11.07.2015 Views

2013 FSEMC Program - Aviation Committees - AEEC - AMC

2013 FSEMC Program - Aviation Committees - AEEC - AMC

2013 FSEMC Program - Aviation Committees - AEEC - AMC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUPPORT INFRASTRUCTUREReference 13-105/FSG-193 – Page 27******12-057******ItemNo.SubsystemNameComponentPart No.(Sim Mfr & Vendor)Sim Mfr/ VendorNameYear ofMfrAircraftTypeFromUserBDS Computer IBM IntelliStation Z CAE 2003 A330 EVAPro and ATI 9800 VGACARD MD-11B747B777The Brief/Debrief (BDS) system frozen and model empty display all the time. Is there any way to fix this problem?Other Operator and CAE comments, please.Value of Resolution: Improve PerformanceItemNo.Subsystem NameComponentPart No.(Sim Mfr &Vendor)Sim Mfr/ VendorNameYear ofMfrAircraftTypeFromUser45 NetworkAdministrationR7 L3 2010 A320 AirbusL3-com maintenance/service network on simulator:L3-com is using perfectly functional protocols on LAN within one plant, but which appear very difficult to setup anduse with geographically distributed simulators. File system sharing over network, trust domains, etc. as used on LANappear not efficient and more than difficult to use over private company WAN. In our case, the company network ispresent between some identical simulators and our main central development station. All this in two training centersdistributed over two continents on two independent LANs linked with private company WAN. The “link” cannot beeasily established due to WAN routers, security constraints, etc. as we have no way to adjust those WAN settingswhich are tightly controlled by IT department and by the company security department. The company policy alsoexcludes the use of external data link, modem, etc. We are not able to properly maintain identical softwareconfiguration except by performing all patches manually on each simulators group and maintaining two separate andidentical configuration management databases.• Do other companies have the same problem?• Does L3 have projects to improve remote synchronization function of the simulators?Other user and L3 comments, please.Value of Resolution: Improve Performance, Reduce Workload (Maintenance or Operation), Reduce Costs(Acquisition or Operation)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!