Sample calculation <strong>for</strong> energy and cost savings <strong>for</strong> SCADA control:(Attachment-2)Project#LS #kWhConsumption<strong>for</strong> CurrentRun Times/yrEnergyCost/yrExcessive kWhConsumption/yrkWhConsumption/yrafter SCADAEnergyCost/yrCostSavingsEnergySavingsEligibleCostsE1 20 111,521$104,829.747,806 103,715$97,491.66$7,338.087% $4,500.00EfficiencyCalc:E4 48 50,093$47,087.421,503 48,590$45,674.80$1,412.623% $4,500.00Sub 182 3,335$3,134.90200 3,135$2,946.81$188.096% $4,500.00(Total RunHours ‐Excess RunHours)/TotalRun Hours109 35,292$33,174.48706 34,586$32,510.99$663.492% $4,500.00Sub 4 17 4,792$4,504.48144 4,648$4,369.35$135.133% $4,500.00Sub 5 27 15,570$14,635.801,246 14,324$13,464.94$1,170.868% $4,500.00Sub 6 64 170,718$160,474.928,536 162,182$152,451.17$8,023.755% $4,500.00Sub 8 8 113,280$106,483.203,398 109,882$103,288.70$3,194.503% $4,500.0049 24,749$23,264.06990 23,759$22,333.50$930.564% $4,500.00Sub 961 27,59474 6,693$25,938.36$6,291.421,656 25,93867 6,626$24,382.06$6,228.51$1,556.30$62.916% $4,500.001% $4,500.0076 27,213$25,580.22816 26,397$24,812.81$767.413% $4,500.00Sub 9b 68 39,127$36,779.382,739 36,388$34,204.82$2,574.567% $4,500.0034 18,015$16,934.101,081 16,934$15,918.05$1,016.056% $4,500.00Sub 1136 19,590$18,414.601,763 17,827$16,757.29$1,657.319% $4,500.0042 12,440$11,693.60871 11,569$10,875.05$818.557% $4,500.00
System‐WideTOTALS680,022$639,220.6847,602 632,420$607,710.50$31,510.187% $72,000.00LS #TotalRunHoursExcess RunHours% Excess20 7708 572.1 7%48 4645 154 3%82 1967.8 119 6%109 4961.5 78 2%NOTES:17 584.3 15.9 3%27 2574.8 207.5 8%64 4984.2 234.2 5%8 3022.4 87.1 3%49 4419.6 173.1 4%61 3986.9 229.4 6%74 790.6 6.4 1%76 5407.5 169.6 3%68 2923.1 211.9 7%34 6837.3 411.8 6%36 4058.2 356.2 9%42 4069.2 283.5 7%Project specs call <strong>for</strong> SCADA units to consist<strong>of</strong>:Siemens Intralink LC150 (orsimilar)MDS iNET900 Data TransmissionUnitEstimate cost per SCADA unit = $4,500 per correspondencefrom local Distributor(Municipal Pump & Control)