11.07.2015 Views

Bus Rapid Transit (BRT) Implementation Study for South ... - pctpa

Bus Rapid Transit (BRT) Implementation Study for South ... - pctpa

Bus Rapid Transit (BRT) Implementation Study for South ... - pctpa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Bus</strong> <strong>Rapid</strong> <strong>Transit</strong> (<strong>BRT</strong>) <strong>Implementation</strong> <strong>Study</strong> <strong>for</strong> south Placer CountySeptember 8, 2006‣ The uses planned <strong>for</strong> the following locations make them good candidate <strong>BRT</strong> station sites.• West Roseville Specific Plan Town Center• Placer Vineyards Center at Watt Avenue• Planned Corporate Center at SR 65/Blue Oaks Boulevard‣ The existing Taylor park-and-ride lots is a good candidate <strong>BRT</strong> station site, given its location(i.e., proximity to I-80) and its planned expansion.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!