11.07.2015 Views

Quarter 2 - Massachusetts Water Resources Authority

Quarter 2 - Massachusetts Water Resources Authority

Quarter 2 - Massachusetts Water Resources Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Water</strong> Distribution System Valves2nd <strong>Quarter</strong> - FY 13BackgroundValves are exercised, rehabilitated, or replaced in order to improve their operating condition. This work occurs year round. Valve replacementsoccur in roadway locations during the normal construction season, and in off-road locations during the winter season. Valve exercising canoccur year round but is often displaced during the construction season. This is due to the fact that a large number of construction contractsinvolving rehabilitation, replacement, or new installation of water lines, requires valve staff to operate valves and assist with disinfection,dechlorination, pressure-testing, and final acceptance. Valve exercising can also be impacted due to limited redundancy in the water system;valve exercising cannot be performed in areas where there is only one source of water to the community meters or flow disruptions will occur.Operable PercentageType of Valve Inventory # FY13 to Date FY13 TargetsMain Line Valves 2,092 97.5% 92%Blow-Off Valves 1,206 95.4% 94%Air Release Valves 1,335 93.5% 92%Control Valves 48 100.0% 95%Key to Symbols:FY2013 Monthly TotalFY2013Cumulative TotalFY2013Target# of valves1500125010007505002500Main Line Valves ExercisedFY13 Target = 1,100J A S O N D J F M A M JDuring Q2 of FY13, staff exercised only 189 main line valvesdue to water quality issues at Fells Covered Storage, drainingand cleaning of Blue Hills tank number 2, and contractor supportfor water main filling, valve testing and pressure testing of newvalves on the Hultman Aqueduct rehab project. The totalexercised for the fiscal year to date is 378.# of Valves35302520151050Main Line Valves ReplacedFY13 Target = 20J A S O N D J F M A M JDuring Q2 of FY13, six main line valves were replaced. Thetotal replaced for the fiscal year to date is six.# of Valves15105FY1 3Target = 10Blow-Off Valves Replaced# of Valves700600500400300200Blow-Off Valves ExercisedFY1 3Target = 5001000J A S O N D J F M A M J0J A S O N D J F M A M JDuring Q2 of FY13, staff replaced two blow off valves.total replaced for the fiscal year to date is nine.TheDuring Q2 of FY13, staff exercised 109 blow-off valves .The total exercised for the fiscal year to date is 202.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!