28.11.2012 Views

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRINKING WATER TREATMENT<br />

Year<br />

Consultant(s) Client<br />

2010 IWA Consalt GTZ<br />

2007-<br />

2008<br />

2007-<br />

2008<br />

2007<br />

2006-<br />

2007<br />

Tahal<br />

St.Petersburg /<br />

IWA Consalt<br />

Tahal<br />

St.Petersburg /<br />

IWA Consalt<br />

Energoprojekt /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Vodokanal<br />

St.Petersburg<br />

Vodokanal<br />

St.Petersburg<br />

Project<br />

Location<br />

Kladovo,<br />

Serbia<br />

Russia, St.<br />

Petersburg<br />

Russia, St.<br />

Petersburg<br />

IWA Consalt<br />

Service(s)<br />

Detailed Design<br />

Preliminary<br />

Design<br />

Preliminary and<br />

Detailed Design<br />

Belgrade Waterworks Serbia Technical Review<br />

BEATL / ECOU /<br />

AL AMARA<br />

Libya<br />

Project<br />

management,<br />

Detailed Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Detailed design of <strong>water</strong><br />

<strong>treatment</strong> plant and<br />

reservoir “Ljubičevac” with<br />

pump stations “Ljubičevac”<br />

and “Grabovica”<br />

Preliminary Design of<br />

Water Treatment Plant<br />

"Kolpinskaya"<br />

Preliminary and Detailed<br />

Design of Water Treatment<br />

Plant "Glavnaya"<br />

Re<strong>cons</strong>truction of “Bezanija<br />

III” Water Treatment Plant<br />

National Programme for<br />

Water Supply and<br />

Sewerage –<br />

Phase IV<br />

Hydro-mechanical,<br />

architectural, <strong>cons</strong>truction and<br />

electrical engineering Detail<br />

Design of <strong>water</strong> <strong>treatment</strong><br />

plant reservoir "Ljubičevac"<br />

withpump stations "Ljubičevac"<br />

and "Grabovica" with<br />

maximum capacity of 50 l / s<br />

Preparation of civil and<br />

mechanical parts of the<br />

Preliminary Design of WTP<br />

"Kolpinskaya (Q=500<br />

000 m3/day)<br />

Preparation of civil and<br />

mechanical parts of the Basic<br />

and Detailed Design of WTP<br />

"Glavnaya" (Q=500 000<br />

m3/day)<br />

Technical review of the<br />

Detailed Design for the<br />

Bezanija WTP (Q=1000 l/s)<br />

Hydraulic design of <strong>water</strong><br />

<strong>treatment</strong> facilities for 34 cities<br />

/ settlements within the Libyan<br />

municipalities of Sabha, Sirt,<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 1 of 15<br />

25/03/2010


DRINKING WATER TREATMENT<br />

Year<br />

2006<br />

2005<br />

2004<br />

Consultant(s) Client<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

TAHAL / IWA<br />

Consalt<br />

BEATL / ECOU /<br />

AL AMARA<br />

Project<br />

Location<br />

Libya<br />

BEATL / ECOU Libya<br />

Belgrade Waterworks /<br />

City of Belgrade<br />

2003 IWA Consalt Gacko Waterworks<br />

Serbia<br />

Bosnia and<br />

Herzegovina<br />

IWA Consalt<br />

Service(s)<br />

Project<br />

management,<br />

Preliminary<br />

Design, Site<br />

supervision<br />

Project<br />

management,<br />

Conceptual<br />

Design<br />

Design<br />

Coordination,<br />

Final Design<br />

Detailed Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phases II,III<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phase I<br />

Drinking Water Treatment<br />

Plant “Makis 2”<br />

Water Treatment Plant for<br />

the City of Gacko<br />

Wadi Al Hayat, and Wadi Al<br />

Shati.<br />

Tasks included preparation of<br />

existing status reports, as well<br />

as conceptual, preliminary and<br />

Detailed design.<br />

Preparation of hydraulic parts<br />

of the Final Design for the new<br />

WTP with Q=2 m 3 /s (5 m 3 /s<br />

total plant capacity), as part of<br />

a Design / Supply contract.<br />

Tasks included General<br />

Hydraulic Design and External<br />

Infrastructure design (external<br />

process pipelines, raw <strong>water</strong><br />

delivery pipelines, potable and<br />

service <strong>water</strong> networks,<br />

sanitary sewer system, storm<br />

<strong>water</strong> system and synchrone<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 2 of 15<br />

