Power factor at full load ---------------------------Class <strong>of</strong> insulation ---------------------------Quantity <strong>of</strong> cooling water required, lit/hr ---------------------------Max. temperature rise, 0 C ---------------------------Enclosure ---------------------------Type <strong>of</strong> bearings ---------------------------Full load torque, kg-m ---------------------------Starting torque in percent <strong>of</strong> full load torque, % ---------------------------Max. torque in percent <strong>of</strong> full load torque, % ---------------------------- Overload capacity, % ---------------------------- Provision <strong>of</strong> anti-condensation heater ---------------------------- Provision <strong>of</strong> winding temperature indicators ---------------------------(3) Discharge Valve-Manufacturer, country ---------------------------- Type ---------------------------- Model No. ---------------------------- Bore, mm ---------------------------- Design pressure, bar --------------------------- Test pressure, bar --------------------------- Max. flow, lit/hr --------------------------- Normal flow, lit/hr --------------------------- Opening time, sec --------------------------- Closing time, sec --------------------------- Valve actuation --------------------------(4) Reversing Valve-Manufacturer, country --------------------------- Type --------------------------- Bore, mm --------------------------- Model No. -------------------------- Design pressure, bar --------------------------- Test pressure, bar --------------------------- Max. flow, lit/hr --------------------------- Normal flow, lit/hr --------------------------- Reversing time, sec --------------------------- Valve actuation --------------------------(5) Cathodic Protection Equipment-Manufacturer, country --------------------------- Type --------------------------- Model No.- Nominal supply voltage, v --------------------------- Nominal supply frequency, Hz --------------------------- Nominal supply phase --------------------------Number <strong>of</strong> anodes --------------------------Material <strong>of</strong> anodes --------------------------- Max. anode current, A --------------------------(6) Pipework- Manufacturer, country ---------------------------Bore, mm ---------------------------Material ---------------------------Design pressure, bar ---------------------------Test pressure, bar ---------------------------Wall thickness, mm ---------------------------<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2B <strong>of</strong> 2 ) 38
Details <strong>of</strong> lining, Ref. No. ---------------------------(7) Weight- Weight <strong>of</strong> pump & column pipe , kg ---------------------------Weight <strong>of</strong> pump complete, kg ---------------------------Weight <strong>of</strong> motor, kg ---------------------------Max. dynamic load on foundation, kg ---------------------------- Max. load on crane hook, kg ---------------------------(8) Materials- C W pump ---------------------------Suction <strong>of</strong> bellmouth ---------------------------Casing ball ---------------------------Diffuser ---------------------------Impellers ---------------------------Pump shaft ---------------------------Shaft sleeves ---------------------------Delivery bend ---------------------------Foundation ring ---------------------------Stuffing box packing -------------------------- Discharge pipework -------------------------- Venting pipework -------------------------6.3 Cooling Tower- Manufacturer, country -------------------------- Type -------------------------- Capacity, m 3 / hr -------------------------- Cooling surface area, m 2 -------------------------- Depression <strong>of</strong> Temp (at site condition), 0 C ------------------------- Inlet water temp. 0 C ------------------------- Outlet water temp. 0 C ------------------------- Air flow rate, m 3 / sec ------------------------- No. <strong>of</strong> Cell (including 25% additional cell) -------------------------- Cooling Tower Basin Capacity, m 3 -------------------------- Make up water requirement, m 3 / hr -------------------------6.4 Compressed Air Equipment(1) Air