11.07.2015 Views

Part B Standard Contract Specifications 2012 - City of Guelph

Part B Standard Contract Specifications 2012 - City of Guelph

Part B Standard Contract Specifications 2012 - City of Guelph

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> Of <strong>Guelph</strong> February, <strong>2012</strong>SPECIAL PROVISIONSBasis <strong>of</strong> PaymentPayment at the contract price for the tender item “Power Supply Assemblies” shall be fullcompensation <strong>of</strong> all labour, equipment, and materials to do the work.53. SECTIONAL STEEL POLES, BASE MOUNTEDScope <strong>of</strong> WorkWork under this item shall be in accordance with the Section 11 <strong>of</strong> the SS-300 <strong>City</strong> <strong>of</strong> <strong>Guelph</strong><strong>Part</strong> ‘B’ <strong>Standard</strong> <strong>Contract</strong> <strong>Specifications</strong>, OPSS 615 and as amended herein. This specialprovision covers the requirements for the installation <strong>of</strong> sectional steel poles supplied by the<strong>Contract</strong>or for the traffic signal system and roadway illumination, as identified and noted in thecontract drawings.ConstructionSectional steel poles shall be installed in accordance with procedures specified by themanufacturer and/or Engineer and as indicated in the contract drawings and specifications.Basis <strong>of</strong> PaymentPayment at the contract price for the tender item “Sectional Steel Poles Base Mounted” shall befull compensation <strong>of</strong> all labour, equipment, and materials do the work.54. CONCRETE FOUNDATIONSScope <strong>of</strong> WorkWork under this item shall be in accordance with the Section 12 <strong>of</strong> the SS-300 <strong>City</strong> <strong>of</strong> <strong>Guelph</strong><strong>Part</strong> ‘B’ <strong>Standard</strong> <strong>Contract</strong> <strong>Specifications</strong>, OPSS 616 and as amended herein. This specialprovision covers the requirements for the supply and installation <strong>of</strong> concrete foundations for thesectional steel poles and traffic signal controller cabinets including reinforcing steel bars asidentified in the contract drawings and specifications.ConstructionConcrete foundations shall be installed in accordance with procedures specified by themanufacturer and/or Engineer and as indicated in the contract drawings and specifications.Concrete Pole FoundationsThe location <strong>of</strong> the concrete foundations for the sectional steel poles and the traffic controllercabinet shall be approved in the field by <strong>City</strong> <strong>of</strong> <strong>Guelph</strong> Operations Department - Traffic Signalstaff prior to installation.The concrete pole foundations may be located adjacent to existing underground utilities. Noadditional compensation shall be made to the <strong>Contract</strong>or for excavating these areas where the polefoundation is adjacent to existing underground utilities by hand digging or Hydro Vac excavation.Anchorage AssemblyThe anchorage assembly studs shall be coated with white non-staining grease and inserted to fullPage 50 <strong>of</strong> 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!