- Page 5 and 6: a) HRSG and Steam Turbine simultane
- Page 7 and 8: Peak Load, KJ/Kwh ------------Guara
- Page 9 and 10: Ambient Temp. 25 0 C, KW ----------
- Page 11 and 12: -Material of expansion joints -----
- Page 13 and 14: -Class of winding insulationArmatur
- Page 15 and 16: (1) at MCR- Maximum Continuous Rati
- Page 17 and 18: - Max. superheater steam temp., 0 C
- Page 19 and 20: Diameter of shell inside, mm ------
- Page 21 and 22: - Economiser tube -----------------
- Page 23 and 24: - Casing bursting diaphragm press,
- Page 25: - Material of construction for majo
- Page 28 and 29: - Absolute pressure at turbineexhau
- Page 30 and 31: values without change in priceHead,
- Page 32 and 33: 4.5 Deaerator- Weight of deaerator
- Page 34 and 35: -Efficiencyat pf 0.8, % -----------
- Page 36 and 37: Closing and latching capability, kA
- Page 38 and 39: Power factor at full load ---------
- Page 40 and 41: - Max. starting current as percenta
- Page 42 and 43: - Maximum design voltage, KV ------
- Page 44 and 45: - Length of each unit, mm ---------
- Page 46 and 47: -Type of windingsHigh tension windi
- Page 48 and 49: ONAN rating, % --------------------
- Page 50 and 51: 3 second short time rating, kA (rms
- Page 52 and 53:
attery racklength, mm -------------
- Page 54 and 55:
- Percent rise on voltage when full
- Page 56 and 57:
Resolution (horizontal x vertical),
- Page 58 and 59:
Laser Printer A4Manufacturer, count
- Page 60 and 61:
Control valves --------------------
- Page 62 and 63:
17.4 600 V Power Cable-Manufacturer
- Page 64 and 65:
f) Manufacturer -------------------
- Page 66 and 67:
Form ----------------------------Im
- Page 68 and 69:
) Allowable working load of a pile,
- Page 70 and 71:
With regard to project air emission
- Page 72 and 73:
Sl.No.Description of the main desig
- Page 74 and 75:
Sl.No.Description of the main desig
- Page 76 and 77:
Sl.No.Description of the main desig
- Page 78 and 79:
18. WASTE EFFLUENT NEUTRALISATIONFA
- Page 80 and 81:
21. WATER STEAM QUALITY SPECIFICATI
- Page 82 and 83:
Name of the items(Capacity - 250 an
- Page 84 and 85:
SCHEDULE-CDRAWINGS TO BE FURNISHED
- Page 86 and 87:
14. Drawing/diagram of Condenser ai
- Page 88 and 89:
SCHEDULE-DDELIVERY TIMETime from Da
- Page 90 and 91:
No. Description Q'tyForward/side vi
- Page 92 and 93:
W.1.1.10 Assembly, Compr. BearingSl
- Page 94 and 95:
Sl No.Item description Quantity Uni
- Page 96 and 97:
W.1.1.41 Piping Rack, Front, Piping
- Page 98 and 99:
W.1.1.54.6 Hexagon Nut 6 PCW.1.1.54
- Page 100 and 101:
W.1.4.13 Hydraulik Oil Package - Se
- Page 102 and 103:
Sl No.Item description Quantity Uni
- Page 104 and 105:
Minor Inspection Parts for 2 Years
- Page 106 and 107:
K.1.1.33.37 Disk 128 PCK.1.1.34 Ass
- Page 108 and 109:
Hot Gas Path Inspection ( HGPI) Spa
- Page 110 and 111:
Sl No. Item description Quantity Un
- Page 112 and 113:
Sl No. Item description Quantity Un
- Page 114 and 115:
Sl No. Item description Quantity Un
- Page 116 and 117:
M.1.1.27 Combustion Chamber, Pre-As
- Page 118 and 119:
Sl No. Item description Quantity Un
- Page 120 and 121:
Other Spares & ConsumablesNo.Item Q
- Page 122 and 123:
No.i) gasket, spiral woundii) boltI
- Page 124 and 125:
No.Item Quantity Unitprice(CIF)vi)
- Page 126 and 127:
SCHEDULE - GDEVIATIONS FROM SPECIFI
- Page 128 and 129:
5.6.7.-----------------------------
- Page 130 and 131:
SCHEDULE - JDESCRIPTION OF TRAINING
- Page 132:
SCHEDULE - LMETHOD OF TRANSPORTATIO