11.07.2015 Views

Tender Document for Construction of Ghorasal 300-450 MW ... - BPDB

Tender Document for Construction of Ghorasal 300-450 MW ... - BPDB

Tender Document for Construction of Ghorasal 300-450 MW ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

to 110 mmHg abs., min. ---------------------------------- Maintaining capacity at 110 mmHg abs.per pump, lit/hr ---------------------------------- Rated capacity, lit/hr ---------------------------------- operating weight, kg ---------------------------------- <strong>Construction</strong> & material <strong>of</strong> construction<strong>for</strong> major components, Ref. No. ---------------------------------- Specification <strong>of</strong> cooling water and sealwater requiredQuantity, lit/hr ---------------------------------Pressure, bar ---------------------------------- Complete description <strong>of</strong> operation includingper<strong>for</strong>mance curves <strong>of</strong> capacity vs suctionpressure, Ref. No. ---------------------------------- Quantity <strong>of</strong> free air handled , lit/hr ---------------------------------- Inlet air and vapour pressure at 0 0 C(mmHg abs.) ---------------------------------- Inlet air and vapour temp. 0 C ---------------------------------- Itemised list <strong>of</strong> all special wrenches and flaringtools required to maintain and service thefurnished the equipment, Ref. No. ---------------------------------(4) Steam jet air ejector- Manufacturer, country --------------------------------- Number <strong>of</strong> stages --------------------------------- Nozzle diameter, mm --------------------------------- Initial steam pressure, bar --------------------------------- Initial steam temperature, 0 C --------------------------------- Steam consumption, kg/hr --------------------------------- Maintaining capacity at 110 mmHg abs. --------------------------------- Complete description <strong>of</strong> operation includingper<strong>for</strong>mance curves <strong>of</strong> capacity vs suctionpressure, Ref. No. --------------------------------- Rated capacity (free air), lit/hr --------------------------------- Quantity <strong>of</strong> free air handled, lit/hr --------------------------------- Inlet air and vapour pressure at 0 C (mmHg abs.) ----------------------------- Inlet air and vapour temperature, 0 C --------------------------------<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2B <strong>of</strong> 2 ) 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!