11.07.2015 Views

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>of</strong> <strong>India</strong>, <strong>Colombo</strong>. However, such verifications would be completedwithin a period <strong>of</strong> 2 weeks after completion <strong>of</strong> the supply.12. After such physical/technical verifications <strong>of</strong> the supplies, paymentwould be released within a reasonable time.13. Part payment, if desired by bidder, could be made on supply <strong>of</strong> 50% <strong>of</strong>the supplies and after completing physical/technical verification asabove. No advance payment will be made.14. In case <strong>of</strong> non-supply <strong>of</strong> items ordered within the specified period, aliquidated damages @ 1% <strong>of</strong> the tender amount shall be levied for adelay <strong>of</strong> each calendar week subject to a maximum <strong>of</strong> 10%.Acceptance <strong>of</strong> this may be indicated in the financial bid.Training15. For each equipment installed, the supplier is required to train thedesignated technical staff to enable them to effectively operate thesystem.Delivery & Installation16. It is required to deliver the items in correct quantities as specified in theabove schedule and install them at the Faculty <strong>of</strong> Siddha Medicine,Trincomalee Campus, Eastern University, Sri Lanka within 90 days <strong>of</strong>the date <strong>of</strong> the award <strong>of</strong> the contract.17. The bids after evaluation in the <strong>High</strong> <strong>Commission</strong> will be sent to thecompetent authorities in the Government <strong>of</strong> <strong>India</strong> in New Delhi forapproval. Therefore, the bid should remain valid for acceptance up to90 days, without any price escalation.18. The <strong>High</strong> <strong>Commission</strong> reserves the right to reject all or any bids, ifnecessary without assigning any reasons. Bidders should havetechnical capability/competence to provide sets as per prescribedstandard/quality.Schedule <strong>of</strong> RequirementsChapter III19. All supplies should be <strong>of</strong> good quality and manufacture <strong>of</strong> goodrepute and be guaranteed for a period <strong>of</strong> minimum three years. Thesupplier should undertake to replace free <strong>of</strong> cost items withmanufacturing defects noticed during guarantee period, andbreakage in transit, if any.Chapter IV

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!