11.07.2015 Views

NAMAGROEN EMPR Amendment.pdf - DLIST Benguela

NAMAGROEN EMPR Amendment.pdf - DLIST Benguela

NAMAGROEN EMPR Amendment.pdf - DLIST Benguela

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Addendum to <strong>EMPR</strong> for Concessions 8(a), 9(a) and 8(b) 66ONSHORE LOGISTICAL SUPPORT AND GRAVEL PROCESSING# ASPECT IMPACT DESCRIPTION MITIGATION MEASURES AND MANAGEMENT ACTIONS5.3 Construction activities Concrete pollution ‣ Concrete must be transported onto site and no batching or mixing activities ofany kind should occur on site.‣ All visible remains of excess concrete and aggregate are to be physicallyremoved on completion of each plaster or concrete pour section, and disposedof accordingly.‣ Dumping or washing of concrete remains into the ground is not permitted.5.4 Stockpiling of marinegravels5.5 Vehicle andequipmentmaintenance5.6 Discard of recoverytailings from thetreatment plant5.7 Discharge of finetailings to the settlingpondDamage to terrestrialhabitats, changes in soilchemistry‣ Stockpile marine gravels only in specifically demarcated previously disturbedareas.‣ Ensure that the reclamation area is sufficiently bunded and that suitabledrainage is provided.Hydrocarbon pollution ‣ Restrict vehicle maintenance to the maintenance yard area, except inemergencies.‣ For equipment maintained in the field, oils and lubricants to be contained andcorrectly disposed of off-site.‣ Maintain all equipment to ensure that no oils, diesel, fuel or hydraulic fluidsare spilled.‣ Vehicles used for the activity should have a spill kit (peatsorb/drip trays)onboard in the event of a spill.Back-filling mined-out areas ‣ Discard headfeed tailings only in designated excavations.‣ Confine tailings stockpiles to mineral processing area.‣ Assess colonisation of back-filled pits by vegetation and other biota on aregular basis.Additional source of windblowndust, risks toanimals, contamination ofground water‣ Obtain the relevant permit for discharge of fine tailings on land from theDepartment of Water Affairs and Forestry (DWAF) and monitor compliance topermit conditions.‣ Keep records of discharge volumes and particle size composition.‣ Ensure settling pond area is safe to humans and wildlife.RESPONSIBLEPERSON/SNamagroen Prospecting & Investments October 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!