12.07.2015 Views

ATR 42/72 - 2013 - - Customer Online

ATR 42/72 - 2013 - - Customer Online

ATR 42/72 - 2013 - - Customer Online

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>THALES AVIONICS ELECTRICAL SYSTEMSTECHNICAL PUBLICATION<strong>ATR</strong> <strong>42</strong>/<strong>72</strong>- <strong>2013</strong> -THALES- CUSTOMER SUPPORT DEPARTMENT -41 boulevard de la République – B. P. n° 53 - 78401 CHATOU CEDEX - FRANCETel : 33 1 34.80.73.46 Fax : 33 1 34.80.75.95E-Mail : monique.maximin@fr.thalesgroup.com1


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>APPLICABLE TECHNICALPUBLICATION‣ 1. General conditions‣ 2. List of LRU’s‣ 3. Details of evolutions‣ 4. Statement of agreement2


1. GENERAL CONDITIONS<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>CMM : Component Maintenance Manual.TCMS : Technical Characteristics Maintenance Sheet.SB : Service BulletinSIL : Service Information LetterTechnical Publications (CMM/SB/SIL) are available. To obtain the sale conditions,contact your Commercial Contact.Prior to the delivery of a CMM, the customer shall sign a Statement of Agreement.2. LIST OF LRU’STHALESvendor codeTAES P/NDESCRIPTIONElectronic RotableQty perplaneApplicabilityF0296 156 Transformer E 2 All <strong>ATR</strong>F0296 102-003-11 DC Generator Control Unit E 2 All <strong>ATR</strong>F0296 103-003-2 (-11) Hall Effect Current Sensor (HECS) E 5 All <strong>ATR</strong>F0296105-003-2105-003-1DC Bus Power Control Unit E 1 All <strong>ATR</strong>F0296 20032-2 Alternator R 2 All <strong>ATR</strong>F0296 20732 Transformer (DPCT) E 3 All <strong>ATR</strong>F0296F02962432-112432-30559-012A 559-012B559-012C 559-012DAC Generator Control Unit E 2 All <strong>ATR</strong>Static Inverter E 2 All <strong>ATR</strong>F0296 680-0040-000 Emergency axe - 1 All <strong>ATR</strong>F0296F02968260-1238260-121945-12945-11DC Starter Generator R 2 All <strong>ATR</strong>AC Bus Power Control Unit E 1 All <strong>ATR</strong>F0296 F11NA3121 Transformer Rectifier Unit E 1F0296F0296F46BC0101F46BD0101F96GA0102F96GA0101F0296 B3893-000-500 andETOPS onlyControl Box E 1 All <strong>ATR</strong>Landing Gear Control Lever E 1 All <strong>ATR</strong>DC-STAR GSE - Direct CurrentSystem Tester Analyzer RecorderGround Support EquipmentE / All <strong>ATR</strong>3


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>3. DETAILS OF EVOLUTIONSSTARTER-GENERATOR P/N 8260-121CMM reference : 24-32-61Revision 10 : Date of update February, 09 th 2012Evolution Reason Application//Brush and bearingreplacementRecommendationto <strong>ATR</strong> operatorsin order to avoidabnormal MTBURMandatoryduring brushand bearingreplacementOperation,Maintenance,storage,transportation,handling.InProductionsinceSB/ // /SILSIL8260-120-005Rev.7dated 03/09/2009SIL8260-12X-24-007dated 04/1995/Recommendedscheduledmaintenance/ / /SIL8260-12X-24-009Rev. 3dated 06/04/2006/Brush checkprocedure withS/G fitted onengine./ / /SIL8260-12X-24-010Rev.1dated 09/09/2009/BrushreplacementprocedureMandatoryduring brushreplacement/ /SIL8260-12X-24-011Rev. 2dated 10/07/2009//Speed sensortighteningprocedure.Brush and bearingreplacementwithoutdisassembly ofthe S/G.During eachspeed sensorassemblingoperationMandatoryduring brushand bearingreplacement/ // /SIL8260-12X-24-012Rev 1dated 13/11/2009SIL8260-12X-24-013dated 05/06/2009/Packaging forStarter GeneratorRecommendedfor shipment/ /SIL8260-12X-24-014dated 09/07/2009/ArmatureinformationRecommended / /SIL8260-12X-24-015dated 09/11/2011/Checking of thetorque shaftRecommended / /SIL8260-12X-24-016dated 10/12/2012/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/20114