25/03/2010<br />

plan).<br />

Preparation of Detailed Design<br />

for the WTP (Q=100 l/s)


DRINKING WATER TREATMENT<br />

Year<br />

2003<br />

2002<br />

Consultant(s) Client<br />

UnionInvest / IWA<br />

Consalt<br />

Energoprojekt<br />

Oprema / IWA<br />

Consalt<br />

2002 IWA Consalt<br />

Sanski Most<br />

Waterworks<br />

British American<br />

Tobacco (BAT)<br />

Vrnjacka Banja<br />

Waterworks<br />

Project<br />

Location<br />

Bosnia and<br />

Herzegovina<br />

IWA Consalt<br />

Service(s)<br />

Detailed Design<br />

Nigeria Detailed Design<br />

Serbia<br />

Preliminary<br />

Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Water Treatment Plant for<br />

the City of Sanski Most<br />

Water Treatment Plant for a<br />

BAT cigarette factory<br />

Water Treatment Plant<br />

Rehabilitation and Upgrade<br />

Preparation of civil and<br />

mechanical parts of Detailed<br />

Design for the WTP (Q=250<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 3 of 15<br />

25/03/2010<br />

l/s)<br />

Preparation of Detailed Design<br />

for the WTP (<strong>drinking</strong> <strong>water</strong><br />

and service <strong>water</strong>)<br />

Preparation of Detailed Design<br />

of a WTP rehabilitation and<br />

upgrade (Q=40 l/s)


DRINKING WATER SUPPLY<br />

Year<br />

2010<br />

Consultant(s) Client<br />

SETEC<br />

engineering/IWA<br />

Consalt<br />

Kfw and<br />

municipality<br />

Pančevo<br />

Project<br />

Location<br />

Pančevo,<br />

Serbia<br />

IWA Consalt<br />

Service(s)<br />

Detailed design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Implementation of Phase<br />

2 of Water and Sewerage<br />

Programme in Medium<br />

Sized Municipalities in<br />

Serbia “Pancevo”<br />

- Network rehabilitation in Pančevo<br />

includes the replacement of ~6.6 km<br />

(around 40+years old) AC, Galvanized<br />

Cast Iron (CI) and PVC pipes with<br />

HDPE pipes (including hydrants and<br />

exchange of service connections)<br />

- Pipeline DN280 from Stari Tamis to<br />

Dolovo, Booster station for Dolovo 148<br />

m3/h, small booster station for<br />

settlement StariTamiš 25 m3/h, and<br />

550 m3 <strong>water</strong> tower in Dolovo. Review<br />

and Amendment of existing design<br />

from Pancevo until Stari Tamis<br />

- 5,000 m3 concrete reservoir, ground<br />

storage tankl, including mechanical and<br />

electrical equipment.<br />

- Construction of DN800 steel pipeline,<br />

~1.8 km long, including cathodic<br />

protection equipment and pressure<br />

control point in the City network<br />

- Construction of new 20 kV electric<br />

feeder, ~4 km long, XHE49A<br />

3x(1x150mm2), including<br />

re<strong>cons</strong>truction of electrical substation at<br />

the “old” WTP<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 4 of 15<br />

25/03/2010


DRINKING WATER SUPPLY<br />

Year<br />

2010<br />

Consultant(s) Client<br />

Delta<br />

inženjering/IWA<br />

Consalt<br />

2010 IWA Consalt<br />

2009 IWA Consalt<br />

Fiat automobili<br />

Srbija<br />

Municipality Šid and<br />

GTZ<br />

JP REGIONALNI<br />

VODOVOD<br />

CRNOGORSKO<br />

PRIMORJE<br />

2008 IWA Consalt Waterworks Loznica<br />

2008 IWA Consalt<br />

Waterworks “Izvor”<br />

Petrovac<br />

Project<br />

Location<br />

Kragujevac,<br />

Serbia<br />

Municipality<br />

Šid, Serbia<br />

Montenegro<br />

Loznica,<br />

Serbia<br />

Petrovac,<br />

Serbia<br />

IWA Consalt<br />

Service(s)<br />

Detailed design<br />

Detailed design<br />

Hydraulic<br />

analysis<br />

Preliminary and<br />

Detailed Design<br />

Preliminary and<br />

Detailed Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Building new and<br />

