project references drinking water treatment - Iwa-cons.com
project references drinking water treatment - Iwa-cons.com
project references drinking water treatment - Iwa-cons.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DRINKING WATER TREATMENT<br />
Year<br />
Consultant(s) Client<br />
2010 IWA Consalt GTZ<br />
2007-<br />
2008<br />
2007-<br />
2008<br />
2007<br />
2006-<br />
2007<br />
Tahal<br />
St.Petersburg /<br />
IWA Consalt<br />
Tahal<br />
St.Petersburg /<br />
IWA Consalt<br />
Energoprojekt /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Vodokanal<br />
St.Petersburg<br />
Vodokanal<br />
St.Petersburg<br />
Project<br />
Location<br />
Kladovo,<br />
Serbia<br />
Russia, St.<br />
Petersburg<br />
Russia, St.<br />
Petersburg<br />
IWA Consalt<br />
Service(s)<br />
Detailed Design<br />
Preliminary<br />
Design<br />
Preliminary and<br />
Detailed Design<br />
Belgrade Waterworks Serbia Technical Review<br />
BEATL / ECOU /<br />
AL AMARA<br />
Libya<br />
Project<br />
management,<br />
Detailed Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Detailed design of <strong>water</strong><br />
<strong>treatment</strong> plant and<br />
reservoir “Ljubičevac” with<br />
pump stations “Ljubičevac”<br />
and “Grabovica”<br />
Preliminary Design of<br />
Water Treatment Plant<br />
"Kolpinskaya"<br />
Preliminary and Detailed<br />
Design of Water Treatment<br />
Plant "Glavnaya"<br />
Re<strong>cons</strong>truction of “Bezanija<br />
III” Water Treatment Plant<br />
National Programme for<br />
Water Supply and<br />
Sewerage –<br />
Phase IV<br />
Hydro-mechanical,<br />
architectural, <strong>cons</strong>truction and<br />
electrical engineering Detail<br />
Design of <strong>water</strong> <strong>treatment</strong><br />
plant reservoir "Ljubičevac"<br />
withpump stations "Ljubičevac"<br />
and "Grabovica" with<br />
maximum capacity of 50 l / s<br />
Preparation of civil and<br />
mechanical parts of the<br />
Preliminary Design of WTP<br />
"Kolpinskaya (Q=500<br />
000 m3/day)<br />
Preparation of civil and<br />
mechanical parts of the Basic<br />
and Detailed Design of WTP<br />
"Glavnaya" (Q=500 000<br />
m3/day)<br />
Technical review of the<br />
Detailed Design for the<br />
Bezanija WTP (Q=1000 l/s)<br />
Hydraulic design of <strong>water</strong><br />
<strong>treatment</strong> facilities for 34 cities<br />
/ settlements within the Libyan<br />
municipalities of Sabha, Sirt,<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 1 of 15<br />
25/03/2010
DRINKING WATER TREATMENT<br />
Year<br />
2006<br />
2005<br />
2004<br />
Consultant(s) Client<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
TAHAL / IWA<br />
Consalt<br />
BEATL / ECOU /<br />
AL AMARA<br />
Project<br />
Location<br />
Libya<br />
BEATL / ECOU Libya<br />
Belgrade Waterworks /<br />
City of Belgrade<br />
2003 IWA Consalt Gacko Waterworks<br />
Serbia<br />
Bosnia and<br />
Herzegovina<br />
IWA Consalt<br />
Service(s)<br />
Project<br />
management,<br />
Preliminary<br />
Design, Site<br />
supervision<br />
Project<br />
management,<br />
Conceptual<br />
Design<br />
Design<br />
Coordination,<br />
Final Design<br />
Detailed Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phases II,III<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phase I<br />
Drinking Water Treatment<br />
Plant “Makis 2”<br />
Water Treatment Plant for<br />
the City of Gacko<br />
Wadi Al Hayat, and Wadi Al<br />
Shati.<br />
Tasks included preparation of<br />
existing status reports, as well<br />
as conceptual, preliminary and<br />
Detailed design.<br />
Preparation of hydraulic parts<br />
of the Final Design for the new<br />
WTP with Q=2 m 3 /s (5 m 3 /s<br />
total plant capacity), as part of<br />
a Design / Supply contract.<br />
Tasks included General<br />
Hydraulic Design and External<br />
Infrastructure design (external<br />
process pipelines, raw <strong>water</strong><br />
delivery pipelines, potable and<br />
