) All documents related to engineering, tendering, ordering, manufacturing,<br />

delivery, construction, commissioning.<br />

c) Stage wise recommendations<br />

d) Design basis, Data sheets, P& IDs, Engineering Drawings<br />

e) Project Cost reports<br />

f) Various types <strong>of</strong> Plan, Manuals including Risk & Disaster Management<br />

Plan<br />

g) Documentation for OISD compliance<br />

h) Performance Evaluation Reports <strong>of</strong> vendors / <strong>contract</strong>ors<br />

i) Project Close out reports<br />

j) Any type <strong>of</strong> report required for obtaining Statutory permissions by the<br />

authorities.<br />

k) Any other deliverable not mentioned here but required elsewhere in<br />

tender.<br />

Both hard <strong>and</strong> editable s<strong>of</strong>t copies to be provided.<br />

Time Schedule:<br />

The <strong>contract</strong>ual time frame <strong>of</strong> completion <strong>of</strong> total Fire water up gradation job<br />

for the PMC shall be 15 months from the date <strong>of</strong> FOI.<br />

Note: (i)PMC is required to commission the project within 12 months from the<br />

date <strong>of</strong> FOI <strong>and</strong> close out all the project activities/<strong>contract</strong>s within next 3<br />

months. PMC is required to put manpower <strong>and</strong> resources accordingly. PMC is<br />

required to <strong>work</strong> simultaneously in various procurement/<strong>work</strong> packages <strong>and</strong><br />

make strong efforts to complete the project on or before the targeted date <strong>of</strong><br />

commissioning.<br />

(ii) The modifications to be carried such that the plant will be on running<br />

condition to the extent possible.