28.11.2012 Views

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRINKING WATER SUPPLY<br />

Year<br />

2002<br />

Consultant(s) Client<br />

Energoprojekt<br />

Oprema / IWA<br />

Consalt<br />

2002 IWA Consalt<br />

2002 IWA Consalt<br />

2002 IWA Consalt<br />

2001<br />

2001<br />

Integral<br />

Inzenjering /<br />

IWA Consalt<br />

PM Lucas / IWA<br />

Consalt<br />

British American<br />

Tobacco (BAT)<br />

Soko Banja<br />

Waterworks<br />

Krusevac<br />

Waterworks<br />

Mladenovac<br />

Waterworks<br />

USAID<br />

Project<br />

Location<br />

IWA Consalt<br />

Service(s)<br />

Nigeria Detailed Design BAT cigarette factory<br />

Serbia<br />

Serbia<br />

Hydraulic<br />

Analysis<br />

Hydraulic<br />

Analysis<br />

Serbia Detailed Design<br />

Bosnia and<br />

Herzegovina<br />

PetroKazakhstan Kazakhstan<br />

Detailed Design<br />

Hydraulic<br />

Analysis<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Hydraulic analysis for the<br />

Soko Banja <strong>water</strong> supply<br />

Preparation of Detailed Design of<br />

external infrastructure<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 7 of 15<br />

25/03/2010<br />

system<br />

Surge analysis and <strong>water</strong><br />

hammer protection for PS<br />

Tekija 2<br />

New well for the<br />

Mladenovac <strong>water</strong> supply<br />

system<br />

Water supply system for a<br />

group of villages around<br />

the City of Brcko<br />

Water injection system for<br />

the Kumkol oilfield<br />

Development of hydraulic model and<br />

analysis of the Soko Banja <strong>water</strong><br />

supply system<br />

Surge analysis for the Tekija 2 Pumping<br />

Station<br />

Preparation of Detailed Design for a<br />

new well<br />

Preparation of Detailed Design for the<br />

<strong>water</strong> supply system Stjepkovica (Q=<br />

25 l/s)<br />

Preparation of a hydraulic analysis for a<br />

<strong>water</strong> injection system upgrade (110<br />

bars) for increased demand (from 100<br />

l/s to 350 l/s)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!