28.11.2012 Views

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

project references drinking water treatment - Iwa-cons.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WASTEWATER COLLECTION<br />

Year<br />

Consultant(s) Client<br />

2009 IWA Consalt<br />

2009 IWA Consalt<br />

2009<br />

Dahlem<br />

Engineering<br />

Company/ IWA<br />

Consalt<br />

UNDP/Municipality<br />

Nova Varoš<br />

UNDP/Municipality<br />

Prijepolje<br />

Project<br />

Location<br />

Nova Varoš,<br />

Serbia<br />

Prijepolje,<br />

Serbia<br />

IWA Consalt<br />

Service(s)<br />

Preliminary<br />

design with<br />

feasibility study<br />

Preliminary<br />

design with<br />

feasibility study<br />

Voda<strong>com</strong> Montenegro Detailed Design<br />

2009 IWA Consalt Waterworks Loznica Serbia<br />

2009<br />

IWA Consalt /<br />

Beoinzenjering<br />

United Nations<br />

Development<br />

Programme<br />

(UNDP PRO)<br />

Serbia<br />

Preliminary and<br />

Detail Design<br />

Preliminary<br />

Design and<br />

Feasibility<br />

Studies<br />

PROJECT REFERENCES<br />

Project Name Brief Description<br />

Preliminary design and<br />

feasibility study of main<br />

waste <strong>water</strong> collectors in<br />

the town of Nova Varoš<br />

Preliminary design and<br />

feasibility study of main<br />

waste <strong>water</strong> collectors in<br />

the town of Prijepolje<br />

Water Supply and<br />

Sanitation Adriatic Coast III<br />

- Bar<br />

Preliminary and Detail<br />

Designs of the pressure<br />

main from the existing<br />

pumping station to the<br />

future WWTP and<br />

rehabilitation of the existing<br />

pumping station<br />

Preliminary Designs with<br />

Feasibility Studies for the<br />

waste<strong>water</strong> systems of<br />

Prijepolje , Nova Varos,<br />

Tutin i Sjenica<br />

Preliminary design and<br />

feasibility study of main waste<br />

<strong>water</strong> collectors in the town of<br />

Nova Varoš<br />

Preliminary design and<br />

feasibility study of main waste<br />

<strong>water</strong> collectors in the town of<br />

Prijepolje<br />

Preparation of Detailed design<br />

of sanitary sewage system for<br />

the coastal town of Sutomore.<br />

Project is the part of KfW<br />

programme.<br />

Preparation of Preliminary and<br />

Detailed design of the 2.6 km<br />

long pressure main and<br />

rehabilitation of the existing<br />

pumping station (Qsanitary=<br />

200 l/s, Qstorm=1500 l/s)<br />

United Nations Development<br />

Program PRO Program -<br />

preparation of preliminary<br />

design and feasibility study for<br />

the waste<strong>water</strong> collection<br />

systems.<br />

* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 10 of 15<br />

25/03/2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!