Compressor- Manufacturer, country -------------------------- Type -------------------------- Capacity, lit/hr -------------------------- Discharge pressure, bar -------------------------- Speed, rpm -------------------------- Efficiency at rated output, % -------------------------- Power required, kw -------------------------- Description <strong>of</strong> compressor (main components), Ref. No. -------------------------- Weight, kg -------------------------(2) Compressor Motor- Manufacturer, country -------------------------- Type -------------------------- Voltage, KV -------------------------- Speed at rated output, rpm -------------------------- Rating, KW -------------------------<strong>Ghorasal</strong> <strong>300</strong>-<strong>450</strong> <strong>MW</strong> CCPP Project (Vol-2B <strong>of</strong> 2 ) 39
- Page 2: 1. Schedule PageSchedule-A Guarante
- Page 6 and 7: SCHEDULE-BTECHNICAL DATA SHEETB-1 G
- Page 8 and 9: Man-hours for :Minor inspectionNorm
- Page 10 and 11: -Dimension of unit, mm ------------
- Page 12 and 13: -Heaviest Piece during erection, 10
- Page 14 and 15: - Auxiliary relays ----------------
- Page 16 and 17: - Design pressure for high --------
- Page 18 and 19: Size of valve, mm -----------------
- Page 20 and 21: Shaft -----------------------------
- Page 22 and 23: - Number of exhaust ---------------
- Page 24 and 25: - Scheme for turbine drainage andau
- Page 27 and 28: oil tank interior, pedestals oil we
- Page 29 and 30: - Size of steam hood equalising lin
- Page 31 and 32: to 110 mmHg abs., min. ------------
- Page 33 and 34: - Tray, sizeNumber ----------------
- Page 35 and 36: 5.2 Exciter (Brushless)Weight of ro
- Page 37: Quantity of cooling water required,
- Page 41 and 42: - Operating time, m sec. ----------
- Page 43 and 44: - Type -------------------------- R
- Page 45 and 46: - Standard specification to which t
- Page 47 and 48: Length, mm ------------------------
- Page 49 and 50: Total losses at maximum withONAN ra
- Page 51 and 52: B-13 DC Supply SystemAssociated tim
- Page 53 and 54: Starting system -------------------
- Page 55 and 56: -Control relays -------------------
- Page 57 and 58: Power failure protection for the pr
- Page 59 and 60: Manufacturer, country -------------
- Page 61 and 62: full load at 70 0 C cond. temp., A
- Page 63 and 64: - Weight per meter, kg ------------
- Page 65 and 66: -Safety apparatus -----------------
- Page 67 and 68: -Manufacturer, Country ------------
- Page 69 and 70: 1) Grades of Steel ----------------
- Page 71 and 72: B-23 Water Treatment Plant.The quan
- Page 73 and 74: Sl.No.Description of the main desig
- Page 75 and 76: 12. ION EXCHANGER UNITS : CATION UN
- Page 77 and 78: 16. CAUSTIC SODA STORAGE TANK andME
- Page 79 and 80: Sl.No.Description of the main desig
- Page 81 and 82: Name of items15. Centrifuging machi
- Page 83 and 84: Name of the items28. Pot. metabisul
- Page 85 and 86: HRSG- Feed water correction plant-
- Page 87 and 88: - Exhaust duct damper drawing- No l
- Page 89 and 90:
SCHEDULE - ETOOLS AND APPLIANCESThe
- Page 91 and 92:
SCHEDULE-FSpares & consumables duri
- Page 93 and 94:
W.1.1.32 Cable Arrangment, Comb. Ch
- Page 95 and 96:
W.1.1.38 Piping Rack, RightSl No.It
- Page 97 and 98:
W.1.1.47.1 Seal Ring 8 PCW.1.1.47.2
- Page 99 and 100:
W.1.4.6.1 Tmg-Gasket 2 PCPriceW.1.4
- Page 101 and 102:
Sl No.Item description Quantity Uni
- Page 103 and 104:
Sl No.Item description Quantity Uni
- Page 105 and 106:
Sl No.Item description Quantity Uni
- Page 107 and 108:
Sl No.Item description Quantity Uni
- Page 109 and 110:
Sl No. Item description Quantity Un
- Page 111 and 112:
Sl No. Item description Quantity Un
- Page 113 and 114:
Sl No. Item description Quantity Un
- Page 115 and 116:
Sl No. Item description Quantity Un
- Page 117 and 118:
M.1.1.34.3 Disk 20 PCM.1.1.56 Exhau
- Page 119 and 120:
Sl No. Item description Quantity Un
- Page 121 and 122:
No.i) O’ Ringii) O’ Ringiii) O
- Page 123 and 124:
No.Item Quantity Unitprice(CIF)B. I
- Page 125 and 126:
Spares & Service during Long Term S
- Page 127 and 128:
SCHEDULE - HCIVIL AND BUILDING WORK
- Page 129 and 130:
SCHEDULE - ILIST OF SUBCONTRACTORST
- Page 131 and 132:
SCHEDULE - KMOBILISATION AND DEMOBI