e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Session 9<br />

<strong>Lessons</strong> <strong>Learnt</strong> <strong>from</strong> <strong>Planning</strong> <strong>to</strong> <strong>Operation</strong><br />

<strong>Remote</strong> <strong>Rural</strong> Electrification: Project e7-1 e7<br />

Contents<br />

Claus-Jürgen Dauselt<br />

<strong>Rural</strong> Electrification Workshop<br />

February 23-25, 2005<br />

Bangkok<br />

• Project Chronology and Subprojects<br />

• Experience Project Cycle Project e7-1<br />

• Status and Conclusions: 4 Micro Hydro Subprojects<br />

• AIJ/CDM Experience<br />

• Recommendation in General<br />

1 Hybrid Subproject<br />

• Experience regarding Sustainability<br />

2 Solar Home Subprojects


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

E7-1 E7 1 Indonesia: Chronology<br />

During 1996 Feasibility Study<br />

Project Design and Concept<br />

Project Approval (LOI, MOU, PA)<br />

During 1997 Establish Project Office in NTT (EPO)<br />

Statistical Household Income Survey<br />

Reconstruction of SHS in NTT<br />

Assessment Candidate Sites<br />

During 1998 Final Site Selection<br />

Environmental Assessments<br />

Socioeconomic Assessments<br />

Manifold Technical Studies<br />

Tendering of Procurement<br />

During 1999 Construction of Facilities<br />

7 PLDs Established<br />

Financing Schemes Established<br />

During 2000 Commissioning and Handing Over<br />

Follow-up Commercial <strong>Operation</strong><br />

Conclusion of E7-1 Project (<strong>Lessons</strong> <strong>Learnt</strong>)<br />

2001-2003 Active Moni<strong>to</strong>ring of Project Performance<br />

Overview Construction<br />

MICRO HYDRO POWER SCHEMES<br />

• Waikelosawa (Sumba) 15 kW 1 user (PLN grid)<br />

• Bokin (SuSel) 13 kW 92 users<br />

• Palesan (SuSel) 69 kW 267 users<br />

• Ta‘Ba (SuSel) 50 kW 350 users<br />

Connecting 710 households<br />

HYBRID SCHEME<br />

• Solar Genera<strong>to</strong>r 22 kW<br />

• Wind turbine 10 kW<br />

• Back-up Diesel 20 kW<br />

• Battery Charging Station<br />

Connecting 127 households<br />

SOLAR HOME SCHEME (50 Wp each)<br />

• Oelnaineno 5 kW 101 users<br />

• Lengkonamut 4 kW 76 users<br />

• Kualeu 1 kW 18 users<br />

Connecting 195 households


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Lesson <strong>Learnt</strong> Project Cycle<br />

* Design/<strong>Planning</strong><br />

* Mobilization<br />

* Implementation<br />

* Post-Implementation<br />

Status MHP Bokin (13 kW)<br />

• Technical<br />

• Operating hours 17,248<br />

• kWh generated 38,070<br />

• kWh consumed n.d.<br />

• Availability 0.55<br />

– Financial<br />

– O&M account 4,108,000<br />

– Down payment 16,100,000<br />

– Outstandings n.d. (10,000,000 ass.)<br />

– Management<br />

– PLD still active (completely replaced)<br />

– Management <strong>to</strong>ols not used<br />

Status end 2003<br />

� Socioeconomic<br />

� Extension 5 users<br />

� Small business none<br />

� Tarifs structure unchanged<br />

(400/kWh; 5,000/0.5A)<br />

+/- Site Selection<br />

+ Detailed Field Assessments<br />

+/- Specifications (functional, detailed, IPC)<br />

+ Local Representation<br />

++ NGO Involvement<br />

+/- Common View on all Levels<br />

+/- Clear Interface with Contrac<strong>to</strong>rs<br />

+ Field Officer (FO) at Site<br />

+ Intensive, Tailored Training<br />

+ Intensive Review / Steering<br />

- Long Decision Process<br />

- Self Financing not Viable<br />

+ PLD Concept (bot<strong>to</strong>m-up) Viable<br />

+ Sustainable Electricity Services Viable<br />

+/- AIJ/CDM Viable but not Recomendable


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Status MHP Palesan (69 kW)<br />

