12.07.2015 Views

Working Group Report on - Haryana Kisan Ayog

Working Group Report on - Haryana Kisan Ayog

Working Group Report on - Haryana Kisan Ayog

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Linkages with Development DepartmentsFisheries resources are primarily agricultural resources in <strong>Haryana</strong>, be it villagep<strong>on</strong>ds, canals and waterlogged areas, or saline soils. Agriculture Department hasstrengthened its Extensi<strong>on</strong> Network by inducting 143 new ADOs during 2010-11with 2 M<strong>on</strong>ths’ mandatory training, and has been strengthening electr<strong>on</strong>ic and printmedia like distributing the m<strong>on</strong>thly magazine Krishi Samvad free of cost in allvillages of the State. It is not known whether any functi<strong>on</strong>al linkages / collaborati<strong>on</strong>exist between Fisheries and Agriculture Departments as some of their functi<strong>on</strong>s andareas overlap while both target often the same group of farmers.Similarly, under Nati<strong>on</strong>al Horticulture Missi<strong>on</strong>, besides increasing area underhorticulture crops and productivity, <strong>Haryana</strong> claims to have created/c<strong>on</strong>structed1886 water p<strong>on</strong>ds covering a total catchment area of approx. 7,000 ha ensuring100% plant survivability (<strong>Haryana</strong> Annual plan 2010-11). However, these waterresources have not been c<strong>on</strong>sidered as a potential resource for fish farming. It wasevident during the c<strong>on</strong>sultative meetings that some of the KVKs are keen to utilisethese resources for fish culture.Budget Support and Utilisati<strong>on</strong>Started with a paltry Rs.3.15 lakh n<strong>on</strong>-plan <strong>on</strong>ly budget in 1966, the total DoFbudget has reached a whopping Rs. 9,040 lakhs during XI Plan (2007-12), anincrease of 2.7 times from IX Plan (1997-2002).Table 2.8 Budget allocati<strong>on</strong> and expenditure during IX, X & XI Plan PeriodsPlanPeriodsIX FYPX FYPXI FYP(2007-11)% increaseIX to XI FYP(annualised)Budget Allocati<strong>on</strong> (Lakhs) Expenditure (Lakhs) % Utilizati<strong>on</strong>Plan137326453010N<strong>on</strong>-Plan1428(35%)1849(33%)5308(59%)274% 465%C.S.S. Total Plan1343105872267%414455529040151325612827N<strong>on</strong>-Plan1382(32%)1850(34%)5182(60%)273% 234% 465%C.S.S. Total Plan139096358753%428553748597251%1109794N<strong>on</strong>-Plan9710098C.S.S.1049181Total1039795( 25 )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!