11.07.2015 Views

3 TON - 6 TON CPC/CPH SERIES - Goodman

3 TON - 6 TON CPC/CPH SERIES - Goodman

3 TON - 6 TON CPC/CPH SERIES - Goodman

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROTRUSIONInspect curb to ensure that none of the utility services (electric)routed through the curb protrude above the curb.CAUTIONIF PROTRUSIONS EXIST, DO NO ATTEMPT TO SET UNIT ON CURB.ROOF TOP DUCT CONNECTIONSInstall all duct connections on the unit before placing the uniton rooftop.HORIZONTAL DISCHARGEFor horizontal discharge, remove the supply and return ductcovers and place them over the vertical discharge return andsupply openings. Install with insulation facing up, using thelonger screws provided in the literature package.Ensure that the top of the duct connection frame is flush withthe top of the roof curb.Flexible duct connectors between the unit and ducts are recommended.Insulate and weatherproof all external ductworkand joints as required and in accordance with local codes.12”6 3/16”17” 7 3/8”SUPPLYREMOVECOVERS11” 4 7/8””RETURNHORIZONTAL DISCHARGE DUCT CONNECTIONS25”RIGGING DETAILSWARNINGTO PREVENT PROPERTY DAMAGE, THE UNIT SHOULD REMAIN IN AN UPRIGHTPOSITION DURING ALL RIGGING AND MOVING OPERATIONS. TO FACILITATELIFTING AND MOVING WHEN A CRANE IS USED, PLACE THE UNIT IN ANADEQUATE CABLE SLING.CAUTIONIF UNITS ARE LIFTED TWO AT A TIME, THE FORK HOLES ON THECONDENSER END OF THE UNIT MUST NOT BE USED. MINIMUM FORKLENGTH IS 42” TO PREVENT DAMAGE TO THE UNIT; HOWEVER, 48”IS RECOMMENDED.Provisions for forks have been included in the unit base frame.No other fork locations are approved.WARNINGTO PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE, PERSONALINJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE OBSERVEDWHEN INSTALLING THE UNIT.• Unit must be lifted by the four lifting holes located atthe base frame corners.• Lifting cables should be attached to the unit withshackles.• The distance between the crane hook and the top ofthe unit must not be less than 60”.• Two spreader bars must span over the unit to preventdamage to the cabinet by the lift cables. Spreaderbars must be of sufficient length so that cables do notcome in contact with the unit during transport.Remove wood struts mounted beneath unit baseframe before setting unit on roof curb. These strutsare intended to protect unit base frame from fork liftdamage. Removal is accomplished by extracting thesheet metal retainers and pulling the struts throughthe base of the unit. Refer to rigging label on the unit.Important: If using bottom discharge with roof curb, ductworkshould be attached to the curb prior to installing theunit. Ductwork dimensions are shown in Roof Curb InstallationInstructions.Refer to the Roof Curb Installation Instructions for proper curbinstallation. Curbing must be installed in compliance with theNational Roofing Contractors Association Manual.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!