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason Application/Second source ofAnti-flash varnishInProductionsinceRecommended / /SBSILSIL24-99-003dated 05/09/2012AmendmentA, B & C/Do not exist forthis unit/ / /Amendment DImprovement ofreliabilityRecommendedunder repair1989SB8260-120-24-007dated 03/08/1992/Amendment EImprovement ofreliabilityDuring repair ifcomponent hasto be replaced &Recommendedduring overhaul.1990SB8260-120-24-006dated 10/12/1990/Amendment FImprovement ofreliabilityDuring repair ifcomponent hasto be replaced1991SB8260-120-24-005Rev. 1dated 12/04/1991/Amendment GImprovement ofreliabilityDuring repair ifcomponent hasto be replaced1994 / /Amendment HImprovement ofreliabilityDuring repair ifcomponent hasto be replaced1998SB8260-12X-24-008Rev. 1dated 21/12/1998/Amendment JImprovement ofreliabilityDuring repair ifcomponent hasto be replaced1998SB8260-12X-24-009Rev. 1dated 21/12/1998/Amendment KImprovement ofreliabilityDuring overhaul 1998SB8260-12X-24-010dated 28/10/1997/8260-123Improvement ofscheduledmaintenanceOn customerrequest2000SB8260-12X-24-011dated 21/12/1998/Amendment M ConformityMandatoryduring overhaul2000SB8260-12X-24-012Rev. 1dated 09/08/1999/Amendment NImprovement ofreliabilityDuring repair ifcomponent hasto be replaced2003SB8260-12X-24-013dated 17/12/2002//OverhaulprocedureMandatoryduring overhaul/SB8260-12X-24-014Rev. 1dated 07/04/2004/Amendment P ComponentobsolescenceDuring repair ifcomponent hasto be replacedOnlyunder repairsince 2006SB8260-12X-24-016dated 17/12/2004/Amendment RImprovement ofreliabilityDuring repair ifcomponent hasto be replaced2012SB8260-12X-24-017dated 12/11/20125


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>STARTER-GENERATOR P/N 8260-123CMM reference : 24-32-61Revision 10 : Date of update February, 09 th 2012Evolution Reason Application//Brush and bearingreplacementRecommendationto <strong>ATR</strong> operatorsin order to avoidabnormal MTBURMandatoryduring brushand bearingreplacementOperation,Maintenance,storage,transportation,handling.InProductionsinceSB/ // /SILSIL8260-120-005Rev.7dated 03/09/2009SIL8260-12X-24-007dated 04/1995/Recommendedscheduledmaintenance/ / /SIL8260-12X-24-009Rev. 3dated 06/04/2006/Brush checkprocedure withS/G fitted onengine./ / /SIL8260-12X-24-010Rev.1dated 09/09/2009/BrushreplacementprocedureMandatoryduring brushreplacement/ /SIL8260-12X-24-011Rev. 2dated 10/07/2009//Speed sensortighteningprocedure.Brush and bearingreplacementwithoutdisassembly ofthe S/G.During eachspeed sensorassemblingoperationMandatoryduring brushand bearingreplacement/ // /SIL8260-12X-24-012Rev 1dated 13/11/2009SIL8260-12X-24-013dated 05/06/2009/Packaging forStarter GeneratorRecommendedfor shipment/ /SIL8260-12X-24-014dated 09/07/2009/ArmatureinformationRecommended / /SIL8260-12X-24-015dated 09/11/2011/Checking of thetorque shaftRecommended / /SIL8260-12X-24-016dated 10/12/2012/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/2011/Second source ofAnti-flash varnishRecommended / /SIL24-99-003dated 05/09/20126


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason ApplicationAmendment AImprovement ofreliabilityDuring repair ifcomponent hasto be replacedInProductionsince2000SBSB8260-12X-24-008Rev. 1dated 21/12/1998SIL/Amendment BImprovement ofreliabilityDuring repair ifcomponent hasto be replaced2000SB8260-12X-24-009Rev. 1dated 21/12/1998/Amendment D ConformityMandatoryduring overhaul2000SB8260-12X-24-012Rev. 1dated 09/08/1999/Amendment EImprovement ofreliabilityDuring repair ifcomponent hasto be replaced2003SB8260-12X-24-013dated 17/12/2002//OverhaulprocedureMandatoryduring overhaul/SB8260-12X-24-014Rev. 1dated 07/04/2004/Amendment F ComponentobsolescenceDuring repair ifcomponent hasto be replaced2006SB8260-12X-24-016dated 17/12/2004/Amendment GImprovement ofreliabilityDuring repair ifcomponent hasto be replaced2012SB8260-12X-24-017dated 12/11/2012AC GENERATOR P/N 20032-2CMM reference : 24-22-61Revision 4 : Date of update May, 30th 2008Evolution Reason ApplicationInProductionsinceSBSIL/Verification ofmeasurementUnder repair / /SIL20032-X-24-003dated 06/1993/Verification oftorque valueOn aircraftUnder repair/ /SIL20032-2-24-007dated 28/09/2004/Improvement ofreliabilityUnder repair(overhaul orbearingreplacement)/ /SIL20032-2-24-008dated 24/03/2005/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/20117


