12.07.2015 Views

service letter - Cessna

service letter - Cessna

service letter - Cessna

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CaravanSERVICE LETTERCAL-53-03• The rivets that you install must be spaced in the same pattern as the other rivets installedthrough the stringer, and equally spaced from each other and from the rivets forward of themin the rows of rivets.C. Drill a No. 21 (0.159-inch diameter) hole at each position where you must install a rivet.D. Deburr and apply Alodine to bare metal.E. Install an MS20470AD5-4A-5 Rivet in each hole that you drilled.F. Install the tailcone panel 320A. (Refer to the Model 208 Maintenance Manual, Chapter 6, AccessPlates And Panels Identification - Description and Operation.)G. Do a touch up of the paint on the fuselage. (Refer to the Model 208 Maintenance Manual, Chapter20, Interior and Exterior Finish - Cleaning and Painting.)4. Remove the maintenance warning tags and connect the airplane battery.5. Make an entry in the airplane logbook that states compliance and method of compliance with this <strong>service</strong><strong>letter</strong>.CAL-53-03Page 2 January 15, 2013


CaravanSERVICE LETTERCAL-53-03Figure 1. Tailcone Stringer Inspection for Rivets (Sheet 1)CAL-53-03January 15, 2013 Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!