-Efficiencyat pf 0.8, % ----------------------------------at pf 1.0, % -----------------------------------Stator overloading, % -----------------------------------Critical speed, rpm -----------------------------------Max. torque when the stator is short-circuited, Nm -----------------------------------Generator CharacteristicsInstantaneous Max. short-circuit currentat nominal voltage, A peak ----------------------------------sub-transient reactance, Xd” pu ----------------------------------transient reactance, Xd’ pu ----------------------------------synchronous reactance, Xd pu ----------------------------------negative sequence reactance, pu ----------------------------------zero sequence reactance, pu ----------------------------------field time Constant, Td’ 0 sec ----------------------------------Transient time Constant, Td sec ----------------------------------initial time Constant, Td” sec -----------------------------------Moment <strong>of</strong> inertia GD 2 <strong>of</strong> rotor, Kg-m 2 -----------------------------------percent rise on voltage when full load isrejected and operating at pf 0.8 , % ----------------------------------pf 1.0 , % -----------------------------------Telephone influence factorBalanced ----------------------------Residual -----------------------------Class <strong>of</strong> winding insulationArmature winding ---------------------------Field winding -----------------------------Type <strong>of</strong> cooling-Short circuit ratio, (sat.)-Generator rated excitation requirements <strong>for</strong>operation at rated kVAExcitation voltage, V -------------------------Excitation current, A -------------------------- Generator calculated losses at 100% Base ratingTotal generator iron loss, kW -------------------------Generator stator I 2 R loss, kW -------------------------Generator rotor I 2 R loss, kW -------------------------Generator stray load loss, kW -------------------------Generator windage loss, kW -------------------------Total generator loss, kW -------------------------- Generator cooling system -------------------------- Generator weights<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2B <strong>of</strong> 2 ) 34
5.2 Exciter (Brushless)Weight <strong>of</strong> rotor, kg -------------------------Weight <strong>of</strong> complete stator, kg -------------------------- Manufacturer, Country -------------------------- Type -------------------------- Rated output, kW --------------------------Rated load field voltage at0.80 pf/1.00 pf --------------------------Rated exciter current at0.80 pf./l.00 pf -------------------------- Exiter ceiling voltage, V --------------------------Maximum continuous excitercurrent, A --------------------------Excitation system voltageresponse ratio -------------------------5.3 Automatic Voltage Regulator-Manufacturer, Country -------------------------- Type -------------------------- Description <strong>of</strong> AVR, Ref. No. -------------------------5.4 Generator Protection (Manufacturer Cat. No. or Type)Relay Manufacturer -------------------------Generator differential relay --------------------------Generator ground over-current relay --------------------------Field / rotor ground detection system --------------------------Reverse power relay --------------------------Loss <strong>of</strong> field relay --------------------------Voltage restraint over-current relays --------------------------Negative phase sequence relay --------------------------Under/Over Frequency relay -------------------------- Synchro-Check Relay -------------------------- Auxiliary relays --------------------------Lockout relays -------------------------5.5 Generator Switchgear-Manufacturer, Country --------------------------Circuit breakerInterrupting Media SF 6Catalogue No. -------------------------Type -------------------------Closing current at 125 volts DC, A ---------------------Time to close, m sec -------------------------Tripping current at 125 volts DC, A -------------------------Time to trip, m sec -------------------------- Rating and capabilitiesCurrent rating, A -------------------------Voltage rating, V -------------------------Nominal 3 phase interrupting capacity, MVA -------------------------Maximum symmetrical interrupting capacity, kA -------------------------3 second short time rating, kA -------------------------<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2B <strong>of</strong> 2 ) 35
