12.07.2015 Views

Bundalong - Moira Shire Council

Bundalong - Moira Shire Council

Bundalong - Moira Shire Council

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A Yarrawonga Foreshore - River Road– Retain and upgrade the existing boat ramp and car parking facilities at the corner of Bank and Ely Street.– Implement erosion control measures, through both soft and hard engineering options, where appropriate along the foreshore.– Maintain the existing willows along the foreshore until an appropriate alternative is found. Trim or remove any willows that are identified as a safety hazard or are dead.– Upgrade the shared pathway along River Road to ensure it is accessible to all and includes seating and rubbish bins.Short term boat tie-upfacilitiesBANKSTREETConsider renovating the stone buildingas a public toilet facilityRetain existing boat ramp. Implement trafficstudy to resolve boat landing manoeuvres,parking facilities and general pedestrianand vehicular circulation.MurrayExistingcar andtrailer parkConsider upgrading theexisting hard engineering edgeto incorporate a pedestrianpromenade and to addressaesthetic valuesMaintain the existing willows alongthe foreshore until an appropriatealternative is found. Willows identifiedas dead or presenting a safety hazardwill need to be trimmed or removed. Asoft engineered edge treatment withindigenous/native planting should beconsidered to replace any willowsremoved.Implement a combination of softengineered edge treatment along theforeshore to control erosion.RiverUpgrade shared pathway toprovide access for all, includingseating and rubbish containers.Explore opportunities toimplement landscape elementsand lighting as part of a featureboulevard.HUNT STREETRIVER ROADELY STREETWOODS ROADLEGENDGrass land and publicly accessible areasShrub planting areasRecreation facilities (tables, seats, etc)Proposed shared pathThis plan is intended to be a guide for the development of thisarea and it is intended that all proposed works will be subject toappropriate approval processes and detailed design studies.Page 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!