Wheel of Fortune Pusher
Wheel of Fortune Pusher
Wheel of Fortune Pusher
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7.0. Routine MaintenanceDaily InspectionIt is recommended that the following checks are carried out daily:i. Switch the machine on.ii. Visually check that the machine is clean inside and out and that all lamps areworking.iii. Visually check that there are no coins jammed in the Coin Entry.iv. Check that the playfield is correctly set-up with coins. Do not attempt tochange a playfield which has already been set up.See Next Page for Details <strong>of</strong> routine maintenanceWARNING:1) MAINTENANCE AND REPAIR WORK SHOULD ONLYBE CARRIED OUT BY SUITABLY SKILLED ANDTRAINED PERSONS.2) SWITCH OFF AND DISCONNECT ELECTRICALPOWER SUPPLY BEFORE WORKING ON THEMACHINE. NOTE THAT MAINS SUPPLY VOLTAGESARE USED BEHIND THE COIN ENTRY, THE PAYOUTAND REAR SERVICE DOORS.CAUTION:1) When touching any PCBs or their component parts, takefull anti-static precautions at all times, or else electroniccomponents may be damaged.2) Note the orientation <strong>of</strong> all PCBs and their connectors beforeremoval, to ensure correct reconnection.3) After installation or assembly, test any affected parts forcorrect function before use.920847 <strong>Wheel</strong> Of <strong>Fortune</strong> 18