project references drinking water treatment - Iwa-cons.com
project references drinking water treatment - Iwa-cons.com
project references drinking water treatment - Iwa-cons.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DRINKING WATER TREATMENT<br />
Year<br />
2006<br />
2005<br />
2004<br />
Consultant(s) Client<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
TAHAL / IWA<br />
Consalt<br />
BEATL / ECOU /<br />
AL AMARA<br />
Project<br />
Location<br />
Libya<br />
BEATL / ECOU Libya<br />
Belgrade Waterworks /<br />
City of Belgrade<br />
2003 IWA Consalt Gacko Waterworks<br />
Serbia<br />
Bosnia and<br />
Herzegovina<br />
IWA Consalt<br />
Service(s)<br />
Project<br />
management,<br />
Preliminary<br />
Design, Site<br />
supervision<br />
Project<br />
management,<br />
Conceptual<br />
Design<br />
Design<br />
Coordination,<br />
Final Design<br />
Detailed Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phases II,III<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phase I<br />
Drinking Water Treatment<br />
Plant “Makis 2”<br />
Water Treatment Plant for<br />
the City of Gacko<br />
Wadi Al Hayat, and Wadi Al<br />
Shati.<br />
Tasks included preparation of<br />
existing status reports, as well<br />
as conceptual, preliminary and<br />
Detailed design.<br />
Preparation of hydraulic parts<br />
of the Final Design for the new<br />
WTP with Q=2 m 3 /s (5 m 3 /s<br />
total plant capacity), as part of<br />
a Design / Supply contract.<br />
Tasks included General<br />
Hydraulic Design and External<br />
Infrastructure design (external<br />
process pipelines, raw <strong>water</strong><br />
delivery pipelines, potable and<br />
service <strong>water</strong> networks,<br />
sanitary sewer system, storm<br />
<strong>water</strong> system and synchrone<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 2 of 15<br />
25/03/2010<br />
plan).<br />
Preparation of Detailed Design<br />
for the WTP (Q=100 l/s)