11.07.2015 Views

Appendix F - Public Consultation Documentations - Utilities Kingston

Appendix F - Public Consultation Documentations - Utilities Kingston

Appendix F - Public Consultation Documentations - Utilities Kingston

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technical Memorandum No.8Long Term Constraint Mapping• This Technical Memorandum evaluated the footprint of variousliquid train technologies to provide a comparison of the ultimatetreatment capacity of the existing site.• The study suggested that CAS has the largest spacerequirements, and the existing site may not be sufficient for theplant’s next expansion.• For BAF, MBBR, and IFAS, the existing site is capable ofhousing the treatment infrastructure for the next expansion.• The recommendations generated from this TechnicalMemorandum were employed in the evaluation of the preferredliquid train alternative, in Technical Memorandum No. 4.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!