Potential Future Developments<br />
England and Wales<br />
1 – 4 GW<br />
0.5 – 2 GW<br />
0.5 – 2 GW<br />
TAN8<br />
R3 Offshore Wind<br />
Nuclear<br />
Interconnectors<br />
0.5 – 1 GW 0.5 – 1 GW<br />
5 – 15 GW<br />
� Further offshore wind<br />
leasing targeted to deliver<br />
25GW by 2020<br />
� Political will for nuclear<br />
replanting<br />
� EU directive for greater<br />
interconnection<br />
� Target of 30 – 40%<br />
generation from renewable<br />
(i.e. wind) sources could<br />
require a plant margin of 40<br />
– 60%*<br />
* Dependent on assumed contribution of wind to demand security at peak