re<strong>cons</strong>truction of existing<br />

hydro-technical<br />

installations with<br />

supporting facilities<br />

Detail design of <strong>water</strong><br />

supply networks for<br />

villages: Molovin, Sot,<br />

Bikić Do i Privina glava<br />

Hydraulic analysis of<br />

steady state, quasisteady<br />

state and transient<br />

flows during exploitation<br />

of Regional <strong>water</strong><br />

supplying system for<br />

Montenegro coast.<br />

Re<strong>cons</strong>truction of the<br />

main delivery pipeline and<br />

central pumping station<br />

within the <strong>water</strong> supply<br />

system for City of Loznica<br />

Preliminary and Detailed<br />

Design of <strong>water</strong> reservoir<br />

and pumping station<br />

Detail design of sanitary, industrial,<br />

demineralised, technical, demineralised<br />

and fire fighting <strong>water</strong> installations and<br />

reservoir re<strong>cons</strong>truction<br />

Detail design of <strong>water</strong> supply networks<br />

for villages: Molovin, Sot, Bikić Do i<br />

Privina glava<br />

Hydraulic analysis of Regional <strong>water</strong><br />

supplying system for Montenegro coast<br />

with capacity of 1300 l/s in phase I and<br />

1700 l/s in phase II.<br />

Preparation of civil, structural and<br />

mechanical parts of the Preliminary and<br />

Detailed Design for the re<strong>cons</strong>truction<br />

of the central pumping station (Q=500<br />

l/s) and 8 km main delivery pipeline for<br />

the City of Loznica (population 43000)<br />

Preparation of civil, structural and<br />

mechanical parts of the Preliminary and<br />

Detailed Design of 1500 m3 <strong>water</strong><br />

reservoir and additional pumping<br />

station<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 5 of 15<br />

25/03/2010


DRINKING WATER SUPPLY<br />

Year<br />

Consultant(s) Client<br />

2008 IWA Consalt<br />

2008 IWA Consalt<br />

2006-<br />

2007<br />

2006<br />

2005<br />

2005<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

PM Lucas / IWA<br />

Consalt<br />

Waterworks<br />

Krusevac<br />

Waterworks<br />

Krusevac<br />

BEATL / ECOU /<br />

AL AMARA<br />

BEATL / ECOU /<br />

AL AMARA<br />

Project<br />

Location<br />

Krusevac,<br />

Serbia<br />

Krusevac,<br />

Serbia<br />

Libya<br />

Libya<br />

BEATL / ECOU Libya<br />

PetroKazakhstan Kazakhstan<br />

IWA Consalt<br />

Service(s)<br />

Preliminary<br />

Design<br />

Preliminary and<br />

Detailed Design<br />

Project<br />

management,<br />

Detailed Design<br />

Project<br />

management,<br />

Preliminary<br />

Design, Site<br />

supervision<br />

Project<br />

management,<br />

Conceptual<br />

Design<br />

Hydraulic<br />

modeling and<br />

Conceptual<br />

Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Control system analysis<br />

and design for the<br />

regional <strong>water</strong> system<br />

“Ćelije”<br />

Preliminary and Detailed<br />

Design of <strong>water</strong> reservoir<br />

National Programme for<br />

Water Supply and<br />

Sewerage –<br />

Phase IV<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phases II,III<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phase I<br />

Water injection system<br />

upgrade for the Kumkol<br />

oil field<br />

Control system analysis and design for<br />

the regional <strong>water</strong> system “Ćelije”<br />

Preparation of civil, structural and<br />

mechanical parts of the Preliminary and<br />

Detailed Design of 5000 m3 <strong>water</strong><br />

reservoir and adjacent pipes.<br />

The <strong>project</strong> involves hydraulic design of<br />

<strong>water</strong> supply (distribution/collection<br />

systems) for 34 cities / settlements<br />

within the Libyan municipalities of<br />

Sabha, Sirt, Wadi Al Hayat, and Wadi<br />

Al Shati.<br />

Development of a hydraulic model and<br />

preparation of Conceptual Design of<br />

the <strong>water</strong> injection system<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 6 of 15<br />

