12.07.2015 Views

Bundalong - Moira Shire Council

Bundalong - Moira Shire Council

Bundalong - Moira Shire Council

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

––Upgrade of boat ramps and jetties<strong>Bundalong</strong> Area– Pyke Street<strong>Moira</strong> <strong>Shire</strong> <strong>Council</strong>, Goulburn Murray- Water andMarine Safety Victoria–• Prepare a design layout for an upgraded boat launching facility• Construction of a new boat launching ramp, jetty, parking facilitiesand landscape (Costs depend on approved design)Pasley StreetHighHigh2008 - 20132008 - 2013$30,000to be determined<strong>Moira</strong> <strong>Shire</strong> <strong>Council</strong>, Goulburn Murray- Water andMarine Safety Victoria<strong>Moira</strong> <strong>Shire</strong> <strong>Council</strong>, Goulburn Murray- Water andMarine Safety Victoria–• Prepare design layout for an upgrade to the boat ramp and surrounding facilities• Construction of new boat launching ramp, jetty, parking facilities, improvedpicnic area and landscape (Costs depend on approved design)Yarrawonga AreaHighHigh2008 - 20132013 - 2020$30,000to be determined<strong>Moira</strong> <strong>Shire</strong> <strong>Council</strong>, Goulburn Murray- Water andMarine Safety Victoria<strong>Moira</strong> <strong>Shire</strong> <strong>Council</strong>, Goulburn Murray- Water andMarine Safety Victoria–Bank St / Ely Street• Undertake a traffic study to resolve boat launching manoeuvres, parking facilitiesand general pedestrian and vehicular circulation. Based on this study, preparea design layout for an upgrade to the boat ramp and parking facilitiesMedium2013 - 2020$40,000• Construction of new car and trailer parking facilities (Costs depend on approved design)Medium2013 - 2020to be determined–Yacht Club• Prepare a design layout for an upgrade to the boatramp and surrounding parking facilitiesMedium2013 - 2020$20,000• Construction of a new boat launching ramp, parking facilitiesand landscape (Costs depend on approved design)Medium2013 - 2020to be determined–Botts Road• Prepare a design layout for a new boat launching ramp and parking facilitiesMedium2013 - 2020$30,000• Construction of a new boat launching ramp, jetty, parking facilitiesand landscape (Costs depend on approved design)Medium2013 - 2020to be determinedACTION PRIORITY TIME FRAME ESTIMATED COSTS FUNDING SOURCESPage 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!