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason ApplicationAmendment A ComponentobsolescenceInProductionsinceDuring repair ifcomponent has 1988to be replacedSBSB20032-2-24-002dated 15/02/1992SIL/Amendment BAmendment CAmendment DAmendment EAmendment FImprovement ofreliabilityImprovement ofrepair procedureImprovement ofreliabilityImprovement ofreliabilityImprovement ofreliabilityDuring repair ofrotating diodesbridges.Under repaironly if rewindingof stator isnecessaryOn customerrequestorif componenthas to bereplaced(P058137)Recommended /On customerrequest orif componenthas to bereplaced(P058137 orP058137A)During repair ifcomponent hasto be replaced1988 / /Onlyunder repairsince 1997/ /1998 / /19991999SB20032-2-24-009Rev. 1dated 03/04/2008SB20032-2-24-005dated 21/12/1998//Amendment GAmendment HAmendment JImprovement ofreliabilityImprovement ofreliability &assemblyprocedure.Improvement ofreliability &assemblyprocedure.Qualification of anew source.During repair ifcomponent hasto be replacedDuring repair ifcomponent hasto be replacedDuring repair ifcomponent hasto be replaced(Diode-holderplate assy.)1999200<strong>42</strong>007SB20032-2-24-006dated 21/12/1998SB20032-2-24-007dated 04/12/2002SB20032-2-24-008Rev. 1dated 03/04/2008//SIL20032-2-24-009Rev 1dated 31/03/2008Amendment KImprovement ofreliabilityDuring repair ifcomponent hasto be replaced2012SB20032-2-24-010dated 27/01/20128


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>AC GCU P/N 2432-11CMM reference : 24-22-14Revision 4 : Date of update September, 30th 1999Evolution Reason ApplicationInProductionsinceSBSIL/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/2011/ElectrostaticDischargeSensitiveComponentsRecommended / /SIL24-99-002dated 09/12/2010Amendment AImprovement ofreliabilityMandatoryduring repair byOEM only1988SB2432-11-24-002dated 15/02/1992/Amendment BImprovement ofreliabilityMandatoryduring repair byOEM only1988SB2432-11-24-003dated 15/02/1992/Amendment CImprovement ofreliabilityAmendment D ComponentobsolescenceMandatoryduring repairDuring repair ifPCB orcomponent hasto be replacedSystematicallyduring repair ifPCB Z500 mustbe replaced1989 / /Onlyunder repairsince 1998SB2432-30-24-001dated 25/04/2006/Amendment EImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replacedOnlyunder repairsince 1998SB2432-30-24-002Dated 07/12/2009SIL2432-11-24-001dated 15/11/20062432-30Modification for<strong>ATR</strong><strong>72</strong>-210version (newpropeller).On customerrequest1994SB2432-30-24-001dated 10/1993/9


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>AC GCU P/N 2432-30CMM reference : 24-22-14Revision 4 : Date of update September, 30th 1999Evolution Reason ApplicationInProductionsinceSBSIL/Mechanical checkof the rear guidebushing.Under repair / /SIL2432-30-24-001dated 21/06/2007/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/2011/ElectrostaticDischargeSensitiveComponentsRecommended / /SIL24-99-002dated 09/12/2010Amendment A ComponentobsolescenceDuring repair ifPCB orcomponent hasto be replacedSystematicallyduring repair ifPCB Z500 mustbe replaced1999SB2432-30-24-001dated 25/04/2006/Amendment BImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replaced1999SB2432-30-24-002dated 07/12/2009/DC GCU P/N 102-003-11CMM reference : 24-32-11Revision 2 : Date of update July, 5th 2006Evolution Reason Application/Mechanical checkof the rear guidebushing.InProductionsinceUnder repair / /SBSILSIL102-003-11-24-002dated 21/06/200710


