land lease agreement (lla) for 100-150 mw power project at ... - BPDB

land lease agreement (lla) for 100-150 mw power project at ... - BPDB

land lease agreement (lla) for 100-150 mw power project at ... - BPDB

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Land Lease Agreement(c)Additional Easements<strong>BPDB</strong> shall, upon request by the Company which shall not be made earlier than onehundred and twenty (120) Days after the Project Effective D<strong>at</strong>e, grant to the Companysuch additional easements and rights-of-way as may be necessary <strong>for</strong> purposesincidental to the construction and/or the oper<strong>at</strong>ions of the Facility, including but not limitedto drainage and construction of w<strong>at</strong>er out-take channels (to the extent not affecting theoper<strong>at</strong>ion of the second <strong>power</strong> plant to be constructed in <strong>at</strong> Kaliakoir Hitech Park,Gazipur complex).(d)No Additional Consider<strong>at</strong>ionConsider<strong>at</strong>ion <strong>for</strong> such rights (<strong>for</strong> both the Company and <strong>BPDB</strong> in this Section 3.9) shallbe the execution of this Lease Agreement and no other consider<strong>at</strong>ion shall be required.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!