Download Tender Document - High Commission of India, Colombo
Download Tender Document - High Commission of India, Colombo
Download Tender Document - High Commission of India, Colombo
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>of</strong> <strong>India</strong>, <strong>Colombo</strong>. However, such verifications would be completedwithin a period <strong>of</strong> 2 weeks after completion <strong>of</strong> the supply.12. After such physical/technical verifications <strong>of</strong> the supplies, paymentwould be released within a reasonable time.13. Part payment, if desired by bidder, could be made on supply <strong>of</strong> 50% <strong>of</strong>the supplies and after completing physical/technical verification asabove. No advance payment will be made.14. In case <strong>of</strong> non-supply <strong>of</strong> items ordered within the specified period, aliquidated damages @ 1% <strong>of</strong> the tender amount shall be levied for adelay <strong>of</strong> each calendar week subject to a maximum <strong>of</strong> 10%.Acceptance <strong>of</strong> this may be indicated in the financial bid.Training15. For each equipment installed, the supplier is required to train thedesignated technical staff to enable them to effectively operate thesystem.Delivery & Installation16. It is required to deliver the items in correct quantities as specified in theabove schedule and install them at the Faculty <strong>of</strong> Siddha Medicine,Trincomalee Campus, Eastern University, Sri Lanka within 90 days <strong>of</strong>the date <strong>of</strong> the award <strong>of</strong> the contract.17. The bids after evaluation in the <strong>High</strong> <strong>Commission</strong> will be sent to thecompetent authorities in the Government <strong>of</strong> <strong>India</strong> in New Delhi forapproval. Therefore, the bid should remain valid for acceptance up to90 days, without any price escalation.18. The <strong>High</strong> <strong>Commission</strong> reserves the right to reject all or any bids, ifnecessary without assigning any reasons. Bidders should havetechnical capability/competence to provide sets as per prescribedstandard/quality.Schedule <strong>of</strong> RequirementsChapter III19. All supplies should be <strong>of</strong> good quality and manufacture <strong>of</strong> goodrepute and be guaranteed for a period <strong>of</strong> minimum three years. Thesupplier should undertake to replace free <strong>of</strong> cost items withmanufacturing defects noticed during guarantee period, andbreakage in transit, if any.Chapter IV