25/03/2010


DRINKING WATER SUPPLY<br />

Year<br />

2002<br />

Consultant(s) Client<br />

Energoprojekt<br />

Oprema / IWA<br />

Consalt<br />

2002 IWA Consalt<br />

2002 IWA Consalt<br />

2002 IWA Consalt<br />

2001<br />

2001<br />

Integral<br />

Inzenjering /<br />

IWA Consalt<br />

PM Lucas / IWA<br />

Consalt<br />

British American<br />

Tobacco (BAT)<br />

Soko Banja<br />

Waterworks<br />

Krusevac<br />

Waterworks<br />

Mladenovac<br />

Waterworks<br />

USAID<br />

Project<br />

Location<br />

IWA Consalt<br />

Service(s)<br />

Nigeria Detailed Design BAT cigarette factory<br />

Serbia<br />

Serbia<br />

Hydraulic<br />

Analysis<br />

Hydraulic<br />

Analysis<br />

Serbia Detailed Design<br />

Bosnia and<br />

Herzegovina<br />

PetroKazakhstan Kazakhstan<br />

Detailed Design<br />

Hydraulic<br />

Analysis<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Hydraulic analysis for the<br />

Soko Banja <strong>water</strong> supply<br />

Preparation of Detailed Design of<br />

external infrastructure<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 7 of 15<br />

25/03/2010<br />

system<br />

Surge analysis and <strong>water</strong><br />

hammer protection for PS<br />

Tekija 2<br />

New well for the<br />

Mladenovac <strong>water</strong> supply<br />

system<br />

Water supply system for a<br />

group of villages around<br />

the City of Brcko<br />

Water injection system for<br />

the Kumkol oilfield<br />

Development of hydraulic model and<br />

analysis of the Soko Banja <strong>water</strong><br />

supply system<br />

Surge analysis for the Tekija 2 Pumping<br />

Station<br />

Preparation of Detailed Design for a<br />

new well<br />

Preparation of Detailed Design for the<br />

<strong>water</strong> supply system Stjepkovica (Q=<br />

25 l/s)<br />

Preparation of a hydraulic analysis for a<br />

<strong>water</strong> injection system upgrade (110<br />

bars) for increased demand (from 100<br />

l/s to 350 l/s)


WASTEWATER TREATMENT<br />

Year<br />

2010<br />

2007<br />

2007<br />

Consultant(s) Client<br />

Tahal/IWA<br />

Consalt<br />

DHV Water / IWA<br />

Consalt / FIDECO<br />

DHV Water / IWA<br />

Consalt / FIDECO<br />

Vodokanal<br />

St. Petersburg<br />

Project<br />

Location<br />

St. Petersburg,<br />

Russia<br />

IWA Consalt<br />

Service(s)<br />

Hydraulic<br />

modelling<br />

analysis<br />

Subotica Waterworks Serbia Detailed Design<br />

Podgorica Waterworks Montenegro Detailed Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Hydraulic modelling<br />

analysis for the waste<strong>water</strong><br />

<strong>treatment</strong> facility<br />

“Central aeration plant of<br />

St. Petersburg”<br />

Extension and<br />

Re<strong>cons</strong>truction of the<br />

Waste Water Treatment<br />

Plant for the City of<br />

Subotica<br />

Re<strong>cons</strong>truction and<br />

Rehabilitation of the Waste<br />

Water Treatment Plant for<br />

the City of Podgorica<br />

Development of hydraulic<br />

model of the WWTP "White<br />

Island" maximum capacity<br />

30m 3 /s with SWMM software<br />

package.<br />

Preparation of civil, structural<br />

and mechanical parts of the<br />

Detailed Design, of new WWT<br />

facilities (150,000 population<br />

equivalent, maximum flow of<br />

6900 m 3 /h).<br />

IWA’s scope included the<br />

General Hydraulic Design as<br />

well as design of the following<br />

facilities: primary and final<br />

sedimentation tanks, aeration<br />

tanks, division boxes.<br />

Preparation of civil and<br />

structural parts of the Detailed<br />

Design.The <strong>project</strong> <strong>cons</strong>ists of<br />

renewal of hydro-mechanical<br />

equipment, implementation of<br />

a higher level of system<br />

monitoring and improvements<br />

on the sludge line.<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 8 of 15<br />

25/03/2010


WASTEWATER TREATMENT<br />

Year<br />

2006-<br />

2007<br />

2006<br />

2005<br />

2002<br />

Consultant(s) Client<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Energoprojekt<br />