service <strong>water</strong> networks,<br />
sanitary sewer system, storm<br />
<strong>water</strong> system and synchrone<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 2 of 15<br />
25/03/2010<br />
plan).<br />
Preparation of Detailed Design<br />
for the WTP (Q=100 l/s)
DRINKING WATER TREATMENT<br />
Year<br />
2003<br />
2002<br />
Consultant(s) Client<br />
UnionInvest / IWA<br />
Consalt<br />
Energoprojekt<br />
Oprema / IWA<br />
Consalt<br />
2002 IWA Consalt<br />
Sanski Most<br />
Waterworks<br />
British American<br />
Tobacco (BAT)<br />
Vrnjacka Banja<br />
Waterworks<br />
Project<br />
Location<br />
Bosnia and<br />
Herzegovina<br />
IWA Consalt<br />
Service(s)<br />
Detailed Design<br />
Nigeria Detailed Design<br />
Serbia<br />
Preliminary<br />
Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Water Treatment Plant for<br />
the City of Sanski Most<br />
Water Treatment Plant for a<br />
BAT cigarette factory<br />
Water Treatment Plant<br />
Rehabilitation and Upgrade<br />
Preparation of civil and<br />
mechanical parts of Detailed<br />
Design for the WTP (Q=250<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 3 of 15<br />
25/03/2010<br />
l/s)<br />
Preparation of Detailed Design<br />
for the WTP (<strong>drinking</strong> <strong>water</strong><br />
and service <strong>water</strong>)<br />
Preparation of Detailed Design<br />
of a WTP rehabilitation and<br />
upgrade (Q=40 l/s)
DRINKING WATER SUPPLY<br />
Year<br />
2010<br />
Consultant(s) Client<br />
SETEC<br />
engineering/IWA<br />
Consalt<br />
Kfw and<br />
municipality<br />
Pančevo<br />
Project<br />
Location<br />
Pančevo,<br />
Serbia<br />
IWA Consalt<br />
Service(s)<br />
Detailed design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Implementation of Phase<br />
2 of Water and Sewerage<br />
Programme in Medium<br />
Sized Municipalities in<br />
Serbia “Pancevo”<br />
- Network rehabilitation in Pančevo<br />
includes the replacement of ~6.6 km<br />
(around 40+years old) AC, Galvanized<br />
Cast Iron (CI) and PVC pipes with<br />
HDPE pipes (including hydrants and<br />
exchange of service connections)<br />
- Pipeline DN280 from Stari Tamis to<br />
Dolovo, Booster station for Dolovo 148<br />
m3/h, small booster station for<br />
settlement StariTamiš 25 m3/h, and<br />
550 m3 <strong>water</strong> tower in Dolovo. Review<br />
and Amendment of existing design<br />
from Pancevo until Stari Tamis<br />
- 5,000 m3 concrete reservoir, ground<br />
storage tankl, including mechanical and<br />
electrical equipment.<br />
- Construction of DN800 steel pipeline,<br />
~1.8 km long, including cathodic<br />
protection equipment and pressure<br />
control point in the City network<br />
- Construction of new 20 kV electric<br />
feeder, ~4 km long, XHE49A<br />
3x(1x150mm2), including<br />
re<strong>cons</strong>truction of electrical substation at<br />
the “old” WTP<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 4 of 15<br />
25/03/2010
DRINKING WATER SUPPLY<br />
Year<br />
2010<br />
Consultant(s) Client<br />
Delta<br />
inženjering/IWA<br />
Consalt<br />
2010 IWA Consalt<br />
2009 IWA Consalt<br />
Fiat automobili<br />
Srbija<br />
Municipality Šid and<br />
GTZ<br />
JP REGIONALNI<br />
VODOVOD<br />
CRNOGORSKO<br />
PRIMORJE<br />
2008 IWA Consalt Waterworks Loznica<br />
2008 IWA Consalt<br />
Waterworks “Izvor”<br />
Petrovac<br />
Project<br />
Location<br />
Kragujevac,<br />
Serbia<br />
Municipality<br />
Šid, Serbia<br />
Montenegro<br />
Loznica,<br />
Serbia<br />
Petrovac,<br />
Serbia<br />
IWA Consalt<br />
Service(s)<br />
Detailed design<br />
Detailed design<br />
Hydraulic<br />
analysis<br />
Preliminary and<br />
Detailed Design<br />
Preliminary and<br />
Detailed Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Building new and<br />
re<strong>cons</strong>truction of existing<br />
hydro-technical<br />
installations with<br />
supporting facilities<br />
Detail design of <strong>water</strong><br />
