11.07.2015 Views

Bus Rapid Transit (BRT) Implementation Study for South ... - pctpa

Bus Rapid Transit (BRT) Implementation Study for South ... - pctpa

Bus Rapid Transit (BRT) Implementation Study for South ... - pctpa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Bus</strong> <strong>Rapid</strong> <strong>Transit</strong> (<strong>BRT</strong>) <strong>Implementation</strong> <strong>Study</strong> <strong>for</strong> south Placer CountySeptember 8, 2006• Designation as a transit corridor in the Placer County General Plan• Eight-lane right-of-way allows <strong>for</strong> development of transit lanes• Central location of this east-west route in south Placer County‣ I-80 is a good corridor to provide <strong>BRT</strong> service to link the south Placer area to the I-80/Wattlight rail station or to downtown Sacramento, given the planned HOV lanes both in PlacerCounty and in Sacramento County.‣ SR 65 would be a good corridor to provide <strong>BRT</strong> service if HOV lanes are developed toprovide competitive travel times <strong>for</strong> transit between Lincoln and I-80.‣ Roseville Parkway is a good corridor to provide <strong>BRT</strong> service because it links several potential<strong>BRT</strong> station locations including the Galleria Mall area and the Taylor park-and-ride lot.As development proceeds, transit service can be phased in over time. Depending on the location, sequenceand level of development, interim transit service may include express bus service, “enhanced” bus service,fixed route service, and/or shuttle service. <strong>BRT</strong> would be feasible when and where a sufficient number ofstation areas are developed at the higher densities necessary to support a new <strong>BRT</strong> route.The following planning actions are recommended to facilitate the implementation of transit service in southPlacer County:• Designate <strong>BRT</strong> station locations in new Specific Plan areas and preserve sufficient right-ofway<strong>for</strong> access, bus pick-up/drop-off areas, and park-and-ride facilities.• Adopt Specific Plans that identify land use types and densities within ½ mile of future <strong>BRT</strong>stations that are supportive of future <strong>BRT</strong> service.• Designate segments of Blue Oaks Boulevard, Fiddyment Road, Watt Avenue, and SunsetBoulevard as potential future <strong>BRT</strong> corridors and preserve sufficient right-of-way to providetwo dedicated arterial/HOV transit lanes in the future.• Designate key intersections as potential future <strong>BRT</strong> bypass locations and preserve sufficientright-of-way to provide queue bypass lanes.• Adopt a funding mechanism <strong>for</strong> new developments that provide <strong>for</strong> capital as well asoperating & maintenance costs <strong>for</strong> future transit service.• Initiate coordinate ef<strong>for</strong>ts with affected jurisdictions and transit agencies to establishmanagement, operational, phasing, and funding plans <strong>for</strong> future transit service.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!