11.07.2015 Views

NAMAGROEN EMPR Amendment.pdf - DLIST Benguela

NAMAGROEN EMPR Amendment.pdf - DLIST Benguela

NAMAGROEN EMPR Amendment.pdf - DLIST Benguela

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Addendum to <strong>EMPR</strong> for Concessions 8(a), 9(a) and 8(b) 58PROSPECTING AND DREDGING# ASPECT IMPACT DESCRIPTION MITIGATION MEASURES AND MANAGEMENT ACTIONS3.2 Presence of miningvessels3.3 Presence of miningvessels3.4 Presence of miningvesselsScheduling of dredgingoperationsExclusion zone arounddischarge pipelineVibration or noisedisturbance of marinemammals and seabirds,accidental loss of fish orlobsters, loss of habitat,food source andrecruitment areas,entanglement of marinemammals3.5 Refuelling Pollution of the sea bybunker fuel and/or gas oil3.6 Release of ballastwaterMarine pollution andintroduction of alienspecies‣ If feasible, schedule dredging operations to avoid potential conflict duringdredger discharge with the commercial rock lobster fishery operating in thearea between November and April.‣ Provide the rock lobster industry with maps indicating the exact location ofthe discharge pipelines and the extent of the exclusion zones.‣ Clearly mark any exclusion zones using light buoys and/or radar reflectors.‣ Maintain radio communication between the dredger and any lobster vessels inthe area whilst the dredger is in inshore waters.‣ Implement a Marine Life Sightings Programme (including turtles, jellyfish, rocklobsters and anything else of interest) from the contracted dredger, to recordthe presence, proximity to and behaviour patterns of marine mammals,particularly during operations.‣ To avoid disturbance of whales, vessels should not approach within 300 m of awhale whilst underway (particularly during dredging).‣ If a whale surfaces within this distance of the vessel when at anchor, or duringdischarging of dredged sediments, the vessel should remain stationary until thewhale has moved to a distance 300 m away.‣ Schedule dredging operations to avoid overlap with the presence of whales inthe area (June to November).‣ Undertake oil bunkering and refuelling of contracted dredger under controlledconditions in a harbour only.‣ In the event of an oil spill:- Follow the Shipboard Oil Spill Emergency Response Manual procedure.- Notify the Principle Officer of the nearest SAMSA office and the ChiefDirectorate of Pollution and Waste Management (DEAT) in Cape Town.‣ Ballast water may only be released when the vessel is more than 12 miles fromland and in water depths greater that 25 m.RESPONSIBLEPERSON/SNamagroen Prospecting & Investments October 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!