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason Application/OrderconsumablesproductsInProductionsinceRecommended / /SBSILSIL24-99-001dated 03/01/2011/ElectrostaticDischargeSensitiveComponentsRecommended / /SIL24-99-002dated 09/12/2010Amendment AAmendment BAmendment CAmendment DAmendment EImprovement ofreliabilityImprovement ofreliabilityImprovement ofreliabilityImprovement ofreliabilityImprovement ofreliabilityMandatoryduring repair.Recommendedduring repair.Mandatoryduring repair.Mandatoryduring repair.Mandatoryduring repair.19881988198820012004SB102-003-11-24-001dated 15/02/1992SB102-003-11-24-002dated 15/02/1992SB102-003-11-24-004dated 15/02/1992SB102-003-11-24-005dated 22/12/1999SB102-003-11-24-006Rev. 2dated 08/11/2012/////Amendment FImprovement ofreliabilityOn customerrequest or ifPCB has to berepaired.2005SB102-003-11-24-007dated 27/01/2005/Amendment G ComponentobsolescenceDuring repair ifselector switchor PCB has tobe replaced2006SB102-003-11-24-008dated 25/04/2006/AC BPCU GCU P/N 945-11CMM reference : 24-41-13Revision 3 : Date of update June, 15th 1999Evolution Reason Application/OrderconsumablesproductsInProductionsinceRecommended / /SBSILSIL24-99-001dated 03/01/201111


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason Application/ElectrostaticDischargeSensitiveComponentsInProductionsinceRecommended / /SBSILSIL24-99-002dated 09/12/2010Amendment AImprovement ofreliabilityMandatoryduring repair.1989SB945-11-24-002ated 02/1992/945-12Improvement ofreliabilityOn customerrequest.1997SB945-11-24-003dated 30/06/1996/AC BPCU GCU P/N 945-12CMM reference : 24-41-13Revision 3 : Date of update June, 15th 1999Evolution Reason Application/Mechanical checkof the rear guidebushing.InProductionsinceSB/ / /SILSIL945-12-24-001dated 21/06/2007/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/2011/ElectrostaticDischargeSensitiveComponentsRecommended / /SIL24-99-002dated 09/12/201012


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>DC BPCU P/N 105-003-1CMM reference : 24-76-13Revision 3 : Date of update August, 8 th 2006Evolution Reason ApplicationAmendment A//OrderconsumablesproductsElectrostaticDischargeSensitiveComponentsImprovement ofreliabilityInProductionsinceRecommended / /Recommended / /Mandatoryduring repair.1994SBSB105-003-24-003dated 02/1992SILSIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/2010/Amendment BImprovement ofreliabilityMandatoryduring repair.1994SB105-003-24-004dated 02/1992/Amendment CImprovement ofmanufacturingprocessDuring repair ifcomponent hasto be replaced1994SB105-003-24-005dated 02/1992/Amendment DImprovement ofreliabilityMandatoryduring repair.1994SB105-003-24-006dated 02/1992/Amendment EImprovement ofreliabilityMandatoryduring repair.1994SB105-003-24-007dated 02/1992/Amendment FImprovement ofreliabilityMandatoryduring repair.1994SB105-003-24-001dated 09/1990/Amendment GImprovement ofreliabilityMandatoryduring repair.Onlyunder repairsince 1993/ /Amendment HImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replacedOnlyunder repairsince 1998SB105-003-24-008dated 21/12/1998/Amendment JImprovement ofreliabilityDuring repair ifPCB has to bereplaced.Onlyunder repairsince 1998/ /Amendment KImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replacedOnlyunder repairsince 1999SB105-003-24-009dated 21/12/1998/13


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason ApplicationAmendment LImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replacedInProductionsinceOnlyunder repairsince 1999SBSIL/ /Amendment M ComponentobsolescenceDuring repair ifPCB orcomponent hasto be replacedOnlyunder repairsince 2001/ /Amendment NImprovement ofreliabilityMandatoryduring repair.Onlyunder repairsince 2003SB105-003-24-011dated 12/01/2004/Amendment P ComponentobsolescenceDuring repair ifPCB orcomponent hasto be replacedOnlyunder repairsince 2004SB105-003-24-012dated 25/04/2006/105-003-2Improvement ofreliabilityOn customerrequest.1990SB105-003-24-002dated 02/1992/DC BPCU P/N 105-003-2CMM reference : 24-76-13Revision 3 : Date of update August, 8 th 2006Evolution Reason Application/Mechanical checkof the rear guidebushing.InProductionsinceSB/ / /SILSIL105-003-2-24-001dated 26/06/2007/OrderconsumablesproductsRecommended / /SIL24-99-001dated 03/01/2011/ElectrostaticDischargeSensitiveComponentsRecommended / /SIL24-99-002dated 09/12/201014


