Annex-2P-17 of 20ROAD SECTOR MASTER PLAN (<strong>2007</strong>-<strong>2027</strong>)FEEDER ROADSFeeder <strong>Road</strong>s Cost HH Cost per PriorityDzongkhag From To Length(km) (Nu.) Million Served HH Rating(Nu.) Milion (A, B, C, D)TRONGSA Kakeling Sinphu 12.0 62.520 57 1.1 CSinphu Bemji 10.0 52.100 63 0.8 BBemji Thrisipang 6.0 31.260 14 2.2 DTrongsa Jongthang 27.5 143.275 55 2.6 DRefe Kela 7.5 39.075 40 1.0 CNimshong Phumzor 18.0 93.780 13 7.2 DBerte Korphu 30.0 156.300 79 2.0 DKorphu Nabji 5.0 26.050 53 0.5 AKorphu Reti 15.0 78.150 130 0.6 BTotal 131.0 682.510 50426