Oprema / IWA<br />

Consalt<br />

BEATL / ECOU /<br />

AL AMARA<br />

BEATL / ECOU /<br />

AL AMARA<br />

Project<br />

Location<br />

Libya<br />

Libya<br />

BEATL / ECOU Libya<br />

British American<br />

Tobacco (BAT)<br />

IWA Consalt<br />

Service(s)<br />

Project<br />

management,<br />

Detailed Design<br />

Project<br />

management,<br />

Preliminary<br />

Design, Site<br />

supervision<br />

Project<br />

management,<br />

Conceptual<br />

Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

National Programme for<br />

Water Supply and<br />

Sewerage –<br />

Phase IV<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phases II,III<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phase I<br />

Nigeria Detailed Design BAT cigarette factory<br />

Hydraulic design of<br />

waste<strong>water</strong> <strong>treatment</strong> facilities<br />

for 34 cities / settlements<br />

within the Libyan municipalities<br />

of Sabha, Sirt, Wadi Al Hayat,<br />

and Wadi Al Shati.<br />

Preparation of Detailed Design<br />

of WWT<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 9 of 15<br />

25/03/2010


WASTEWATER COLLECTION<br />

Year<br />

Consultant(s) Client<br />

2009 IWA Consalt<br />

2009 IWA Consalt<br />

2009<br />

Dahlem<br />

Engineering<br />

Company/ IWA<br />

Consalt<br />

UNDP/Municipality<br />

Nova Varoš<br />

UNDP/Municipality<br />

Prijepolje<br />

Project<br />

Location<br />

Nova Varoš,<br />

Serbia<br />

Prijepolje,<br />

Serbia<br />

IWA Consalt<br />

Service(s)<br />

Preliminary<br />

design with<br />

feasibility study<br />

Preliminary<br />

design with<br />

feasibility study<br />

Voda<strong>com</strong> Montenegro Detailed Design<br />

2009 IWA Consalt Waterworks Loznica Serbia<br />

2009<br />

IWA Consalt /<br />

Beoinzenjering<br />

United Nations<br />

Development<br />

Programme<br />

(UNDP PRO)<br />

Serbia<br />

Preliminary and<br />

Detail Design<br />

Preliminary<br />

Design and<br />

Feasibility<br />

Studies<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Preliminary design and<br />

feasibility study of main<br />

waste <strong>water</strong> collectors in<br />

the town of Nova Varoš<br />

Preliminary design and<br />

feasibility study of main<br />

waste <strong>water</strong> collectors in<br />

the town of Prijepolje<br />

Water Supply and<br />

Sanitation Adriatic Coast III<br />

- Bar<br />

Preliminary and Detail<br />

Designs of the pressure<br />

main from the existing<br />

pumping station to the<br />

future WWTP and<br />

rehabilitation of the existing<br />

pumping station<br />

Preliminary Designs with<br />

Feasibility Studies for the<br />

waste<strong>water</strong> systems of<br />

Prijepolje , Nova Varos,<br />

Tutin i Sjenica<br />

Preliminary design and<br />

feasibility study of main waste<br />

<strong>water</strong> collectors in the town of<br />

Nova Varoš<br />

Preliminary design and<br />

feasibility study of main waste<br />

<strong>water</strong> collectors in the town of<br />

Prijepolje<br />

Preparation of Detailed design<br />

of sanitary sewage system for<br />

the coastal town of Sutomore.<br />

Project is the part of KfW<br />

programme.<br />

Preparation of Preliminary and<br />

Detailed design of the 2.6 km<br />

long pressure main and<br />

rehabilitation of the existing<br />

pumping station (Qsanitary=<br />

200 l/s, Qstorm=1500 l/s)<br />

United Nations Development<br />

Program PRO Program -<br />

preparation of preliminary<br />

design and feasibility study for<br />

the waste<strong>water</strong> collection<br />

systems.<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 10 of 15<br />

25/03/2010


WASTEWATER COLLECTION<br />

Year<br />

Consultant(s) Client<br />

Project<br />

Location<br />

2008 IWA Consalt Waterworks Zrenjanin Serbia<br />

2008<br />

2006-<br />

2007<br />

2006<br />

2005<br />

Beoinzenjering /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

IWA Consalt<br />

Service(s)<br />

Preliminary and<br />

Detailed Design<br />

Bar Waterworks Montenegro Detailed Design<br />

BEATL / ECOU /<br />

AL AMARA<br />

BEATL / ECOU /<br />

AL AMARA<br />

Libya<br />

Libya<br />

BEATL / ECOU Libya<br />

Project<br />

management,<br />

Detailed Design<br />

Project<br />

management,<br />

Preliminary<br />

Design, Site<br />

supervision<br />

Project<br />

management,<br />

Conceptual<br />

Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Preliminary and Detailed<br />

