Road Master Plan 2007-2027

Road Master Plan 2007-2027

Road Master Plan 2007-2027

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex-2P-2 of 20ROAD SECTOR MASTER PLAN (<strong>2007</strong>-<strong>2027</strong>)FEEDER ROADSFeeder <strong>Road</strong>s Cost HH Cost per PriorityDzongkhag From To Length(km) (Nu.) Million Served HH Rating(Nu.) Milion (A, B, C, D)CHHUKHA Meritsemo Bongo 17.5 91.175 161 0.6 BBongo Getana 42.5 221.425 255 0.9 BDoyagaon Lokchina 18.5 96.385 115 0.8 B(existingsuspension bridge)Lokchina Dungna 20.0 104.200 124 0.8 BDungna Metakha 7.0 36.470 65 0.6 BLokchina Chimuna 18.0 93.780 98 1.0 CChimuna Malbasey 20.0 104.200 134 0.8 BTotal 143.5 747.635 95211