11.07.2015 Views

Part B Standard Contract Specifications 2012 - City of Guelph

Part B Standard Contract Specifications 2012 - City of Guelph

Part B Standard Contract Specifications 2012 - City of Guelph

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Guelph</strong> SS-300 February <strong>2012</strong>SPECIFICATIONS FOR TRAFFIC-RELATED ITEMSOPSS 615 – Construction Specification for Erection <strong>of</strong> Poles (Nov 2008)OPSS 616 – Construction Specification for Footings and Pads for Electrical Equipment(Nov 2008)OPSS 617 – Construction Specification for Installation <strong>of</strong> Roadway Luminaires(Nov 2011)OPSS 620 – Construction Specification for Traffic Signal Equipment and ElectricalTraffic Control Devices (Nov 2007)OPSS 624 – Construction Specification for Traffic Signal Interconnection Equipment(Nov 2007)List <strong>of</strong> TablesA – Traffic Signal Installation – Approved Material ListB – Traffic Signal Installation ChecklistC – Traffic Signal Activation PolicyD – <strong>Contract</strong>or Traffic Signal Service <strong>Standard</strong> & Response TimeE – <strong>Contract</strong>or’s Traffic Signal Equipment Return ChecklistField LayoutThe <strong>Contract</strong>or shall complete the installation <strong>of</strong> the traffic control signal as indicated onthe <strong>Contract</strong> Drawing(s). The exact location <strong>of</strong> the traffic control signal plant includingbut not limited to:• Pole base(s)• Handwell(s)• Traffic signal controller cabinet(s)• Convenience ramp(s)• Vehicle loop detector(s)• Pedestrian and vehicle signal head(s)• Pedestrian push button(s)• Handhole direction(s)must be approved by Operations & Transit Department – Traffic Signals staff prior toinstallation. Pole base layout will occur only when final grade, curb and sidewalklocations have been confirmed.Any deviation from the <strong>Contract</strong> Drawing(s) must receive written approval from <strong>City</strong> <strong>of</strong><strong>Guelph</strong> Operations & Transit Department - Traffic Signals staff prior to any workcommencing in the field.Any traffic signal equipment installed which does not conform to SS-300 Sections 1-15or SD 201-224 and SD 301-306 shall be replaced at full cost to the contractor.The <strong>Contract</strong>or shall keep one set <strong>of</strong> traffic signal plan drawings on site solely for recordkeeping purposes. The <strong>Contract</strong>or shall record any deviations on the drawings as the workis performed. Deviations shall include changes, additions and deletions to the trafficsignal plant. No additional payments will be made to the <strong>Contract</strong>or to provide thesedrawings.Requirement <strong>of</strong> Police Officer for Traffic ControlThe <strong>Contract</strong>or shall be required to provide continual, safe and legal operation <strong>of</strong> thetraffic signals. In the event a traffic signal is required to be temporarily de-activated orplaced into “flash” mode, the <strong>Contract</strong>or shall hire a <strong>City</strong> <strong>of</strong> <strong>Guelph</strong> police <strong>of</strong>ficer todirect traffic movements until the traffic signal is operating as desired. Traffic Signal staffPage 10 <strong>of</strong> 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!