supply networks for<br />
villages: Molovin, Sot,<br />
Bikić Do i Privina glava<br />
Hydraulic analysis of<br />
steady state, quasisteady<br />
state and transient<br />
flows during exploitation<br />
of Regional <strong>water</strong><br />
supplying system for<br />
Montenegro coast.<br />
Re<strong>cons</strong>truction of the<br />
main delivery pipeline and<br />
central pumping station<br />
within the <strong>water</strong> supply<br />
system for City of Loznica<br />
Preliminary and Detailed<br />
Design of <strong>water</strong> reservoir<br />
and pumping station<br />
Detail design of sanitary, industrial,<br />
demineralised, technical, demineralised<br />
and fire fighting <strong>water</strong> installations and<br />
reservoir re<strong>cons</strong>truction<br />
Detail design of <strong>water</strong> supply networks<br />
for villages: Molovin, Sot, Bikić Do i<br />
Privina glava<br />
Hydraulic analysis of Regional <strong>water</strong><br />
supplying system for Montenegro coast<br />
with capacity of 1300 l/s in phase I and<br />
1700 l/s in phase II.<br />
Preparation of civil, structural and<br />
mechanical parts of the Preliminary and<br />
Detailed Design for the re<strong>cons</strong>truction<br />
of the central pumping station (Q=500<br />
l/s) and 8 km main delivery pipeline for<br />
the City of Loznica (population 43000)<br />
Preparation of civil, structural and<br />
mechanical parts of the Preliminary and<br />
Detailed Design of 1500 m3 <strong>water</strong><br />
reservoir and additional pumping<br />
station<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 5 of 15<br />
25/03/2010
DRINKING WATER SUPPLY<br />
Year<br />
Consultant(s) Client<br />
2008 IWA Consalt<br />
2008 IWA Consalt<br />
2006-<br />
2007<br />
2006<br />
2005<br />
2005<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
PM Lucas / IWA<br />
Consalt<br />
Waterworks<br />
Krusevac<br />
Waterworks<br />
Krusevac<br />
BEATL / ECOU /<br />
AL AMARA<br />
BEATL / ECOU /<br />
AL AMARA<br />
Project<br />
Location<br />
Krusevac,<br />
Serbia<br />
Krusevac,<br />
Serbia<br />
Libya<br />
Libya<br />
BEATL / ECOU Libya<br />
PetroKazakhstan Kazakhstan<br />
IWA Consalt<br />
Service(s)<br />
Preliminary<br />
Design<br />
Preliminary and<br />
Detailed Design<br />
Project<br />
management,<br />
Detailed Design<br />
Project<br />
management,<br />
Preliminary<br />
Design, Site<br />
supervision<br />
Project<br />
management,<br />
Conceptual<br />
Design<br />
Hydraulic<br />
modeling and<br />
Conceptual<br />
Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Control system analysis<br />
and design for the<br />
regional <strong>water</strong> system<br />
“Ćelije”<br />
Preliminary and Detailed<br />
Design of <strong>water</strong> reservoir<br />
National Programme for<br />
Water Supply and<br />
Sewerage –<br />
Phase IV<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phases II,III<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phase I<br />
Water injection system<br />
upgrade for the Kumkol<br />
oil field<br />
Control system analysis and design for<br />
the regional <strong>water</strong> system “Ćelije”<br />
Preparation of civil, structural and<br />
mechanical parts of the Preliminary and<br />
Detailed Design of 5000 m3 <strong>water</strong><br />
reservoir and adjacent pipes.<br />
The <strong>project</strong> involves hydraulic design of<br />
<strong>water</strong> supply (distribution/collection<br />
systems) for 34 cities / settlements<br />
within the Libyan municipalities of<br />
Sabha, Sirt, Wadi Al Hayat, and Wadi<br />
Al Shati.<br />
Development of a hydraulic model and<br />
preparation of Conceptual Design of<br />
the <strong>water</strong> injection system<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 6 of 15<br />
25/03/2010
DRINKING WATER SUPPLY<br />
Year<br />
2002<br />
Consultant(s) Client<br />
Energoprojekt<br />
Oprema / IWA<br />
Consalt<br />
