28.11.2012 Views

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRINKING WATER TREATMENT<br />

Year<br />

2006<br />

2005<br />

2004<br />

Consultant(s) Client<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

Meridian<strong>project</strong> /<br />

IWA Consalt<br />

TAHAL / IWA<br />

Consalt<br />

BEATL / ECOU /<br />

AL AMARA<br />

Project<br />

Location<br />

Libya<br />

BEATL / ECOU Libya<br />

Belgrade Waterworks /<br />

City of Belgrade<br />

2003 IWA Consalt Gacko Waterworks<br />

Serbia<br />

Bosnia and<br />

Herzegovina<br />

IWA Consalt<br />

Service(s)<br />

Project<br />

management,<br />

Preliminary<br />

Design, Site<br />

supervision<br />

Project<br />

management,<br />

Conceptual<br />

Design<br />

Design<br />

Coordination,<br />

Final Design<br />

Detailed Design<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phases II,III<br />

National Programme for<br />

Water Supply and<br />

Sewerage – Phase I<br />

Drinking Water Treatment<br />

Plant “Makis 2”<br />

Water Treatment Plant for<br />

the City of Gacko<br />

Wadi Al Hayat, and Wadi Al<br />

Shati.<br />

Tasks included preparation of<br />

existing status reports, as well<br />

as conceptual, preliminary and<br />

Detailed design.<br />

Preparation of hydraulic parts<br />

of the Final Design for the new<br />

WTP with Q=2 m 3 /s (5 m 3 /s<br />

total plant capacity), as part of<br />

a Design / Supply contract.<br />

Tasks included General<br />

Hydraulic Design and External<br />

Infrastructure design (external<br />

process pipelines, raw <strong>water</strong><br />

delivery pipelines, potable and<br />

service <strong>water</strong> networks,<br />

sanitary sewer system, storm<br />

<strong>water</strong> system and synchrone<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 2 of 15<br />

25/03/2010<br />

plan).<br />

Preparation of Detailed Design<br />

for the WTP (Q=100 l/s)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!