Design of sewage pumping<br />

station “Centar” and part of<br />

the sewage system in<br />

Zrenjanin<br />

Detailed design of sewage<br />

system in Sutomore<br />

National Programme for<br />

Water Supply and<br />

Sewerage –<br />

Phase IV<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phases II,III<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phase I<br />

Preparation of the civil,<br />

structural and mechanical<br />

parts of the Preliminary and<br />

Detailed Design of central<br />

sewage pumping station ,<br />

force main , and gravity sewer<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 11 of 15<br />

25/03/2010<br />

system<br />

Preparation of Detailed design<br />

for the Mirosica, Maljevik i<br />

Zagradje areas within the<br />

sanitary sewage system of the<br />

coastal town of Sutomore<br />

Hydraulic design of sewerage<br />

systems (distribution/collection<br />

systems) for 34 cities /<br />

settlements within the Libyan<br />

municipalities of Sabha, Sirt,<br />

Wadi Al Hayat, and Wadi Al<br />

Shati.<br />

Tasks included preparation of<br />

existing status reports, as well<br />

as conceptual, preliminary and<br />

Detailed design of sewage<br />

collection systems for<br />

settlements within the<br />

mentioned municipalities.


WASTEWATER COLLECTION<br />

Year<br />

2005<br />

2005<br />

2002<br />

Consultant(s) Client<br />

CDM / IWA<br />

Consalt<br />

Beoinzenjering /<br />

IWA Consalt<br />

Energoprojekt<br />

Oprema / IWA<br />

Consalt<br />

Project<br />

Location<br />

USAID Montenegro<br />

Bar Waterworks Montenegro<br />

British American<br />

Tobacco (BAT)<br />

IWA Consalt<br />

Service(s)<br />

Project<br />

management,<br />

Detailed Design<br />

Project<br />

management,<br />

Conceptual<br />

Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Rehabilitation of three<br />

coastal Waste Water<br />

Pumping Stations in Budva<br />

Conceptual Design for<br />

sewage system in<br />

Sutomore<br />

Nigeria Detailed Design BAT cigarette factory<br />

Preparation of Detailed design<br />

(civil, structural, mechanical,<br />

electrical) for three waste<strong>water</strong><br />

pumping stations (PS Old<br />

town, Q=20 l/s ; PS Budva 1,<br />

Q=90 l/s and PS Budva 2,<br />

Q=200 l/s)<br />

Preparation of the Conceptual<br />

design for the sanitary sewage<br />

system of the coastal town of<br />

Sutomore (population 20,000)<br />

Preparation of Detailed Design<br />

of external infrastructure<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 12 of 15<br />

25/03/2010


STORMWATER COLLECTION<br />

Year<br />

Consultant(s) Client<br />

Project<br />

Location<br />

2008 IWA Consalt Waterworks Zrenjanin Serbia<br />

2007 IWA Consalt<br />

Zrenjanin Land<br />

Development Public<br />

Agency<br />

STUDIES AND MASTER PLANS<br />

Year<br />

Consultant(s) Client<br />

Serbia<br />

Project<br />

Location<br />

IWA Consalt<br />

Service(s)<br />

Preliminary and<br />

Detailed Design<br />

Preliminary and<br />

Detailed Design<br />

IWA Consalt<br />

Service(s)<br />

2008 IWA Consalt Waterworks Subotica Serbia Study<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Preliminary and Detailed<br />

Design of storm <strong>water</strong><br />

sewers in Skreliceva and<br />

Kralja Petra streets in<br />

Zrenjanin<br />

Storm <strong>water</strong> system for<br />

southeast Industrial zone -<br />

City of Zrenjanin<br />

Preparation of the civil,<br />

structural and mechanical<br />

parts of the Preliminary and<br />

Detailed Design of central<br />

sewage pumping station ,<br />

force main , and gravity sewer<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 13 of 15<br />