2002 IWA Consalt<br />
2002 IWA Consalt<br />
2002 IWA Consalt<br />
2001<br />
2001<br />
Integral<br />
Inzenjering /<br />
IWA Consalt<br />
PM Lucas / IWA<br />
Consalt<br />
British American<br />
Tobacco (BAT)<br />
Soko Banja<br />
Waterworks<br />
Krusevac<br />
Waterworks<br />
Mladenovac<br />
Waterworks<br />
USAID<br />
Project<br />
Location<br />
IWA Consalt<br />
Service(s)<br />
Nigeria Detailed Design BAT cigarette factory<br />
Serbia<br />
Serbia<br />
Hydraulic<br />
Analysis<br />
Hydraulic<br />
Analysis<br />
Serbia Detailed Design<br />
Bosnia and<br />
Herzegovina<br />
PetroKazakhstan Kazakhstan<br />
Detailed Design<br />
Hydraulic<br />
Analysis<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Hydraulic analysis for the<br />
Soko Banja <strong>water</strong> supply<br />
Preparation of Detailed Design of<br />
external infrastructure<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 7 of 15<br />
25/03/2010<br />
system<br />
Surge analysis and <strong>water</strong><br />
hammer protection for PS<br />
Tekija 2<br />
New well for the<br />
Mladenovac <strong>water</strong> supply<br />
system<br />
Water supply system for a<br />
group of villages around<br />
the City of Brcko<br />
Water injection system for<br />
the Kumkol oilfield<br />
Development of hydraulic model and<br />
analysis of the Soko Banja <strong>water</strong><br />
supply system<br />
Surge analysis for the Tekija 2 Pumping<br />
Station<br />
Preparation of Detailed Design for a<br />
new well<br />
Preparation of Detailed Design for the<br />
<strong>water</strong> supply system Stjepkovica (Q=<br />
25 l/s)<br />
Preparation of a hydraulic analysis for a<br />
<strong>water</strong> injection system upgrade (110<br />
bars) for increased demand (from 100<br />
l/s to 350 l/s)
WASTEWATER TREATMENT<br />
Year<br />
2010<br />
2007<br />
2007<br />
Consultant(s) Client<br />
Tahal/IWA<br />
Consalt<br />
DHV Water / IWA<br />
Consalt / FIDECO<br />
DHV Water / IWA<br />
Consalt / FIDECO<br />
Vodokanal<br />
St. Petersburg<br />
Project<br />
Location<br />
St. Petersburg,<br />
Russia<br />
IWA Consalt<br />
Service(s)<br />
Hydraulic<br />
modelling<br />
analysis<br />
Subotica Waterworks Serbia Detailed Design<br />
Podgorica Waterworks Montenegro Detailed Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Hydraulic modelling<br />
analysis for the waste<strong>water</strong><br />
<strong>treatment</strong> facility<br />
“Central aeration plant of<br />
St. Petersburg”<br />
Extension and<br />
Re<strong>cons</strong>truction of the<br />
Waste Water Treatment<br />
Plant for the City of<br />
Subotica<br />
Re<strong>cons</strong>truction and<br />
Rehabilitation of the Waste<br />
Water Treatment Plant for<br />
the City of Podgorica<br />
Development of hydraulic<br />
model of the WWTP "White<br />
Island" maximum capacity<br />
30m 3 /s with SWMM software<br />
package.<br />
Preparation of civil, structural<br />
and mechanical parts of the<br />
Detailed Design, of new WWT<br />
facilities (150,000 population<br />
equivalent, maximum flow of<br />
6900 m 3 /h).<br />
IWA’s scope included the<br />
General Hydraulic Design as<br />
well as design of the following<br />
facilities: primary and final<br />
sedimentation tanks, aeration<br />
tanks, division boxes.<br />
Preparation of civil and<br />
structural parts of the Detailed<br />
Design.The <strong>project</strong> <strong>cons</strong>ists of<br />
renewal of hydro-mechanical<br />
equipment, implementation of<br />
a higher level of system<br />
monitoring and improvements<br />
on the sludge line.<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 8 of 15<br />
25/03/2010
WASTEWATER TREATMENT<br />
Year<br />
2006-<br />
2007<br />
2006<br />
2005<br />
2002<br />
Consultant(s) Client<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Energoprojekt<br />
Oprema / IWA<br />
Consalt<br />
BEATL / ECOU /<br />
AL AMARA<br />
BEATL / ECOU /<br />
AL AMARA<br />
Project<br />
