12.07.2015 Views

Patrick Gordon, Director Jennifer C. Gerbasi, Recovery Planner

Patrick Gordon, Director Jennifer C. Gerbasi, Recovery Planner

Patrick Gordon, Director Jennifer C. Gerbasi, Recovery Planner

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

All new subdivisions isions and commercialbuilding permits must comply with theSDDMRequire “0” runoff from pre‐ to post‐constructionSubdivisions must be elevated to“tail water” elevation of the forceddrainage systemTail water elevation is the 25 year flood stageof an individual forced drainage system25 year tail water elevation can be higherthan the FEMA Base Flood Elevations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!