28.11.2012 Views

scope of work and special conditions of contract(scc) - GAIL

scope of work and special conditions of contract(scc) - GAIL

scope of work and special conditions of contract(scc) - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

effect, without assigning any reasons whatsoever. The <strong>contract</strong> shall be<br />

deemed to have expired on expiry <strong>of</strong> the original period unless extended.<br />

B) SUMMARY OF TERMINATION OF CONTRACT DUE TO SUBMISSION OF FALSE<br />

DOCUMENTS:<br />

Bidders are required to furnish the complete <strong>and</strong> correct information /<br />

documents required for evaluation <strong>of</strong> their bids. If the information /<br />

documents forming basis <strong>of</strong> evaluation is found to be false/forged, the same<br />

shall be considered adequate group for rejection <strong>of</strong> the Bids <strong>and</strong> forfeiture <strong>of</strong><br />

Earnest Money Deposit( EMD not applicable for this <strong>contract</strong>).<br />

In case, the information/documents furnished by the <strong>contract</strong>or forming basis<br />

<strong>of</strong> evaluation <strong>of</strong> his bid is found to be false/forged after the award <strong>of</strong> the<br />

<strong>contract</strong>, <strong>GAIL</strong> shall have full right to terminate the <strong>contract</strong> immediate <strong>and</strong> get<br />

the remaining job executed at the risk & cost <strong>of</strong> such <strong>contract</strong>or without any<br />

prejudice to the other rights available to <strong>GAIL</strong> under the <strong>contract</strong> such as<br />

forfeiture <strong>of</strong> Security Deposits, withholding <strong>of</strong> payments etc.<br />

In the case the issue <strong>of</strong> submission <strong>of</strong> false document comes to the notice after<br />

execution <strong>of</strong> the <strong>work</strong>, <strong>GAIL</strong> shall have full right to forfeit any amount due to<br />

the <strong>contract</strong>or along with forfeiture <strong>of</strong> Security Deposit furnished by the<br />

<strong>contract</strong>or. Further, such <strong>contract</strong>or/bidder shall be blacklisted for future<br />

business with <strong>GAIL</strong>.<br />

XI. ABNORMALLY HIGH RATED ITEMS (AHR ITEMS):<br />

In items rate <strong>contract</strong> where the quoted rates for the items exceed 50% <strong>of</strong> the<br />

owners/estimated rates, such items will be considered as Abnormally High<br />

Rates Items (AHR) <strong>and</strong> payment <strong>of</strong> AHR items beyond the SOR stipulated<br />

quantities shall be made at the least <strong>of</strong> the following rates:<br />

(I) Rates as per SOR, quoted by the <strong>contract</strong>or.<br />

(II) Rate <strong>of</strong> the item, which shall be derived as follows:<br />

Based on rates <strong>of</strong> machine <strong>and</strong> labour as available from the <strong>contract</strong> (which<br />

includes <strong>contract</strong>or's supervision, pr<strong>of</strong>it, overheads <strong>and</strong> other expenses).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!