11.07.2015 Views

Appendix F - Public Consultation Documentations - Utilities Kingston

Appendix F - Public Consultation Documentations - Utilities Kingston

Appendix F - Public Consultation Documentations - Utilities Kingston

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Public</strong> Information Centre No. 1 Summary• The objective of this Class EA is to develop a strategy forimprovements at the Cataraqui Bay WWTP. The nature of theseimprovements is to be economically sustainable,environmentally sound, and reflective of the short and long-termneeds and growth potential of the area.• The <strong>Public</strong> Information Centre No. 1 was held on July 12, 2012.Information presented included:• City of <strong>Kingston</strong> Sewage Infrastructure Master Plan• Archaeological, Ecological, Geotechnical, and PlanningAssessments• Facility Condition Assessment• Tech Memo No. 1 - Influent Characteristics• Tech Memo No. 2 - Assimilative Capacity Assessment• Tech Memo No. 3 - Facility Capacity Assessment• Tech Memo No. 4 - Preferred Liquid Train Alternative –Convert Existing Conventional Activated Sludge Process toBiological Aerated Filters (BAF)• Tech Memo No. 5 - Preferred Solids Train Alternative –Anaerobic Digestion with a Side Stream Process and NewBiosolids Cake Storage Facility

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!