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason ApplicationInProductionsinceSBSILAmendment GImprovement ofreliabilityOn customerrequest.1994 / /Amendment HImprovement ofreliabilityMandatoryduring repair.1994 / /Amendment JImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replaced1999SB105-003-24-008dated 21/12/1998/Amendment KImprovement ofreliabilityDuring repair ifPCB has to bereplaced.1999 / /Amendment LImprovement ofreliabilityDuring repair ifPCB orcomponent hasto be replaced2000SB105-003-24-009dated 21/12/1998/Amendment MImprovement ofreliabilityAmendment N ComponentobsolescenceDuring repair ifPCB orcomponent hasto be replacedDuring repair ifPCB orcomponent hasto be replaced2000 / /2002 / /Amendment P ComponentobsolescenceDuring repair ifPCB orcomponent hasto be replaced2003SB105-003-24-010dated 12/01/2004/Amendment RImprovement ofreliabilityMandatoryduring repair.2004SB105-003-24-011dated 12/01/2004/Amendment S ComponentobsolescenceDuring repair ifPCB orcomponent hasto be replaced2005SB105-003-24-012dated 25/04/2006/15


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>STATIC INVERTER P/N 559-012ACMM reference : 24-21-11Revision 2 : Date of update June, 15th 2001Evolution Reason ApplicationAmendment AAmendment BAmendment C///Checking of overvoltagethresholdprotectionOrderconsumablesproductsElectrostaticDischargeSensitiveComponentsImprovement ofreliabilityImprovement ofthe control of"Static Inverterfault" signalImprovement ofreliability ofauxiliary powercardAmendment D Componentobsolescence559-012CImprovement ofreliability in orderto avoid doubleloss of staticinverterInProductionsinceUnder repair / /Recommended / /Recommended / /Mandatoryduring repairMandatoryduring repairMandatoryduring repairDuring repair ifPCB orcomponent hasto be replacedMandatoryduring repairSBSILSIL 559-012B-24-001dated 15/06/2006SIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/20101995 / /1995 / /Onlyunder repairsince 1997Onlyunder repairsince 2004Onlyunder repairsince 2009SB559-012A-80-001dated 15/12/1997/ /SB559-012AB-24-002Rev. 1dated 25/01/2011//STATIC INVERTER P/N 559-012BCMM reference : 24-21-11Revision 2 : Date of update June, 15th 2001Evolution Reason Application/OrderconsumablesproductsInProductionsinceRecommended / /SBSILSIL24-99-001dated 03/01/201116


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason Application/ElectrostaticDischargeSensitiveComponentsAmendment B Componentobsolescence559-012DImprovement ofreliability in orderto avoid doubleloss of staticinverterInProductionsinceRecommended / /During repair ifPCB orcomponent hasto be replacedMandatoryduring repairSBSILSIL24-99-002dated 09/12/20102005 / /2008SB559-012AB-24-002Rev. 1dated 25/01/2011/STATIC INVERTER P/N 559-012CCMM reference : 24-21-11Revision 2 : Date of update June, 15th 2001Evolution Reason Application//OrderconsumablesproductsElectrostaticDischargeSensitiveComponentsInProductionsinceRecommended / /Recommended / /SBSILSIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/2010STATIC INVERTER P/N 559-012DCMM reference : 24-21-11Revision 2 : Date of update June, 15th 2001Evolution Reason Application//OrderconsumablesproductsElectrostaticDischargeSensitiveComponentsInProductionsinceRecommended / /Recommended / /SBSILSIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/201017


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>TRU P/N F11NA3121CMM reference : 24-32-13Revision / : Date of update October, 15th 1996Evolution Reason Application//OrderconsumablesproductsElectrostaticDischargeSensitiveComponentsInProductionsinceRecommended / /Recommended / /SBSILSIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/2010LIGHTING TRANSFORMER P/N 156Technical Characteristics & Maintenance Sheet reference :30-31-13Revision 3 : Date of update April, 2010Evolution Reason ApplicationInProduction SBSILsince/ / / / / /CONTROL BOX P/N F46BC0101CMM reference : 26-15-24Revision 1 : Date of update December, 01st 1993Evolution Reason Application//OrderconsumablesproductsElectrostaticDischargeSensitiveComponentsInProductionsinceRecommended / /Recommended / /SBSILSIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/201018


