System Access<br />

� ‘Outages’ are necessary to work on existing assets and to<br />

connect new assets<br />

� Outage planning and consenting timescales are used to<br />

determine connection date – now more likely to be outage<br />

system access.<br />

� Planning outages is a complex task: -<br />

� Planned outages can only be taken from March –<br />

October in any given year<br />

� Only limited outages can be taken at one time to<br />

ensure security of supply<br />

� Outage programme must account for maintenance and<br />

asset replacement activity (try to nest where possible)<br />

� For the worst case conductor systems, re-conductoring<br />

of existing circuits can be completed at a maximum<br />

rate of 3km per ‘line gang’/week.