11.07.2015 Views

land lease agreement (lla) for 100-150 mw power project at ... - BPDB

land lease agreement (lla) for 100-150 mw power project at ... - BPDB

land lease agreement (lla) for 100-150 mw power project at ... - BPDB

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Land Lease Agreement(iii)Radius of Curv<strong>at</strong>ure: The radius of curv<strong>at</strong>ure <strong>for</strong> the road shall be derived from thefollowing equ<strong>at</strong>ion :2VR =127×(c + f)Where :R = Radius of curv<strong>at</strong>ure (meters)V = Speed of vehicles (km/h), 70Km/hc = Cross-fall of road (meters per meter)f = Coefficient of side friction <strong>for</strong>ce developed between the vehicle tires androad pavementAccording to Overseas Road Note 6, c=0.03, f=0.15-0.33, when V=70Km/h, f=0.2.This gives R=167.75mHence R=200m is proposed3.2 Drainage Design <strong>for</strong> the RoadSince the pavement of the road will be designed to shed w<strong>at</strong>er completely, there is no need toprovide drainage <strong>for</strong> pavement. But drainage <strong>for</strong> the Access Road shall be installed to protect theAccess Road from erosion.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!