28.11.2012 Views

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STUDIES AND MASTER PLANS<br />

Year<br />

2007<br />

2003-<br />

2004<br />

2003<br />

Consultant(s) Client<br />

PM Lucas / IWA<br />

Consalt<br />

PECHER /<br />

Beoinzenjering /<br />

IWA Consalt<br />

PM Lucas / IWA<br />

Consalt<br />

KBM Joint Stock<br />

Company<br />

2001 IWA Consalt Gacko Waterworks<br />

Project<br />

Location<br />

IWA Consalt<br />

Service(s)<br />

Kazakhstan Feasibility Study<br />

City of Belgrade Serbia Feasibility Study<br />

PetroKazakhstan Kazakhstan Feasibility Study<br />

Bosnia and<br />

Herzegovina<br />

Master Plan<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Optimization of Feed Water<br />

Treatment Unit for PPG-3<br />

and PPG-4 Project<br />

Global Waste Water Study<br />

in Serbia &<br />

Pre-feasibility Study for<br />

Belgrade Waste Water<br />

Management<br />

Oil refinery waste<strong>water</strong><br />

<strong>treatment</strong> plant upgrade<br />

Master Plan for Water<br />

supply system for the City of<br />

Gacko<br />

Feasibility Study of extensions<br />

of mechanical <strong>water</strong> <strong>treatment</strong><br />

units for the Steam Generator<br />

Plants PPG-3 and PPG-4 at<br />

Karazhanabas Oil Field<br />

Preparation of the mentioned<br />

studies, funded by the EU<br />

CARDS programme. The<br />

main goal was to form a<br />

detailed overview of sewerage<br />

system conditions in Serbian<br />

municipalities based on<br />

collection and analysis of<br />

relevant data related to <strong>water</strong><br />

distribution/<strong>cons</strong>umption,<br />

demographics, waste <strong>water</strong><br />

<strong>treatment</strong>, etc.<br />

Preparation of a feasibility<br />

study for the WWTP (Q= 2 x<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 14 of 15<br />

25/03/2010<br />

220 l/s)<br />

Preparation of a Master Plan<br />

for the City of Gacko <strong>water</strong><br />

supply system

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!