- 21 ­(viii) Pipe lengths should never be deflected in the joint to any greater degreethan recommended by the manufacturer.(ix)(x)(xi)Pipe should have adequate support along their whole length or should bebedded, haunched or surrounded with concrete as per StandardDrawing WSD 1.1. The use of timber or other means to save formingsocket holes must not be permitted. All objects on or in the surface onwhich the pipe is to be laid which may cause damage to the pipe shouldbe removed.Pipelaying should follow closely upon the progress of trench excavation.All necessary precautions should be taken to prevent floatation of pipes.(xii) For pipelaying near deep sump gullies, it is necessary to ensure thatthere is adequate clearance between the pipeline and the drainageconnection. See Appendix 3.1 and HyD’s Technical Circular No. 3/90for details of the restricted zone around deep sump gullies.(xiii) When handling asbestos cement pipes, special precautionary measuresmust be taken in accordance with “Asbestos Work Manual forMaintenance of Asbestos Cement Water Pipes” regarding their cuttingand disposal.(xiv) For pipelaying in a new bridge the pipes should be located in a troughaccessible from above or supported on concrete/steel works cantileveredfrom the side of the bridge.(xv) When handling polyethylene pipes, special precautionary measuresshould be taken in accordance with “Design Guide for PolyethylenePipelines for Water Supply Purpose”.(xvi) When laying pipes in reclaimed areas or at locations that are susceptibleto differential settlement, special attention should be given to positionappropriate and sufficient flexible joints to prevent leakage or even pipeburst due to uneven settlement. Surrounding the pipes with concreteunder this condition must only be made with extreme care especially forsteel pipe with welded joints. In the event that ground settlement hasinduced sufficient stress to open up the welded joints, the surroundingconcrete will become an obstacle to the repair operation.3.6 Thrust BlocksThrust blocks prevent pipes from being moved by forces exerted within the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!