project references drinking water treatment - Iwa-cons.com
project references drinking water treatment - Iwa-cons.com
project references drinking water treatment - Iwa-cons.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
STUDIES AND MASTER PLANS<br />
Year<br />
2007<br />
2003-<br />
2004<br />
2003<br />
Consultant(s) Client<br />
PM Lucas / IWA<br />
Consalt<br />
PECHER /<br />
Beoinzenjering /<br />
IWA Consalt<br />
PM Lucas / IWA<br />
Consalt<br />
KBM Joint Stock<br />
Company<br />
2001 IWA Consalt Gacko Waterworks<br />
Project<br />
Location<br />
IWA Consalt<br />
Service(s)<br />
Kazakhstan Feasibility Study<br />
City of Belgrade Serbia Feasibility Study<br />
PetroKazakhstan Kazakhstan Feasibility Study<br />
Bosnia and<br />
Herzegovina<br />
Master Plan<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Optimization of Feed Water<br />
Treatment Unit for PPG-3<br />
and PPG-4 Project<br />
Global Waste Water Study<br />
in Serbia &<br />
Pre-feasibility Study for<br />
Belgrade Waste Water<br />
Management<br />
Oil refinery waste<strong>water</strong><br />
<strong>treatment</strong> plant upgrade<br />
Master Plan for Water<br />
supply system for the City of<br />
Gacko<br />
Feasibility Study of extensions<br />
of mechanical <strong>water</strong> <strong>treatment</strong><br />
units for the Steam Generator<br />
Plants PPG-3 and PPG-4 at<br />
Karazhanabas Oil Field<br />
Preparation of the mentioned<br />
studies, funded by the EU<br />
CARDS programme. The<br />
main goal was to form a<br />
detailed overview of sewerage<br />
system conditions in Serbian<br />
municipalities based on<br />
collection and analysis of<br />
relevant data related to <strong>water</strong><br />
distribution/<strong>cons</strong>umption,<br />
demographics, waste <strong>water</strong><br />
<strong>treatment</strong>, etc.<br />
Preparation of a feasibility<br />
study for the WWTP (Q= 2 x<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 14 of 15<br />
25/03/2010<br />
220 l/s)<br />
Preparation of a Master Plan<br />
for the City of Gacko <strong>water</strong><br />
supply system