- Page 2: 1. Schedule PageSchedule-A Guarante
- Page 6 and 7: SCHEDULE-BTECHNICAL DATA SHEETB-1 G
- Page 8 and 9: Man-hours for :Minor inspectionNorm
- Page 10 and 11: -Dimension of unit, mm ------------
- Page 12 and 13: -Heaviest Piece during erection, 10
- Page 14 and 15: - Auxiliary relays ----------------
- Page 16 and 17: - Design pressure for high --------
- Page 18 and 19: Size of valve, mm -----------------
- Page 20 and 21: Shaft -----------------------------
- Page 22 and 23: - Number of exhaust ---------------
- Page 24 and 25: - Scheme for turbine drainage andau
- Page 27 and 28: oil tank interior, pedestals oil we
- Page 29 and 30: - Size of steam hood equalising lin
- Page 31 and 32: to 110 mmHg abs., min. ------------
- Page 33: - Tray, sizeNumber ----------------
- Page 37 and 38: Quantity of cooling water required,
- Page 39 and 40: Details of lining, Ref. No. -------
- Page 41 and 42: - Operating time, m sec. ----------
- Page 43 and 44: - Type -------------------------- R
- Page 45 and 46: - Standard specification to which t
- Page 47 and 48: Length, mm ------------------------
- Page 49 and 50: Total losses at maximum withONAN ra
- Page 51 and 52: B-13 DC Supply SystemAssociated tim
- Page 53 and 54: Starting system -------------------
- Page 55 and 56: -Control relays -------------------
- Page 57 and 58: Power failure protection for the pr
- Page 59 and 60: Manufacturer, country -------------
- Page 61 and 62: full load at 70 0 C cond. temp., A
- Page 63 and 64: - Weight per meter, kg ------------
- Page 65 and 66: -Safety apparatus -----------------
- Page 67 and 68: -Manufacturer, Country ------------
- Page 69 and 70: 1) Grades of Steel ----------------
- Page 71 and 72: B-23 Water Treatment Plant.The quan
- Page 73 and 74: Sl.No.Description of the main desig
- Page 75 and 76: 12. ION EXCHANGER UNITS : CATION UN
- Page 77 and 78: 16. CAUSTIC SODA STORAGE TANK andME
- Page 79 and 80: Sl.No.Description of the main desig
- Page 81 and 82: Name of items15. Centrifuging machi
- Page 83 and 84: Name of the items28. Pot. metabisul
- Page 85 and 86:
HRSG- Feed water correction plant-
- Page 87 and 88:
- Exhaust duct damper drawing- No l
- Page 89 and 90:
SCHEDULE - ETOOLS AND APPLIANCESThe
- Page 91 and 92:
SCHEDULE-FSpares & consumables duri
- Page 93 and 94:
W.1.1.32 Cable Arrangment, Comb. Ch
- Page 95 and 96:
W.1.1.38 Piping Rack, RightSl No.It
- Page 97 and 98:
W.1.1.47.1 Seal Ring 8 PCW.1.1.47.2
- Page 99 and 100:
W.1.4.6.1 Tmg-Gasket 2 PCPriceW.1.4
- Page 101 and 102:
Sl No.Item description Quantity Uni
- Page 103 and 104:
Sl No.Item description Quantity Uni
- Page 105 and 106:
Sl No.Item description Quantity Uni
- Page 107 and 108:
Sl No.Item description Quantity Uni
- Page 109 and 110:
Sl No. Item description Quantity Un
- Page 111 and 112:
Sl No. Item description Quantity Un
- Page 113 and 114:
Sl No. Item description Quantity Un
- Page 115 and 116:
Sl No. Item description Quantity Un
- Page 117 and 118:
M.1.1.34.3 Disk 20 PCM.1.1.56 Exhau
- Page 119 and 120:
Sl No. Item description Quantity Un
- Page 121 and 122:
No.i) O’ Ringii) O’ Ringiii) O
- Page 123 and 124:
No.Item Quantity Unitprice(CIF)B. I
- Page 125 and 126:
Spares & Service during Long Term S
- Page 127 and 128:
SCHEDULE - HCIVIL AND BUILDING WORK
- Page 129 and 130:
SCHEDULE - ILIST OF SUBCONTRACTORST
- Page 131 and 132:
SCHEDULE - KMOBILISATION AND DEMOBI