A contract change order.- A supplemental contract agreement.- An administrative change adding a non-bid item.- A general administrative change.Contract period The period from the specified date <strong>of</strong> commencing work to the date thatthe specified number <strong>of</strong> calendar or working days has elapsed, bothdates inclusive, or from the specified date <strong>of</strong> commencing work to thespecified completion date, both dates inclusive; as specified in thecontract.Contract revision See: contract modificationContract time The number <strong>of</strong> calendar or working days shown in the proposalrepresenting the time allowed for the completion <strong>of</strong> the workcontemplated in the contract.Effective October 20<strong>01</strong>4<strong>Supplement</strong>al Specifications - 20<strong>01</strong> Edition
Contractor The individual, partnership, joint venture, corporation, limited liabilitycompany, limited liability partnership, or agency undertaking theperformance <strong>of</strong> the work under the terms <strong>of</strong> the contract and actingdirectly or through a duly authorized representative.Controlling item <strong>of</strong> work An activity shown on the project schedule, that if delayed, delayscompletion <strong>of</strong> the project.Culvert A structure not classified as a bridge that provides an opening under aroadway.<strong>Department</strong> The <strong>Wisconsin</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>.Detour An existing, permanent road designated as a temporary route to carryvehicular traffic around a section <strong>of</strong> a highway closed to through traffic.District The department's transportation district <strong>of</strong>fice.Divided highway A highway with separate roadways for traffic in opposite directions.Engineer The secretary <strong>of</strong> the department <strong>of</strong> transportation or the secretary’sauthorized representative limited by the particular duties assigned tothe representative.Equipment All machinery and articles necessary for the proper construction andacceptable completion <strong>of</strong> the work. This includes the supplies, tools,and apparatus for upkeep and maintenance <strong>of</strong> the equipment.Erosion control implementation plan The erosion control implementation plan, or ECIP, as required underTrans 4<strong>01</strong> <strong>of</strong> the <strong>Wisconsin</strong> administrative code.Extra work All work performed by the contractor, with approval <strong>of</strong> the engineer, thatdoes not appear in the proposal or contract as a specific bid itemaccompanied by a unit price, and that is not included under the pricebid for other bid items in the contract. Extra work may also consist <strong>of</strong>additions to, or changes in, design <strong>of</strong> contract bid items or portions <strong>of</strong>contract bid items, if additions are wholly disassociated from or outsidethe scope <strong>of</strong> work in the contract, and if the work caused by theseadditions or changes must be performed under conditions or in amanner materially different from the conditions and manner existent forcontract bid items under the original scope <strong>of</strong> work.Force account A method <strong>of</strong> payment based on the cost <strong>of</strong> labor, equipment, materialsfurnished, and consideration for overhead and pr<strong>of</strong>it as specified in109.4.5.Frontage road or street A local road or street auxiliary to and located along the side <strong>of</strong> anarterial highway for service to abutting property and adjoining areas andfor control <strong>of</strong> access.Hazardous substance A substance or combination <strong>of</strong> substances, including waste <strong>of</strong> a solid,semisolid, liquid, or gaseous form, that may cause or significantlycontribute to an increase in mortality or an increase in serious,irreversible, or incapacitating, reversible illness, or that may pose asubstantial present or potential hazard to human health or theenvironment.Highway, street, or road A public way for the purpose <strong>of</strong> vehicular travel, including the entirearea within the right-<strong>of</strong>-way.Highway separation A structure carrying highway traffic over or under another highway orstreet.Effective October 20<strong>01</strong>5<strong>Supplement</strong>al Specifications - 20<strong>01</strong> Edition
- Page 1 and 2: STATE OF WISCONSINDEPARTMENT OF TRA
- Page 3 and 4: PREFACEWisconsin Department Of Tran
- Page 5 and 6: PREFACESECTION 102 BIDDING REQUIREM
- Page 7 and 8: PREFACE104.2 Revisions to the Contr
- Page 9 and 10: PREFACE106.2 Supply Source and Qual
- Page 11 and 12: PREFACE108.6 Character of WorkersCo
- Page 13 and 14: PREFACE501.3.9 PozzolansAdd this ne
- Page 15 and 16: PREFACE643.2.4 DrumsRevise this sub