Location<br />
Libya<br />
Libya<br />
BEATL / ECOU Libya<br />
British American<br />
Tobacco (BAT)<br />
IWA Consalt<br />
Service(s)<br />
Project<br />
management,<br />
Detailed Design<br />
Project<br />
management,<br />
Preliminary<br />
Design, Site<br />
supervision<br />
Project<br />
management,<br />
Conceptual<br />
Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
National Programme for<br />
Water Supply and<br />
Sewerage –<br />
Phase IV<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phases II,III<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phase I<br />
Nigeria Detailed Design BAT cigarette factory<br />
Hydraulic design of<br />
waste<strong>water</strong> <strong>treatment</strong> facilities<br />
for 34 cities / settlements<br />
within the Libyan municipalities<br />
of Sabha, Sirt, Wadi Al Hayat,<br />
and Wadi Al Shati.<br />
Preparation of Detailed Design<br />
of WWT<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 9 of 15<br />
25/03/2010
WASTEWATER COLLECTION<br />
Year<br />
Consultant(s) Client<br />
2009 IWA Consalt<br />
2009 IWA Consalt<br />
2009<br />
Dahlem<br />
Engineering<br />
Company/ IWA<br />
Consalt<br />
UNDP/Municipality<br />
Nova Varoš<br />
UNDP/Municipality<br />
Prijepolje<br />
Project<br />
Location<br />
Nova Varoš,<br />
Serbia<br />
Prijepolje,<br />
Serbia<br />
IWA Consalt<br />
Service(s)<br />
Preliminary<br />
design with<br />
feasibility study<br />
Preliminary<br />
design with<br />
feasibility study<br />
Voda<strong>com</strong> Montenegro Detailed Design<br />
2009 IWA Consalt Waterworks Loznica Serbia<br />
2009<br />
IWA Consalt /<br />
Beoinzenjering<br />
United Nations<br />
Development<br />
Programme<br />
(UNDP PRO)<br />
Serbia<br />
Preliminary and<br />
Detail Design<br />
Preliminary<br />
Design and<br />
Feasibility<br />
Studies<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Preliminary design and<br />
feasibility study of main<br />
waste <strong>water</strong> collectors in<br />
the town of Nova Varoš<br />
Preliminary design and<br />
feasibility study of main<br />
waste <strong>water</strong> collectors in<br />
the town of Prijepolje<br />
Water Supply and<br />
Sanitation Adriatic Coast III<br />
- Bar<br />
Preliminary and Detail<br />
Designs of the pressure<br />
main from the existing<br />
pumping station to the<br />
future WWTP and<br />
rehabilitation of the existing<br />
pumping station<br />
Preliminary Designs with<br />
Feasibility Studies for the<br />
waste<strong>water</strong> systems of<br />
Prijepolje , Nova Varos,<br />
Tutin i Sjenica<br />
Preliminary design and<br />
feasibility study of main waste<br />
<strong>water</strong> collectors in the town of<br />
Nova Varoš<br />
Preliminary design and<br />
feasibility study of main waste<br />
<strong>water</strong> collectors in the town of<br />
Prijepolje<br />
Preparation of Detailed design<br />
of sanitary sewage system for<br />
the coastal town of Sutomore.<br />
Project is the part of KfW<br />
programme.<br />
Preparation of Preliminary and<br />
Detailed design of the 2.6 km<br />
long pressure main and<br />
rehabilitation of the existing<br />
pumping station (Qsanitary=<br />
200 l/s, Qstorm=1500 l/s)<br />
United Nations Development<br />
Program PRO Program -<br />
preparation of preliminary<br />
design and feasibility study for<br />
the waste<strong>water</strong> collection<br />
systems.<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 10 of 15<br />
25/03/2010
WASTEWATER COLLECTION<br />
Year<br />
Consultant(s) Client<br />
Project<br />
Location<br />
2008 IWA Consalt Waterworks Zrenjanin Serbia<br />
2008<br />
2006-<br />
2007<br />
2006<br />
2005<br />
Beoinzenjering /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
Meridian<strong>project</strong> /<br />
IWA Consalt<br />
IWA Consalt<br />
Service(s)<br />
Preliminary and<br />
Detailed Design<br />
Bar Waterworks Montenegro Detailed Design<br />
BEATL / ECOU /<br />