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>Evolution Reason ApplicationAmendment AAmendment BImprovement ofreliability andfunctionning.Improvement ofmanufacturing &repair processes.Mandatoryunder repair.During repair ifnecessary.InProductionsinceSBSIL1987 / /2009SBF46BC0101-24-001dated 29/08/2012//Amendment CAmendment DInspection of thefan control boxImprovement ofreliabilityImprovement ofreliabilityUnit inoperationDuring repair ifnecessary.During repair ifnecessary.2012SBF46BC0101-24-002dated 31/08/20122012 / /2012 / /CONTROL BOX P/N F46BD0101CMM reference : 26-15-25Revision / : Date of update June, 15th 2001Evolution Reason Application//OrderconsumablesproductsElectrostaticDischargeSensitiveComponentsInProductionsinceRecommended / /Recommended / /SBSILSIL24-99-001dated 03/01/2011SIL24-99-002dated 09/12/2010Amendment AImprovement ofreliability.Only underproduction.1996 / /LANDING GEAR CONTROL LEVEL P/N F96GA0101CMM reference : 32-31-11Revision 2 : Date of update January, 26th 2009Evolution Reason Application/OrderconsumablesproductsInProductionsinceRecommended / /SBSILSIL24-99-001dated 03/01/201119


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>LANDING GEAR CONTROL LEVEL P/N F96GA0102CMM reference : 32-31-11Revision 2 : Date of update January, 26th 2009Evolution Reason Application/Amendment AOrderconsumablesproductsImprovement offunctionningInProductionsinceRecommended / /Mandatoryduring repair.SBSILSIL24-99-001dated 03/01/20111987 / /Amendment BImprovement ofreliabilityOn customerrequest.1989 / /Amendment CImprovement ofreliabilityOn customerrequest.1998SBF96GA0102-24-001dated 21/12/1998/Amendment DImprovement offunctionningDuring repair ifcomponent hasto be replaced.2001 / /TRANSFORMER (DPCT) P/N 20732(DPCT : Differential Protection Current Transformer)Technical Characteristics & Maintenance Sheet reference :24-22-11Revision 2 : Date of update June, 1993Evolution Reason ApplicationInProductionsinceSBSIL/ / / / / /20


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>HALL EFFECT CAPTOR SENSOR P/N 103-003-2Technical Characteristics & Maintenance Sheet reference :24-32-12Revision 4 : Date of update April, 2006Evolution Reason ApplicationAmendment AImprovement ofreliabilityOnly underproductionInProductionsinceSBSIL1998 / /Amendment BImprovement ofreliabilityOnly underproduction2003 / /EMERGENCY AXE P/N 680-0040-000Technical Characteristics & Maintenance Sheet reference :25-65-01Revision 1 : Date of update 1992Evolution Reason Application/Packaging forEmergency axeRecommendedfor shipmentInProductionsinceSB/ /SILSIL680-0040-000-25-001dated 26/10/2009DC-STAR GSE P/N B3893-000USER MANUAL : Y28-0617Revision a : Date of update October, 17 rd 2008Evolution Reason ApplicationInProductionsinceSBSIL/ / / / / /21


<strong>2013</strong> TAES – TECHNICAL PUBLICATIONIssued: January <strong>2013</strong><strong>ATR</strong>4. STATEMENT OF AGREEMENTStatement of Agreement to Terms and Conditions of Sale of Thales TechnicalPublicationsThales Component Maintenance Manual 24-XX-XX is intended solely for use byCompany Name. Copying, reproducing or redistribution of this or any ThalesComponent Maintenance Manual (CMM) or Service Bulletin (SB), to any other party orlocation is strictly prohibited without Thales prior written consent.Thales retains all intellectual property rights, title and interest in the CMMs and/or SBsprovided, including all rights under applicable patents, copyrights, trademarks and tradesecrets, and all renewals and extensions thereto. Company Name shall not alter orremove any patent, copyright, trademark, or proprietary rights notice.Agreed to and Accepted by:____________________________(Print Name)____________________________(Signature)__________________________(Title)__________________________(Date)22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!