• Technical<br />

• Operating hours 24,188<br />

• kWh generated 118,080<br />

• kWh consumed 85,557<br />

• Availability 0.77<br />

– Financial<br />

– O&M account 27,499,000<br />

– Down payment 46,725,000<br />

– Outstandings 9,636,000<br />

– Management<br />

– PLD still active (7 staff, 1 drop-out)<br />

– Management <strong>to</strong>ols are used<br />

Status end 2003<br />

• Technical<br />

� Socioeconomic<br />

� Extension 101 users<br />

� Small business 12 kiosk, carpenters,<br />

chicken breading, ice<br />

� Tarifs structure unchanged<br />

(300/kWh; 5,000/0.5A)<br />

Status MHP Ta‘Ba Ta Ba (50 kW)<br />

• Operating hours 30,511<br />

• kWh generated 216,560<br />

• kWh consumed 110,652<br />

• Availability 0.97<br />

– Financial<br />

– O&M account 61,154,000<br />

– Down payment 61,250,000<br />

– Outstandings 7,800,000<br />

– Management<br />

– PLD still active (4 staff, 3 drop-out)<br />

– Management <strong>to</strong>ols are well used<br />

Status end 2003<br />

� Socioeconomic<br />

� Extension 82 users<br />

� Small business 9 kiosk, power rental,<br />

Wartel, carpenter<br />

� Tarifs structure changed<br />

(800/kWh; 7,500 flat)


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Conclusion MHP<br />

• Technical<br />

• Systems in operation (2 out of 3)<br />

• Replacements (routine & extraordinary)<br />

• Good/competent O&M (2 out of 3)<br />

• Grid extension (lack of quality)<br />

• Limited water resources (1 out of 3)<br />

– Financial<br />

– Missing transparency in cash flows<br />

– Missuse of revenues (2 out of 3)<br />

– Weak Fee collection enforcement (2 out of 3)<br />

– Management<br />

– Good PLD organization (2 out of 3)<br />

– PLD-User Service contracts signed (1 out of 3)<br />

– Noticable supervision by local Government<br />

• Technical<br />

� Socioeconomic<br />

� High user participation (varying)<br />

� Increase in productivity (2 out of 3)<br />

� High user awareness for PLD scheme benefits (2 out of 3)<br />

Status MHP Waikelosawa (15 kW)<br />

• Operating hours 6,481<br />

• kWh generated 12,171<br />

• kWh submitted 12,330<br />

• Availability 0.21<br />

– Latest Activities (12-2003)<br />

– Additional opera<strong>to</strong>r training<br />

– Procurement system components<br />

– Initiate power house enhancement<br />

– PSKSK re-negotiation (218 / 425 Irp./ kWh)<br />

– Management<br />

– KUD still active (3 staff, 3 drop-outs)<br />

– Management <strong>to</strong>ols are not used<br />

– Cooperation with PLN initiated (contract)<br />

Status end 2003


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Conclusion MHP Waikelosawa<br />

• Technical<br />

• System in operation<br />

• Routine Replacements<br />

• Permanent opera<strong>to</strong>r presence<br />

• Vandalism (building only)<br />

– Financial<br />

– No savings available<br />

– Low revenues through PSPSK<br />

– High KUD personnel cost<br />

– Management<br />

– MHP is integrated in<strong>to</strong> KUD activities<br />

– Unnoticable supervision by local Government<br />

Status HS OELEDO<br />

• Technical<br />

• Operating hours 26,710<br />

• kWh generated 60,480 (25 / 72 %)<br />

• kWh consumed 32,376<br />

• Availability 0.99<br />

– Financial<br />

– O&M account 38,494,677<br />

– Down payment 21,875,000<br />

– Outstandings 1,892,000<br />

– Management<br />

– PLD still active (3 staff, 4 drop-outs)<br />

– Management <strong>to</strong>ols are well used<br />

Status end 2003<br />

� Socioeconomic<br />

� Extension 7 users<br />

� Small business 9 kiosks, power rental,<br />

Wartel, fridge, carpenter<br />

� Tariff structure unchanged<br />

(800/kWh; 5,000/.5A)


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Conclusion HS OELEDO<br />

• Technical<br />

• System in operation<br />

• Routine Replacements<br />

• Good/competent O&M<br />

– Financial<br />

– Good transparency in cash flows<br />

– High and competent fee collection enforcement<br />

� Management<br />

� Competent PLD management (org.+planning)<br />

� 100% PLD-User Service contracts signed<br />

� Noticable supervision by local Government<br />

• Socioeconomic<br />

Status SHS Oelnaineno<br />

• Technical<br />

• High user participation (PLD meetings)<br />

• Increase in productivity (Small business)<br />

• High user awareness for PLD scheme benefits<br />

• Operating days 165,943<br />

• kWh generated<br />

• Availability 0.96 (5,297 hours outage)<br />

– Financial<br />

– O&M account 77,748,000<br />

– Down payment 17,500,000<br />

– Outstandings 65,519,000<br />

– Management<br />

– PLD still active (4 staff, two drop-outs)<br />

– Management <strong>to</strong>ols well used<br />

Status end 2003<br />

� Socioeconomic<br />

� Extension 15 taken systems (12 unused)<br />

� Small business 6 kiosks<br />

� Tariff structure unchanged<br />

(10,000/m; 320,000/y)


