11.07.2015 Views

Of for the safe erection and use of scaffolding

Of for the safe erection and use of scaffolding

Of for the safe erection and use of scaffolding

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.3 FRAME SCAFFOLDINGFrame <strong>scaffolding</strong> in this context means <strong>the</strong> portal-frame type <strong>scaffolding</strong>assembled on <strong>the</strong> site from prefabricated frames <strong>and</strong> members. Frames <strong>of</strong>different proprietary types must not be intermingled. Where frames are superimposedvertically, <strong>the</strong> connection must be such that:(a)The st<strong>and</strong>ards are held in linear alignment.(b) The panels are locked toge<strong>the</strong>r vertically by joint pin couplers or o<strong>the</strong>requivalent suitable means.Number <strong>of</strong> working plat<strong>for</strong>ms should be <strong>the</strong> same as st<strong>and</strong>ard tubular<strong>scaffolding</strong>. Longitudinal bracing depends on <strong>the</strong> <strong>use</strong> <strong>of</strong> ledgers:(a)Without ledgers, both faces <strong>of</strong> <strong>the</strong> scaffold in each lift <strong>of</strong> each bay areto be cross-braced.(b) With ledgers, brace ei<strong>the</strong>r with diagonal tubes as <strong>for</strong> tubular<strong>scaffolding</strong>, or cross-braced every bay <strong>for</strong> <strong>the</strong> first 12 m height <strong>of</strong>scaffold, reducing to one bay in two <strong>for</strong> <strong>the</strong> next 12 m height up, <strong>and</strong>one bay in four <strong>for</strong> <strong>the</strong> top 9 m <strong>of</strong> height (see fig. 16).Guardrails <strong>and</strong> midrails must be provided at working plat<strong>for</strong>m levels whencross braces are removed.6.4 UNIT-ASSEMBLED SCAFFOLDINGUnit assembled <strong>scaffolding</strong> means <strong>scaffolding</strong> assembled from prefabricatedframes or members which are not single lift portal-frame type units. Thespecific requirements are:(a)(b)(c)(d)(e)Erection must be carried out in accordance with <strong>the</strong> supplier’sinstructions <strong>and</strong> meet <strong>the</strong> requirements <strong>of</strong> this code.Spacing <strong>of</strong> unit frames will, in general, be less than <strong>for</strong> tube <strong>and</strong> frame<strong>scaffolding</strong> unless ledgers are <strong>use</strong>d.Bracing will be <strong>the</strong> same as <strong>for</strong> <strong>the</strong> <strong>scaffolding</strong>.Beca<strong>use</strong> <strong>of</strong> <strong>the</strong> lack <strong>of</strong> continuity in st<strong>and</strong>ards <strong>and</strong> <strong>of</strong> <strong>the</strong> lesser rigidityin <strong>the</strong> transverse corner joints, special attention must be given toprovide an adequate number <strong>of</strong> ties to prevent lateral movement.Scaffold constructed from light-weight aluminium tube (less than 2 mmwall thickness) shall not exceed 9 m in height unless subject to specialdesign.6.5 BRACKETS6.5.1 PREFABRICATED SCAFFOLD BRACKETSPrefabricated scaffold brackets which are attached to a structure to providesupport <strong>for</strong> a working plat<strong>for</strong>m must:(a)Have adequate <strong>and</strong> suitable means <strong>of</strong> attachment to provide verticalsupport <strong>and</strong> to resist accidental sideways movement.SAFE ERECTION AND USE OF SCAFFOLDING 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!