11.07.2015 Views

1998 SSZ Operators MANUAL - Scag Power Equipment

1998 SSZ Operators MANUAL - Scag Power Equipment

1998 SSZ Operators MANUAL - Scag Power Equipment

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ADJUSTMENTS - CONT’DStraight Line Running Adj. - Cont'd4. Adjust position of turnbuckle by moving it inmounting slot either forward to slow left wheel orbackward to speed up left wheel. If unit pulls to theright, left wheel is too fast. If unit pulls to the left,left wheel is too slow.5. Tighten nut to secure turnbuckle.6. Readjust neutral if necessary. (See Figure 2)Cutter Deck Drive Belts3. To adjust RH blade drive belt: Adjust RH belttension so belt moves 1/2" with 10 pounds pressure.Adjust tension by tightening or loosening J-bolt.(See Figure 6 for SMZ-52; See Figure 7 forSMZ-61 & SMZ-48)4. Carefully unlatch foot plate support rod and lowerfoot plate.WASHERDrive NUT Belt Replacement"J" BOLTCAUTION:Stop engine and remove key from ignition beforemaking any adjustments. Wait for all movingparts to come to a complete stop beforebeginning work.BELTFigure 6 - SMZ-52SC205G1. Lift foot plate and secure with foot plate supportrod.2. To adjust cutter deck drive belt: Adjust until end ofspring aligns with end of L-shaped bracket. (SeeFigure 5)WASHERBELTNUT"J" BOLTBELTNUT"J" BOLTSC206GFigure 7 - SMZ-61 & SMZ-48WASHEREND OF L- SHAPEDBRACKETFigure 5SC204GNOTE: Due to initial belt stretching, check thisadjustment after the first 2 hour, 4 hour, and 8 hourintervals.5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!