12.07.2015 Views

GoldLine - Elterm

GoldLine - Elterm

GoldLine - Elterm

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12SETTINGSAd. A4. „SETTINGS – PID-P” – proportional integral derivative controller- press 1 time, SETTINGS sign appears- press 2 times, PID-P sign appears(to enter press three times button on the right- press another time, PID-P function is visible- change parameter- change parameter’s valueATTENTION:In case boiler needs long time to achieve set temperature - set 4 or 5In case boiler reaches set temperature to quickly – set 1 or 2)ad. A4SETTINGSENERGY CONSUM.VENTINGPOWERSECTIONSDATE & TIMEPID-PCH HISTERESE6612- „BACK” (given parameters are set)Multiple press enables getting back to main menuPID-PDEFAULT: 2Ad. A5. „SETTINGS – CH HISTERESE”- press 1 time, SETTING sign appears- press 2 times, CH HISTERESE sign appears(to enter press four times button on the right)ad. A5SETTINGSENERGY CONSUM.VENTING- press another time, below screen is visibleCH HISTERESE- decrease histerese 1 – 2 – 3 – 4 - 5- increase histerese 2 – 3 – 4 – 5 – 6- „BACK” (given parameters are set)Multiple press enables getting back to main menu6 POWERSECTIONSDATE & TIMEPID-PCH HISTERESECH HISTERESE6612DEFAULT: 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!