11.07.2015 Views

Road Master Plan 2007-2027

Road Master Plan 2007-2027

Road Master Plan 2007-2027

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Annex-2P-6 of 20ROAD SECTOR MASTER PLAN (<strong>2007</strong>-<strong>2027</strong>)FEEDER ROADSFeeder <strong>Road</strong>s Cost HH Cost per PriorityDzongkhag From To Length(km) (Nu.) Million Served HH Rating(Nu.) Milion (A, B, C, D)LHUENTSE Autsho Gumbrang 19.0 98.990 411 0.2 AAutsho Yumchey 18.5 96.385 170 0.6 BGorgan Ungar 20.0 104.200 184 0.6 BKhoma Bridge Tsikang 30.0 156.300 117 1.3 CKhoma Gangla Khema 21.0 109.410 156 0.7 BThrima (Rotpa) Shawa 10.0 52.100 54 1.0 CLingabee Ney 10.0 52.100 89 0.6 BTotal 128.5 669.485 118115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!