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Status SHS Lengkonamut<br />

• Technical<br />

• Operating days 111,397<br />

• kWh generated<br />

• Availability 0.97 (2,696 days outage)<br />

– Financial<br />

– O&M account 60,994,000<br />

– Down payment 13,125,000<br />

– Outstandings 50,360,000<br />

– Management<br />

– PLD still active (2 staff, four drop-outs)<br />

– Management <strong>to</strong>ols well used<br />

Status end 2003<br />

� Socioeconomic<br />

� Extension 7 taken systems (no unused)<br />

� Small business 7 kiosks, carpenter and study light<br />

� Tariff structure unchanged<br />

(10,000/m; 320,000/y)<br />

Conclusion SHS<br />

• Technical<br />

• Systems in operation<br />

• Routine Replacements<br />

• Good/competent O&M<br />

– Financial<br />

– Good transparency in cash flows<br />

– Missuse of revenues<br />

– Competent fee collection enforcement<br />

� Management<br />

� Competent PLD management (org.+planning)<br />

� 100% PLD-User Service contracts signed<br />

� Noticable supervision by local Government<br />

� Socioeconomic<br />

� High user participation (PLD meetings)<br />

� Increase in productivity (Small business)<br />

� High user awareness for PLD scheme benefits


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

CO2 Emissions Avoided<br />

Project<br />

Scenario<br />

AIJ concept<br />

Original<br />

AIJ concept<br />

14y<br />

Experience<br />

presently<br />

GENERAL<br />

CDM modalities<br />

Draft<br />

Medium term<br />

estimate<br />

Emissions Avoided<br />

(in t CO2)<br />

33,000<br />

15,000<br />

3,321<br />

4,735<br />

10,000<br />

Recommendation MHP/HS/SHS<br />

Comments<br />

Life : 30y MHP, 20 y HS,<br />

15 y SHS<br />

Life reduction <strong>to</strong> 14 y for<br />

all<br />

Due <strong>to</strong>: low consumption,<br />

feed-in + techn. Problems<br />

Low values of CDM<br />

modalities<br />

Feed-in+techn.problems<br />

solved<br />

Enhance Financial Management (transparency, misuse)<br />

Enhance capability for competent (grid) extension works<br />

Convince local governments <strong>to</strong> execute routine supervision /<br />

assistance function<br />

PARTICULAR<br />

Water management survey and enforcement (multiple use)<br />

Support for enhancing water ways<br />

Ensure opera<strong>to</strong>r presence at site<br />

Enhance preventive O&M (site close <strong>to</strong> sea)<br />

Enhance awareness for „electricity service“ scheme


e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

e7 / UNEP <strong>Rural</strong> Electrification Workshop Bangkok<br />

Experience Sustainability<br />

Aspect Indica<strong>to</strong>rs Bokin Palean Taba Waikelosawa Oeledo Lengkonamut Oelnaineno<br />

Technical<br />

Reliability<br />

Financial<br />

Justifyability<br />

Economic<br />

Viablility<br />

System Availability low middle high low high middle middle<br />

Cash Flow Scheme not sustainable not sustainable sustainable not sustainable sustainable sustainable sustainable<br />

Investment Recovery low probability low probability low probability low probability low probability low probability low probability<br />

Manageability PLD Organization low fair good low good good good<br />

Replicability Acceptance/Performance<br />

Stakeholders<br />

low fair high low high high high<br />

Outlook Continuity low low high low high high high<br />

Acknowledgement<br />

For more information: www.e7.org<br />

clausdauselt@web.de<br />

klaus.baumann@rwe.com<br />

Thank You<br />

Remark: Remark ASEAN Award 2002 in the NRSE project category(sub-project category(sub project hydro power)<br />

UNDP/ICC Award 2002 for Sustainable Development at Johannesburg Summit, SA<br />

ASEAN Award 2004 in the NRSE project category(sub-project<br />

category(sub project PV-wind PV wind-hybrid) hybrid)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!