25/03/2010<br />

system<br />

Preparation of civil, structural<br />

and mechanical parts of the<br />

Preliminary and Detailed<br />

Design of storm <strong>water</strong> system<br />

with a total catchment area of<br />

55 ha, and storm <strong>water</strong><br />

pumping Station<br />

Project Name Brief Description<br />

Study of sewage and storm<br />

system for sections VII and<br />

VIII of Subotica<br />

Study included hydraulic<br />

analyses of separate and<br />

<strong>com</strong>bined systems


STUDIES AND MASTER PLANS<br />

Year<br />

2007<br />

2003-<br />

2004<br />

2003<br />

Consultant(s) Client<br />

PM Lucas / IWA<br />

Consalt<br />

PECHER /<br />

Beoinzenjering /<br />

IWA Consalt<br />

PM Lucas / IWA<br />

Consalt<br />

KBM Joint Stock<br />

Company<br />

2001 IWA Consalt Gacko Waterworks<br />

Project<br />

Location<br />

IWA Consalt<br />

Service(s)<br />

Kazakhstan Feasibility Study<br />

City of Belgrade Serbia Feasibility Study<br />

PetroKazakhstan Kazakhstan Feasibility Study<br />

Bosnia and<br />

Herzegovina<br />

Master Plan<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Optimization of Feed Water<br />

Treatment Unit for PPG-3<br />

and PPG-4 Project<br />

Global Waste Water Study<br />

in Serbia &<br />

Pre-feasibility Study for<br />

Belgrade Waste Water<br />

Management<br />

Oil refinery waste<strong>water</strong><br />

<strong>treatment</strong> plant upgrade<br />

Master Plan for Water<br />

supply system for the City of<br />

Gacko<br />

Feasibility Study of extensions<br />

of mechanical <strong>water</strong> <strong>treatment</strong><br />

units for the Steam Generator<br />

Plants PPG-3 and PPG-4 at<br />

Karazhanabas Oil Field<br />

Preparation of the mentioned<br />

studies, funded by the EU<br />

CARDS programme. The<br />

main goal was to form a<br />

detailed overview of sewerage<br />

system conditions in Serbian<br />

municipalities based on<br />

collection and analysis of<br />

relevant data related to <strong>water</strong><br />

distribution/<strong>cons</strong>umption,<br />

demographics, waste <strong>water</strong><br />

<strong>treatment</strong>, etc.<br />

Preparation of a feasibility<br />

study for the WWTP (Q= 2 x<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 14 of 15<br />

25/03/2010<br />

220 l/s)<br />

Preparation of a Master Plan<br />

for the City of Gacko <strong>water</strong><br />

supply system


SOLID WASTE<br />

Year<br />

Consultant(s) Client<br />

Project<br />

Location<br />

IWA Consalt<br />

Service(s)<br />

2009 IWA Consalt KJP Naš Dom Serbia Detailed Design<br />

OTHER CONSULTING SERVICES<br />

Year<br />

Consultant(s) Client<br />

2008 IWA Consalt<br />

Ministry for<br />

Agriculture, Forestry<br />

and Water<br />

Management<br />

Project<br />

Location<br />

2007 IWA Consalt “POLIESTER”, Priboj Serbia<br />

IWA Consalt<br />

Service(s)<br />

Serbia Consulting<br />

Software<br />

Development<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Rehabilitation and<br />

sanitation of the landfill for<br />

the city of Loznica<br />

Preparation of Detailed design<br />

of rehabilitation and sanitation<br />

of the municipal and city<br />

landfill of Loznica (population<br />

86,000).<br />

Project Name Brief Description<br />

DREPR (Serbia Danube<br />

River Enterprise Pollution<br />

Reduction Project)<br />

Company Product<br />

Catalogue and Hydraulic<br />

Calculator<br />

Site visits and review of<br />

Preliminary, Detailed Design<br />

and Tender documentation.<br />

Facilities included storage<br />

tanks for slurry, channels and<br />

reception pits.<br />

Development of a software<br />

package including the<br />

<strong>com</strong>pany’s product line<br />

(polyester pipes, fitting, etc)<br />

and a hydraulic calculator.<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 15 of 15<br />

25/03/2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!