South Wales Outages Required to Deliver Contracted Position<br />

by 2016<br />

G<br />

RWE<br />

PEMB<br />

2GW<br />

PEMB<br />

400kV<br />

BPAE<br />

Phase 2<br />

425MW<br />

KEY<br />

G<br />

PREN<br />

350MW<br />

Outages 2008-10<br />

Outages 2010-12<br />

Outages 2012-14<br />

Outages 2014-16<br />

G<br />

G<br />

BA<strong>GB</strong><br />

275kV<br />

BA<strong>GB</strong><br />

520MW<br />

Dashed represents line<br />

outages associated with turn-in<br />

to new substation assets<br />

BPAE<br />

Phase 1<br />

425MW<br />

G<br />

MAGA<br />

275kV<br />

PYLE<br />

275kV<br />

SWAN<br />

400kV<br />

SWAN<br />

275kV<br />

RHIG<br />

299MW<br />

ABTH<br />

275kV<br />

G<br />

G<br />

G<br />

ABTH<br />

1455MW<br />

RHIG<br />

400kV<br />

CARE<br />

275kV<br />

AES BARRY<br />

(EMBEDED) 230MW<br />

UPPB<br />

275kV<br />

SEVERN<br />

POWER USKM<br />

850MW 363MW<br />

TREM<br />

275kV<br />

G G<br />

USKM<br />

275kV<br />

CILF<br />

400kV<br />

WHSO<br />

275kV<br />

RASS<br />

400kV<br />

IMPP<br />

400kV<br />

IROA<br />

275kV<br />

WALH<br />

400kV<br />

SOUTH<br />

WALES<br />

SYSTEM<br />

BOUNDARY<br />

Wye Valley<br />

and River<br />

Crossing<br />

River<br />

Severn<br />

Crossings<br />

SEAB<br />

400kV<br />

G<br />

MELK<br />

400kV<br />

SEAB<br />

1200MW