11.07.2015 Views

Of for the safe erection and use of scaffolding

Of for the safe erection and use of scaffolding

Of for the safe erection and use of scaffolding

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

oth, <strong>for</strong> securing vertical members toge<strong>the</strong>r laterally. Horizontal, diagonal orcross-bracing must be provided immediately above <strong>the</strong> wheels or castors (seefig. 18).Castors should be <strong>of</strong> <strong>the</strong> swivel type <strong>and</strong> have a minimum wheel diameter <strong>of</strong>125 mm. Wheels or castors must be fixed to scaffold uprights, or be socketedinto <strong>the</strong> scaffold uprights, a minimum length <strong>of</strong> 150 mm, to avoid becomingdislodged during movement on uneven floors.BaseHorizontal diagonal bracesas near bottom as possible(a) Mobile frame(a) Mobile tubeHorizontal diagonal bracesas near bottom as possibleFig. 18 Free-st<strong>and</strong>ing mobile scaffolds.When <strong>the</strong> scaffold is in <strong>use</strong>, <strong>the</strong> wheels or castors must be effectively locked<strong>and</strong> should be turned outwards to increase base width.A mobile scaffold must be <strong>use</strong>d only on a firm level surface. Where <strong>the</strong> surfacehas a slight cross-fall, <strong>the</strong> level <strong>of</strong> <strong>the</strong> wheels must be adjusted to bring <strong>the</strong>scaffold back to plumb. Mobile scaffolds should not be <strong>use</strong>d closer than 1 m toany slab edge or partition unless <strong>the</strong> edge is protected to prevent <strong>the</strong> wheels<strong>and</strong> scaffold from falling.Access between working plat<strong>for</strong>m <strong>and</strong> base must be provided by means <strong>of</strong>securely fixed ladders or purpose-built rungs. Cross braces must not be <strong>use</strong>das a means <strong>of</strong> access. Work plat<strong>for</strong>ms must be fully decked <strong>and</strong> be providedwith guardrails <strong>and</strong> toeboards in accordance with general requirements <strong>for</strong><strong>scaffolding</strong>.52 SAFE ERECTION AND USE OF SCAFFOLDING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!