- Page 17 and 18: TABLE OF CONTENTSPART IGENERAL REQU
- Page 19 and 20: TABLE OF CONTENTS501.3.6.4.4 Physic
- Page 21 and 22: TABLE OF CONTENTS628.2.5.1 Geotexti
- Page 23 and 24: PART IGENERAL REQUIREMENTS AND COVE
- Page 25: 101.3 DefinitionsSAE Society of Aut
- Page 29 and 30: Pavement structure The combination
- Page 31 and 32: Surface course One or more layers o
- Page 33 and 34: 102.3.2 Department May Not Issue(1)
- Page 35 and 36: 102.7.1.2 Bidder-Generated Schedule
- Page 37 and 38: 102.13 Disqualification of Bidders1
- Page 39 and 40: 103.5 Contract Bond(1) At the time
- Page 41 and 42: 104.2.2.3 Change Orders for Enginee
- Page 43 and 44: (2) The department understands that
- Page 45 and 46: to open sections of the road to pub
- Page 47 and 48: (3) The cost of final cleanup is in
- Page 49 and 50: 5. A statement specifying the time
- Page 51 and 52: 105.1 Engineer's AuthoritySECTION 1
- Page 53 and 54: (4) If there is a discrepancy on a
- Page 55 and 56: 105.8 Authority and Duties of Inspe
- Page 57 and 58: (2) The engineer may deny the appli
- Page 59 and 60: 105.13.6 Review Panel(1) If the con
- Page 61 and 62: 106.2.4 Conditional Approval of Mat
- Page 63 and 64: (2) Required sampling and testing m
- Page 65 and 66: SECTION 107 LEGAL RELATIONS AND RES
- Page 67 and 68: 107.12 Responsibility for Damage an
- Page 69 and 70: (4) Do not blast on the railroad's
- Page 71 and 72: (2) Conduct all work over, on, or a
- Page 73 and 74: 107.23 Antitrust Assignment Clause(
- Page 75 and 76: 108.1 Subletting the ContractSECTIO
- Page 77 and 78:
108.4.2.2 Monthly Progress Meetings
- Page 79 and 80:
108.4.3.4 Engineer's Right to Reque
- Page 81 and 82:
8. Show completing the work within
- Page 83 and 84:
108.6 Character of Workers(1) Provi
- Page 85 and 86:
108.9.3 Contract Time for Calendar
- Page 87 and 88:
(2) This deducted sum is not a pena
- Page 89 and 90:
(5) The department may allow the co
- Page 91 and 92:
(2) The engineer will determine the
- Page 93 and 94:
(3) Provide the justification withi
- Page 95 and 96:
(7) For equipment not listed in the
- Page 97 and 98:
(2) General field supervision costs
- Page 99 and 100:
109.6.3.2 Materials109.6.3.2.1 Gene
- Page 101 and 102:
PART IIEARTHWORK201.2 Construction
- Page 103 and 104:
205.2.6 Unclassified ExcavationDele
- Page 105 and 106:
(9) Backfilling of structural plate
- Page 107 and 108:
PART IIIBASE COURSES304.1 Descripti
- Page 109 and 110:
304.2.6 Gradation RequirementsRepla
- Page 111 and 112:
308.5 Basis of PaymentReplace parag
- Page 113 and 114:
401.3.4 Asphalt, Type ACDelete the
- Page 115 and 116:
403.4 Quality AssuranceReplace para
- Page 117 and 118:
SECTION 407 ASPHALTIC CONCRETE PAVE
- Page 119 and 120:
407.2.3 Acceptance of Pavement Mixt
- Page 121 and 122:
407.2.5.2 Liquid Antistripping Agen
- Page 123 and 124:
407.4 Measurement(1) The department
- Page 125 and 126:
410.3.2 Salvaged Asphaltic Pavement
- Page 127 and 128:
415.2.2 ConcreteReplace paragraph t
- Page 129 and 130:
415.5.10 Curing of ConcreteReplace
- Page 131 and 132:
(4) The contractor shall not: heat
- Page 133 and 134:
415.5.15.2.4 Maturity Method(1) The
- Page 135 and 136:
(4) When verification tests indicat
- Page 137 and 138:
416.2.6 Concrete Pavement GapsRepla
- Page 139 and 140:
(6) The department may prohibit the
- Page 141 and 142:
501.4.3.3 General Use(1) For all co
- Page 143 and 144:
501.5.5 Fly ashDelete the entire te
- Page 145 and 146:
(2) The contractor shall protect al
- Page 147 and 148:
(3) On structures where the deck co
- Page 149 and 150:
505.2.6.2 Dowel Bars(1) Coat dowel
- Page 151 and 152:
508.5.3 Timber Piling, DeliveredRep
- Page 153 and 154:
512.4.2 Permanent Steel Sheet Pilin
- Page 155 and 156:
except as provided below; and for f
- Page 157 and 158:
PART VIINCIDENTAL CONSTRUCTION601.2
- Page 159 and 160:
completion of the work; and for all
- Page 161 and 162:
(23) Steel Plate Beam Guard, Energy
- Page 163 and 164:
(3) Concrete Median Sloped Nose con
- Page 165 and 166:
623.2.2 Calcium Chloride(1) Furnish
- Page 167 and 168:
628.2.5.1 Geotextile FabricReplace
- Page 169 and 170:
Add the following new subsection:62
- Page 171 and 172:
628.4.5 Silt Fence, DeliveredReplac
- Page 173 and 174:
Add the following new subsection:62
- Page 175 and 176:
631.5.1 SoddingReplace paragraph on
- Page 177 and 178:
(4) For contractor-designed bases,
- Page 179 and 180:
643.2.4 DrumsReplace the entire tex
- Page 181 and 182:
except as specified in the contract
- Page 183 and 184:
645.2.4 Geotextile Fabric, Type DF
- Page 185 and 186:
646.4.7 Locating No-Passing ZonesRe
- Page 187 and 188:
SCHEDULE OF BID ITEMS ADDED AND RET
- Page 189 and 190:
65099 Construction Staking, Initial
- Page 191 and 192:
65010 Construction Staking, Subgrad
- Page 193 and 194:
62003 Concrete Median Sloped Nose m
- Page 195 and 196:
BID ITEMS RETIRED - SI METRIC (EAS
- Page 197:
ERRATA SHEETConversion Table (page