12.07.2015 Views

Download 2004 Annual Report - Polymetal

Download 2004 Annual Report - Polymetal

Download 2004 Annual Report - Polymetal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sergey G. Antipin,Managing DirectorSergey A. Egorov,Chief GeologistVladimir I. Fedorov,Head of the Plantwill allow us to process more than500,000 tpa of ore. And in the fol−lowing year − with the introductionof a third grinding stage − we planto increase production capacityto 600,000 tpa of ore. As part ofthe continuing process of improv−ing production and ensuring thatthe deposit is a world leader, thecompany plans to design a facilityfor the filtering and semidry stor−age of filter cakes from waste tail−ings.The company is also planning toincrease its mineral reserve baseby engaging in active geologicalsurveys in the near and far flanksof the Khakanjinskoye deposit andthe Okhotsk Region in general.Indicator Unit <strong>2004</strong> 2003Total rock mined m 3 1 196 286 732 380including striping m 3 927 782 708 918Ore minedm 3 268 504 23 462th tons 610 553 54 783Au ave. head grade g/ton 7,2 6,3Ag ave. head grade g/ton 228,0 239,2Ore processed th. tons 212 720 31 899Au ave. head grade g/ton 13,3 10,6Ag ave. head grade g/ton 425,3 366,7Au recovery rate % 94% −Ag recovery rate % 49% −Au produced th. oz. 79,0 −Ag produced th. oz. 1 465 −Au sales th. oz. 75,8 −Ag sales th. oz. 1 127 −Total cash costs * $US/oz. Au 114 −Note:* The calculations take into account that silver is a co−product at the Khakanjinskoye deposit (according to GoldInstitute Standards). In 2003, only mining operations took place at the Khakanjinskoye deposit; no metal productionoccurred.Khakanjinskoye deposit29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!