AL AMARA<br />
BEATL / ECOU /<br />
AL AMARA<br />
Libya<br />
Libya<br />
BEATL / ECOU Libya<br />
Project<br />
management,<br />
Detailed Design<br />
Project<br />
management,<br />
Preliminary<br />
Design, Site<br />
supervision<br />
Project<br />
management,<br />
Conceptual<br />
Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Preliminary and Detailed<br />
Design of sewage pumping<br />
station “Centar” and part of<br />
the sewage system in<br />
Zrenjanin<br />
Detailed design of sewage<br />
system in Sutomore<br />
National Programme for<br />
Water Supply and<br />
Sewerage –<br />
Phase IV<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phases II,III<br />
National Programme for<br />
Water Supply and<br />
Sewerage – Phase I<br />
Preparation of the civil,<br />
structural and mechanical<br />
parts of the Preliminary and<br />
Detailed Design of central<br />
sewage pumping station ,<br />
force main , and gravity sewer<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 11 of 15<br />
25/03/2010<br />
system<br />
Preparation of Detailed design<br />
for the Mirosica, Maljevik i<br />
Zagradje areas within the<br />
sanitary sewage system of the<br />
coastal town of Sutomore<br />
Hydraulic design of sewerage<br />
systems (distribution/collection<br />
systems) for 34 cities /<br />
settlements within the Libyan<br />
municipalities of Sabha, Sirt,<br />
Wadi Al Hayat, and Wadi Al<br />
Shati.<br />
Tasks included preparation of<br />
existing status reports, as well<br />
as conceptual, preliminary and<br />
Detailed design of sewage<br />
collection systems for<br />
settlements within the<br />
mentioned municipalities.
WASTEWATER COLLECTION<br />
Year<br />
2005<br />
2005<br />
2002<br />
Consultant(s) Client<br />
CDM / IWA<br />
Consalt<br />
Beoinzenjering /<br />
IWA Consalt<br />
Energoprojekt<br />
Oprema / IWA<br />
Consalt<br />
Project<br />
Location<br />
USAID Montenegro<br />
Bar Waterworks Montenegro<br />
British American<br />
Tobacco (BAT)<br />
IWA Consalt<br />
Service(s)<br />
Project<br />
management,<br />
Detailed Design<br />
Project<br />
management,<br />
Conceptual<br />
Design<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Rehabilitation of three<br />
coastal Waste Water<br />
Pumping Stations in Budva<br />
Conceptual Design for<br />
sewage system in<br />
Sutomore<br />
Nigeria Detailed Design BAT cigarette factory<br />
Preparation of Detailed design<br />
(civil, structural, mechanical,<br />
electrical) for three waste<strong>water</strong><br />
pumping stations (PS Old<br />
town, Q=20 l/s ; PS Budva 1,<br />
Q=90 l/s and PS Budva 2,<br />
Q=200 l/s)<br />
Preparation of the Conceptual<br />
design for the sanitary sewage<br />
system of the coastal town of<br />
Sutomore (population 20,000)<br />
Preparation of Detailed Design<br />
of external infrastructure<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 12 of 15<br />
25/03/2010
STORMWATER COLLECTION<br />
Year<br />
Consultant(s) Client<br />
Project<br />
Location<br />
2008 IWA Consalt Waterworks Zrenjanin Serbia<br />
2007 IWA Consalt<br />
Zrenjanin Land<br />
Development Public<br />
Agency<br />
STUDIES AND MASTER PLANS<br />
Year<br />
Consultant(s) Client<br />
Serbia<br />
Project<br />
Location<br />
IWA Consalt<br />
Service(s)<br />
Preliminary and<br />
Detailed Design<br />
Preliminary and<br />
Detailed Design<br />
IWA Consalt<br />
Service(s)<br />
2008 IWA Consalt Waterworks Subotica Serbia Study<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Preliminary and Detailed<br />
Design of storm <strong>water</strong><br />
sewers in Skreliceva and<br />
Kralja Petra streets in<br />
Zrenjanin<br />
Storm <strong>water</strong> system for<br />
southeast Industrial zone -<br />
City of Zrenjanin<br />
Preparation of the civil,<br />
structural and mechanical<br />
parts of the Preliminary and<br />
Detailed Design of central<br />
sewage pumping station ,<br />
