11.07.2015 Views

Building Permit By-law - Niagara Falls, Ontario, Canada

Building Permit By-law - Niagara Falls, Ontario, Canada

Building Permit By-law - Niagara Falls, Ontario, Canada

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- 7 -1.6 MISCELLANEOUS WORKS AND PLUMBING1.6.1 Unless otherwise specified below, two (2) sets or copies of all requiredinformation determined by the Chief <strong>Building</strong> Official on a case by case basisshall be submitted as part of a complete permit application submission for thefollowing miscellaneous works:(1) Underpinning;(2) Stages (three sets);(3) Demising wall / party wall Installation;(4) Fireplace / wood stove;(5) Commercial kitchen hood & fire suppression system (three sets);(6) Fire alarm system upgrades / installations; and(7) Sprinkler and / or standpipe system upgrades / installations.1.6.2 Unless otherwise specified below, two (2) sets or copies of all requiredinformation determined by the Chief <strong>Building</strong> Official on a case by case basisshall be submitted as part of a complete permit application submission for thefollowing plumbing installation and / or modification projects:(1) Additions to an existing plumbing system;(2) Backflow preventer installation;(3) Back water valve installation (no drawings required);(4) Sump pit installation (no drawings required); and(5) Grease / oil interceptor installation;SECTION 2DRAWING REQUIREMENTS2.1 SITE PLANS2.1.1 Unless otherwise specified by the Chief <strong>Building</strong> Official where a site plan isrequired it shall consist of:(1) Survey property boundaries and dimensions, all building lines, bearing ofmetes and bounds and compass orientation (legal description);

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!