1. Date:<br />

Plan No. Project Ti<br />

ncyuelawcnL auu ouui,.c ue nayuetanon<br />

(Document Title, No., and Revision):<br />

QA Plan OHE-18, Rev. 0 , Section 8, page 1: "The chain-ofcustody<br />

of samples submitted for radionuclide and hazardous<br />

constituent analysis must be controlled in accordance with<br />

PNL-MA-567 procedure AD-4, Sediment Sample Chain of Custody."<br />

PNL-MA-567, AD-4, Rev. 0 ,page 2: "Deliver the samples to the<br />

analytical laboratory and transfer custody of the samples to<br />

authorized laboratory personnel."<br />

Reference Surveillance: N/A<br />

6. Description of Deficiency:<br />

The 40' and 60' special sediment samples to be analyzed for<br />

radionuclide and hazardous constituents from well 299-E25-38<br />

were delivered to US Testing without a chain-of-custody form<br />

on approximately June 12, 1989.<br />

Cause of Deficiency:<br />

2.Locati<br />

Miscommunication between sampling staff and personnel respons-<br />

ible for transferring special sediment samples to the I<br />

appropriate analytical laboratory. e<br />

These samples were not intended to go to US Testing for<br />

analysis. However, the personnel transferring the samples<br />

inadvertently included them in a group of samples transported<br />

there. The personnel neglected to bring the appropriate chai<br />

of-custody form.<br />

Deficiency Codes: 1-2 Cause Codes: P<br />

NCR Required? _J_ No Yes, NCR No.<br />

Originator's Signature: gS.W Date:t2 s<br />

PEFIC. tE1^0RT(DR) a DR No. DR-89-71 Page 1 1<br />

Evaluation and Corrective Action:<br />

a. Effect of Deficiency on Validity and Integrity of<br />

Project Results (Check One):<br />

__y( None Significant Effect<br />

Explain: Although C-of-C wasn't documented/maintained,<br />

actual physical control of samples by PNL staff was<br />

maintained at all times until delivery to the lab.<br />

Sample container seals were intact upon delivery.<br />

b. If Significant Effect, Location of Project Results<br />

Effected: N/A<br />

c. Corrective Action to Correct Deficiency:<br />

In this specific case, analytical results were for<br />

indication only and were not entered into the <strong>Hanford</strong><br />

Ground Water Database. Also, analytical results were<br />

not adversely impacted. Therefore, remedial<br />

corrective action is not deemed to be'necessary.<br />

d. Corrective Action to Preclude Recurrence:<br />

9. Cog M<br />

10. QE S<br />

11. Closeout/Corrective Action Complete: 3 Yes ^ No Signature<br />

Comments:<br />

This appears to be an isolated case caused by a<br />

miscommunication. Implementation of formal correct<br />

action measures are not felt to be necessary.<br />

Contact Sponsor: _ Yes ^ No<br />

If Yes:<br />

Contacted on by<br />

Name Date<br />

Required? %,I_ No _ Yes, No.<br />

Date<br />

Distribution: &SIFA-ii3, GV Last, MS Hanson, DR Dahl, PQD<br />