force main , and gravity sewer<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 13 of 15<br />
25/03/2010<br />
system<br />
Preparation of civil, structural<br />
and mechanical parts of the<br />
Preliminary and Detailed<br />
Design of storm <strong>water</strong> system<br />
with a total catchment area of<br />
55 ha, and storm <strong>water</strong><br />
pumping Station<br />
Project Name Brief Description<br />
Study of sewage and storm<br />
system for sections VII and<br />
VIII of Subotica<br />
Study included hydraulic<br />
analyses of separate and<br />
<strong>com</strong>bined systems
STUDIES AND MASTER PLANS<br />
Year<br />
2007<br />
2003-<br />
2004<br />
2003<br />
Consultant(s) Client<br />
PM Lucas / IWA<br />
Consalt<br />
PECHER /<br />
Beoinzenjering /<br />
IWA Consalt<br />
PM Lucas / IWA<br />
Consalt<br />
KBM Joint Stock<br />
Company<br />
2001 IWA Consalt Gacko Waterworks<br />
Project<br />
Location<br />
IWA Consalt<br />
Service(s)<br />
Kazakhstan Feasibility Study<br />
City of Belgrade Serbia Feasibility Study<br />
PetroKazakhstan Kazakhstan Feasibility Study<br />
Bosnia and<br />
Herzegovina<br />
Master Plan<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Optimization of Feed Water<br />
Treatment Unit for PPG-3<br />
and PPG-4 Project<br />
Global Waste Water Study<br />
in Serbia &<br />
Pre-feasibility Study for<br />
Belgrade Waste Water<br />
Management<br />
Oil refinery waste<strong>water</strong><br />
<strong>treatment</strong> plant upgrade<br />
Master Plan for Water<br />
supply system for the City of<br />
Gacko<br />
Feasibility Study of extensions<br />
of mechanical <strong>water</strong> <strong>treatment</strong><br />
units for the Steam Generator<br />
Plants PPG-3 and PPG-4 at<br />
Karazhanabas Oil Field<br />
Preparation of the mentioned<br />
studies, funded by the EU<br />
CARDS programme. The<br />
main goal was to form a<br />
detailed overview of sewerage<br />
system conditions in Serbian<br />
municipalities based on<br />
collection and analysis of<br />
relevant data related to <strong>water</strong><br />
distribution/<strong>cons</strong>umption,<br />
demographics, waste <strong>water</strong><br />
<strong>treatment</strong>, etc.<br />
Preparation of a feasibility<br />
study for the WWTP (Q= 2 x<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 14 of 15<br />
25/03/2010<br />
220 l/s)<br />
Preparation of a Master Plan<br />
for the City of Gacko <strong>water</strong><br />
supply system
SOLID WASTE<br />
Year<br />
Consultant(s) Client<br />
Project<br />
Location<br />
IWA Consalt<br />
Service(s)<br />
2009 IWA Consalt KJP Naš Dom Serbia Detailed Design<br />
OTHER CONSULTING SERVICES<br />
Year<br />
Consultant(s) Client<br />
2008 IWA Consalt<br />
Ministry for<br />
Agriculture, Forestry<br />
and Water<br />
Management<br />
Project<br />
Location<br />
2007 IWA Consalt “POLIESTER”, Priboj Serbia<br />
IWA Consalt<br />
Service(s)<br />
Serbia Consulting<br />
Software<br />
Development<br />
PROJECT REFERENCES<br />
Project Name Brief Description<br />
Rehabilitation and<br />
sanitation of the landfill for<br />
the city of Loznica<br />
Preparation of Detailed design<br />
of rehabilitation and sanitation<br />
of the municipal and city<br />
landfill of Loznica (population<br />
86,000).<br />
Project Name Brief Description<br />
DREPR (Serbia Danube<br />
River Enterprise Pollution<br />
Reduction Project)<br />
Company Product<br />
Catalogue and Hydraulic<br />
Calculator<br />
Site visits and review of<br />
Preliminary, Detailed Design<br />
and Tender documentation.<br />
Facilities included storage<br />
tanks for slurry, channels and<br />
reception pits.<br />
Development of a software<br />
package including the<br />
<strong>com</strong>pany’s product line<br />
(polyester pipes, fitting, etc)<br />
and a hydraulic calculator.<br />
* Please refer to individual CVs for additional employee <strong>project</strong> experience Page 15 of 15<br />
25/03/2010